• 热门标签

当前位置: 主页 > 航空资料 >

时间:2011-02-11 09:56来源:蓝天飞行翻译 作者:admin
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

 Excess of VMO/MMO
 INSPECTION AFTER LIGHTNING STRIKE  05-51-18
 INSPECTION/CHECK 
Inspection after Lightning Strike 
INSPECTION AFTER ENGINE BIRD STRIKE OR  05-51-19
 SLUSH INGESTION
 INSPECTION/CHECK 
Inspection of the Engine after a 
Bird Strike or Slush Ingestion
 INSPECTION AFTER TAIL RUNWAY IMPACT  05-51-21
 INSPECTION/CHECK 
Inspection after a Tail Runway 
Impact
 INSPECTION AFTER NLG TOWING OVERLOAD  05-51-22
 OR OVERRUN
 INSPECTION/CHECK 
Inspection After a NLG Towing 
Overload or Overrun
 INSPECTION AFTER NLG STEERING ANGLE  05-51-23
 EXCEEDED
 INSPECTION/CHECK 
Inspection after NLG Steering 
Angle of more than 95.
 INSPECTION AFTER LEAVING RUNWAY OR  05-51-24
 TAXIWAY
 INSPECTION/CHECK 
Inspection after Leaving Runway or 
Taxiway
 INSPECTION AFTER FLIGHT THROUGH DUST  05-51-25
 STORM/VOLCANIC ASH OR SEVERE
 CONDITIONS ON GROUND
 INSPECTION/CHECK 
Inspection after Flight through 
Dust Storm or Dust Contamination
 on Ground
 Inspection after Flight through 

PAGE EFFECTIVITY

601 601
601 601
601 601
601 601
601 601
601 601
601 601
601 601
601
601

622

ALL
ALL

ALL
ALL

ALL
ALL

ALL
ALL

ALL
ALL

ALL
ALL

ALL
ALL

ALL
ALL

ALL
ALL

ALL

 05-CONTENTS Page 12 Aug 01/05 R CES


 CHAPTER 05
 TIME LIMITS/MAINTENANCE CHECKS
 TABLE OF CONTENTS

 SUBJECT_______  CH/SE/SU________  C_ 
Volcanic Ash or Volcanic Ash
 Contamination on Ground
 INSPECTION AFTER ENGINE FAILURE  05-51-26
 INSPECTION/CHECK 
INSPECTION AFTER ENGINE FAILURE 
INSPECTION AFTER IMPACT ON ENGINE  05-51-27
 COWLS
 INSPECTION/CHECK 
Inspection after Impact on Engine 
Cowls
 PROCEDURE AFTER FLUID SPILLAGE  05-51-28
 INSPECTION/CHECK 
Procedure after Fluid Spillage 
INSPECTION AFTER ABNORMAL PAX/CREW  05-51-29
 DOOR MOVEMENT
 INSPECTION/CHECK 
Inspection after Abnormal Movement 
of the Pax/Crew Door 
Inspection after Abnormal Movement 
of the Pax/Crew or Emergency Exit
 INSPECTION AFTER SIGNIFICANT MLG  05-51-31
 VIBRATION AT TOUCH-DOWN
 INSPECTION/CHECK 
Inspection after Significant MLG 
Vibration at Touch-Down
 INSPECTION AFTER ENGINE WINDMILLING  05-51-34
 (AFTER ENGINE IN-FLIGHT SHUT-DOWN)
 INSPECTION/CHECK 
Inspection after Engine 
Windmilling (After Engine
 In-Flight Shut-Down)
 INSPECTION AFTER OVERWEIGHT TAXIING  05-51-41
 INSPECTION/CHECK 
Inspection after Overweight 
Taxiing
 INSPECTION AFTER VERY HIGH WINDS ON  05-51-42
 GROUND
 INSPECTION/CHECK 
Inspection after Very High Winds 
on Ground
 INSPECTIONS AFTER WORK ON SYSTEM  05-51-43
 ELECTRICAL INSTALLATION
 ADJUSTMENT/TEST 
Inspection after Work on System 
Electrical Installation 

PAGE EFFECTIVITY

ALL ALL
ALL ALL
ALL ALL
ALL 001-049, 051-099 101-149, 151-199 201-299, 401-499 301-399,
ALL ALL
ALL ALL
ALL ALL
ALL ALL
ALL
ALL

601 601
601 601
601 601
601 601
611
601 601
601 601
601 601
601 601
501
501

05-CONTENTS Page 13 Aug 01/05 R CES


 CHAPTER 05
 TIME LIMITS/MAINTENANCE CHECKS
 TABLE OF CONTENTS

 SUBJECT_______  CH/SE/SU________  C_ 
INSPECTION AFTER FLIGHT IN BAD ICING  05-51-45
 CONDITIONS
 INSPECTION/CHECK 
Inspection after Flight in Bad 
Icing Conditions
 PRESSURIZATION TEST OF FUSELAGE (LEAKAGE  05-53-00
 CHECKS) AFTER A/C ABNORMAL OPERATION OR
 REPAIR
 ADJUSTMENT/TEST 
Test for Leakage in the Repair 
Area at a Differential Pressure of
 280 mbar (4.06 psi)
 Test for Leakage in the Repair 
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM 时间限制/维护检查 3(15)