A. Close Access
(1)
Install the access panels 191KB, 191BB, 192KB. (Ref. TASK 53-35-13-400-002)
(2)
Remove the access platform(s).
TASK 05-21-90-200-003
Zonal Inspection of the Offwing escape-slide Stowage Area
1.
Reason for the Job
__________________
Refer to the MPD TASK: ZL-193-01
2.
Job Set-up Information
______________________
A. Fixtures, Tools, Test and Support Equipment
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
No specific access platform 2 m (6 ft. 7 in.)
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
25-62-42-000-001 Offwing Escape-Slide - Removal
25-62-42-400-001 Offwing Escape-Slide - Installation
53-35-11-000-001 Removal of the Wing-to-Fuselage Fairings
53-35-11-400-001 Installation of the Wing-to-Fuselage Fairings
3. Job Set-up
__________ R **ON A/C 001-049, 051-099, 101-149, 151-199, 201-299, 401-499,
Subtask 05-21-90-010-052
A. Get Access WARNING : MAKE SURE THAT THE SAFETY/LOCK PIN IS CORRECTLY INSTALLED IN
_______ THE REGULATOR VALVE ASSEMBLY OF THE INFLATION RESERVOIR. THIS PREVENTS ACCIDENTAL:
-DISCHARGE OF THE INFLATION RESERVOIR
-DEPLOYMENT OF THE ESCAPE-SLIDE WHICH CAN CAUSE INJURY AND/OR DAMAGE.
(1)
Put an access platform in position at the zones 193 and 194.
(2)
Remove the offwing escape-slide enclosure (Ref. TASK 25-62-42-000-001)
**ON A/C 301-399,
Subtask 05-21-90-010-052-A
A. Get Access
(1) Put an access platform in position at the zones 193 and 194.
(2) Remove the access panels 193AT, 194AT; (Ref. TASK 53-35-11-000-001) **ON A/C ALL
4. Procedure
_________
Subtask 05-21-90-210-052
A. Inspection
(1)
Do a general visual inspection of the stowage for the upper-wing fairing slide.
(2)
Make sure that there are no signs of corrosions, craks or damages.
(3)
Make sure that all the installations (wiring, ducting, piping) are attached correctly.
5. Close-up
________ R **ON A/C 001-049, 051-099, 101-149, 151-199, 201-299, 401-499,
Subtask 05-21-90-410-052
A. Close Access
(1)
Install the offwing escape slide enclosure (Ref. TASK 25-62-42-400-001)
(2)
Remove the access platform(s).
R **ON A/C 301-399,
R Subtask 05-21-90-410-052-A
R A. Close Access
R (1) Install the access panels 193AT, 194AT; (Ref. TASK 53-35-11-400-001).
R (2) Remove the access platform(s).
R 1EFF : 301-399, 1 05-21-90Page 605 1 1 May 01/04 1 1 1CES 1
**ON A/C ALL
TASK 05-21-90-200-005
R Zonal Inspection of the Hydraulic Compartment and Fairings
1. Reason for the Job__________________
Refer to the MPD TASK: ZL-195-01
2. Job Set-up Information______________________
A. Fixtures, Tools, Test and Support Equipment
-------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific 1 ACCESS PLATFORM 2M (6 FT)
B. Referenced Information
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
05-21-90-991-004 Fig. 601
3. Job Set-up__________
Subtask 05-21-90-010-054
A. Get Access
R (1) Put an ACCESS PLATFORM 2M (6 FT) in position at zones 195 and 196.
R R (2) Open the hydraulic reservoir pressurization access-door 195BB and the Yellow hydraulic compartment access-door 196BB. (Ref. Fig. 601/TASK 05-21-90-991-004)
R Hydraulic Compartment Access Doors (195BB and 196BB) Figure 601/TASK 05-21-90-991-004 中国航空网 www.aero.cn 航空翻译 www.aviation.cn 本文链接地址:A320飞机维护手册 AMM 时间限制/维护检查 3(38)