 Zonal Inspection of the Main Gear Well and the Hydraulics Compartment (Zones 147 and 148)
 1. Reason for the Job
__________________
 Refer to the MPD TASK: ZL-147-03
 2. Job Set-up Information
______________________
 A. Fixtures, Tools, Test and Support Equipment
 -------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific access platform 2 m (6 ft. 7 in.)
 B. Referenced Information
 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
53-35-13-000-001 Removal of the Belly Fairing Access Panels 53-35-13-400-001 Installation of the Belly Fairing Access Panels
 3. Job Set-up
__________ Subtask 05-21-40-010-054
 A. Get Access
 (1)
 Put an access platform in position at the zones 147 and 148.

 (2)
 Remove the access panels:
 147AB, 147EB.
 (Ref. TASK 53-35-13-000-001)

 


 4. Procedure
_________

 Subtask 05-21-40-210-054
 A. Inspection
 (1)
 Do a general visual inspection of the main gear well and the hydraulics compartment (Zone 147 and 148).

 (2)
 Make sure that there are no signs of corrosion, cracks or damage.

 (3)
 Make sure that all the installations (wiring, ducting, piping) are attached correctly.


 5. Close-up
________ Subtask 05-21-40-410-054
 A. Close Access
 (1)
 Install the access panels:
 147AB, 147EB.
 (Ref. TASK 53-35-13-400-001)


 (2)
 Remove the access platform(s).

 


 ZONAL INSPECTION : AFT CARGO COMPARTMENT - INSPECTION/CHECK
___________________________________________________________
 TASK 05-21-50-200-001
R Zonal Inspection of Aft Cargo Compartment (As Far As Visible - If A/CT(s) is R Installed)
 1.
 Reason for the Job

__________________
 Refer to the MPD TASK: ZL-151-01


 2.
 Job Set-up Information


______________________
 A. Fixtures, Tools, Test and Support Equipment
 -------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific  access platform 2 m (6 ft. 7 in.)
 B. Referenced Information
 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
52-30-00-860-001  Open the FWD or AFT Cargo-Compartment Door with the Yellow Electric Pump 52-30-00-860-002 Close the FWD or AFT Cargo-Compartment Door with the Yellow Electric Pump
 3. Job Set-up
__________
 Subtask 05-21-50-010-050

 A. Get Access
 (1)
 Put an access platform in position at zone 152.

 (2)
 Open the AFT cargo compartment door 826 (Ref. TASK 52-30-00-860-001).

 

 4. Procedure
_________

 Subtask 05-21-50-210-050
 A. Inspection 
R R  (1) Do a general visual inspection of the aft cargo compartment (as far as you can see - if A/CT(S) is installed).
R  (2) Make sure that there are no signs of corrosion, cracks or damage. 
5. Close-up________
 Subtask 05-21-50-410-050
 A. Close Access
 (1) Close the AFT cargo compartment door 826 (Ref. TASK 52-30-00-860-002).
 (2) Remove the access platform(s).


 TASK 05-21-50-200-002


 Zonal Inspection of Underfloor Bay of Aft Cargo Compartment
 1.
 Reason for the Job

__________________
 Refer to the MPD TASK: ZL-153-01


 2.
 Job Set-up Information


______________________
 A. Fixtures, Tools, Test and Support Equipment
 -------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
 -------------------------------------------------------------------------------
No specific access platform 2 m (6 ft. 7 in.)
 B. Referenced Information
 -------------------------------------------------------------------------------
REFERENCE DESIGNATION
 -------------------------------------------------------------------------------
 