R TASK 05-27-30-200-002
R Zonal Inspection of Main Landing Gear Cylinder Door
R 1. Reason for the Job__________________
R Refer to the MPD TASK: ZL-732-01
R 2. Job Set-up Information______________________
R Not Applicable
R 3. Job Set-up__________
R Subtask 05-27-30-010-051
R A. Not Applicable
R 4. Procedure_________
R Subtask 05-27-30-210-051
R A. Inspection
R (1) Do a general visual inspection of the main landing gear cylinder
R door. This inspection includes the zones 732 and 742.
R (2) Make sure that there are no signs of corrosion, cracks or damage.
R (3) Make sure that all the installations (wiring, ducting, piping) are
R attached correctly.
R TASK 05-27-30-200-003
R Zonal Inspection of Main Landing Gear Secondary Door
R 1. Reason for the Job__________________
R Refer to the MPD TASK: ZL-733-01
R 2. Job Set-up Information______________________
R Not Applicable
R 3. Job Set-up__________
R Subtask 05-27-30-010-052
R A. Not Applicable
R 4. Procedure_________
R Subtask 05-27-30-210-052
R A. Inspection
R (1) Do a general visual inspection of the main landing gear secondary
R door. This inspection includes the zones 733 and 743.
R (2) Make sure that there are no signs of corrosion, cracks or damage.
R (3) Make sure that all the installations (wiring, ducting, piping) are
R attached correctly.
R TASK 05-27-30-200-004
R Zonal Inspection of Main Landing Gear Main Doors
R 1. Reason for the Job__________________
R Refer to the MPD TASK: ZL-734-01
R 2. Job Set-up Information______________________
R A. Referenced Information
R -------------------------------------------------------------------------------
R REFERENCE DESIGNATION
R -------------------------------------------------------------------------------
R 32-12-00-010-001 Open the Main Gear Doors for Access
R 32-12-00-410-001 Close the Main Gear Doors after Access
R 3. Job Set-up__________
R Subtask 05-27-30-010-053
R A. Get Access
R (1) Open the main gear doors 734, 744. (Ref. TASK 32-12-00-010-001)
R 4. Procedure_________
R Subtask 05-27-30-210-053
R A. Inspection
R (1) Do a general visual inspection of the main landing gear main doors.
R This inspection includes the zones 734 and 744.
R (2) Make sure that there are no signs of corrosion, cracks or damage.
R (3) Make sure that all the installations (wiring, ducting, piping) are
R attached correctly.
R 5. Close-up________
R Subtask 05-27-30-410-053
R A. Close Access
R (1) Close the main gear doors 734, 744. (Ref. TASK 32-12-00-410-001)
ZONAL INSPECTION : DOORS - INSPECTION/CHECK
___________________________________________
TASK 05-28-00-200-001
Zonal Inspection of the Doors as far as Visible from the Ground
1. Reason for the Job
__________________
R R Self Explanatory
2.
Job Set-up Information
______________________
Not Applicable
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM 时间限制/维护检查 3(88)