3.
Job Set-up
__________
Subtask 05-28-00-869-050
A. Not Applicable.
4. Procedure
_________
Subtask 05-28-00-210-050
A. Inspection
(1)
Do a general visual inspection of the doors from the ground during the aircraft walkaround.
(2)
Make sure that there are no signs of corrosion, cracks or damage.
ZONAL INSPECTION : AVIONICS COMPARTMENT DOORS (FORWARD AND LATERAL)___________________________________________________________________ INSPECTION/CHECK________________
TASK 05-28-10-200-001
R Zonal Inspection of Forward Avionics Compartment Door
1. Reason for the Job__________________
Refer to the MPD TASK: ZL-811-01
2. Job Set-up Information______________________
A. Fixtures, Tools, Test and Support Equipment
-------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific access platform 1.80 m (5 ft. 11 in.)
B. Referenced Information
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
R R 52-41-00-010-002 52-41-00-410-002 05-28-10-991-001 Open the Avionics Compartment Doors for Access Close the Avionics Compartment Doors after AccessFig. 601
3. Job Set-up__________
Subtask 05-28-10-010-050
A. Get Access
(1) Put an access platform in position at the zone 811.
R R (2) Open the forward avionics compartment door 811, (Ref. TASK 52-41-00-010-002). (Ref. Fig. 601/TASK 05-28-10-991-001)
R Avionics Compartment Left Side Door and Forward Door Figure 601/TASK 05-28-10-991-001
1EFF : ALL 1 05-28-10Page 602 1 1 Nov 01/03 1 1 1CES 1
4. Procedure
_________
Subtask 05-28-10-210-050
A. Inspection
R R (1) Do a general visual inspection of the forward avionics compartment door.
(2) Make sure that there are no signs of corrosion, cracks or damage.
5. Close-up________
Subtask 05-28-10-410-050
A. Close Access
R R (1) Close the forward avionics compartment door 811, (Ref. TASK 52-41-00-410-002).
(2) Remove the access platform(s).
TASK 05-28-10-200-002
R Zonal Inspection of Forward Avionics Compartment Door
1. Reason for the Job__________________
Refer to the MPD TASK: ZL-811-02
2. Job Set-up Information______________________
A. Fixtures, Tools, Test and Support Equipment
-------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific access platform 1.80 m (5 ft. 11 in.)
B. Referenced Information
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
R R 52-41-00-010-002 52-41-00-410-002 05-28-10-991-001 Open the Avionics Compartment Doors for Access Close the Avionics Compartment Doors after AccessFig. 601
3. Job Set-up__________
Subtask 05-28-10-010-051
A. Get Access
(1) Put an access platform in position at the zone 811.
R R (2) Open the forward avionics compartment door 811, (Ref. TASK 52-41-00-010-002). (Ref. Fig. 601/TASK 05-28-10-991-001)
(3) Remove the door panel and the insulation blanket.
4. Procedure
_________
Subtask 05-28-10-210-051
A. Inspection
R R (1) Do a general visual inspection of the forward avionics compartment door.
(2) Make sure that there are no signs of corrosion, cracks or damage.
5. Close-up________
Subtask 05-28-10-410-051
A. Close Access
R (1) Install the door panel and the insulation blanket.
R R (2) Close the forward avionics compartment door 811, (Ref. TASK 52-41-00-410-002).
(3) Remove the access platform(s).
TASK 05-28-10-200-003
R Zonal Inspection of Lateral Avionics Compartment Doors
1.
Reason for the Job
__________________
Refer to the MPD TASK: ZL-812-01
2.
Job Set-up Information
______________________
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM 时间限制/维护检查 3(89)