**ON A/C ALL
4. Procedure
_________
Subtask 05-28-20-210-054
A. Inspection
(1)
Do a general visual inspection of the AFT cargo-compartment door.
(2)
Make sure that there are no signs of corrosion, cracks or damage.
(3)
Make sure that all the installations (wiring,piping) are attached correctly.
5. Close-up
________
**ON A/C 001-049, 051-099, 101-149, 201-299, 301-399,
Subtask 05-28-20-410-054
A. Close Access
(1)
Install the insulation blanket and the access panel 826AR.
(2)
Close the AFT cargo-compartment door 826. (Ref. TASK 52-30-00-860-002)
(3) Remove the access platform(s). R **ON A/C 151-199, 401-499,
Subtask 05-28-20-410-054-A
A. Close Access
(1)
Install the insulation blanket and the access panels 826AR, 826BR, 826CR.
(2)
Close the AFT cargo-compartment door 826. (Ref. TASK 52-30-00-860-002)
(3)
Remove the access platform(s).
R **ON A/C 001-049, 051-099, 101-149, 221-221, 224-224, 228-228,
TASK 05-28-20-200-006
Zonal Inspection of the Bulk Cargo-Compartment Door and the Stop Fittings on the Fuselage Door Frame
1.
Reason for the Job
__________________
Refer to the MPD TASK: ZL-827-02
2.
Job Set-up Information
______________________
A. Referenced Information
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
52-30-00-860-006 Open the Bulk Cargo-Compartment Door 52-30-00-860-008 Close the Bulk Cargo-Compartment Door
3. Job Set-up
__________ Subtask 05-28-20-010-055
A. Get Access
(1) Open the bulk cargo-compartment door 827. (Ref. TASK 52-30-00-860-006)
NOTE : Lift the insulation blankets sufficiently to complete a
____ correct general visual inspection as necessary.
4. Procedure
_________ Subtask 05-28-20-210-055
A. Inspection
(1)
Do a general visual inspection of the bulk cargo-compartment door and the stop fittings on the fuselage door frame.
(2)
Make sure that there are no signs of corrosion, cracks or damage.
(3)
Make sure that all the installations are attached correctly.
R 1EFF : 001-049, 051-099, 101-149, 221-221, 1 05-28-20Page 615 1224-224, 228-228, 1May 01/05 1 1 1CES 1
5. Close-up
________ Subtask 05-28-20-410-055
A. Close Access
(1) Close the bulk cargo-compartment door 827. (Ref. TASK 52-30-00-860-008)
R 1EFF : 001-049, 051-099, 101-149, 221-221, 1 05-28-20Page 616 1224-224, 228-228, 1May 01/05 1 1 1CES 1
**ON A/C ALL
TASK 05-28-20-200-007 R Zonal Inspection of Rear Avionic Compartment Door
1.
Reason for the Job
__________________
Refer to the MPD TASK: ZL-824-01
2.
Job Set-up Information
______________________
A. Fixtures, Tools, Test and Support Equipment
-------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific access platform 1.80 m (5 ft. 11 in.)
B. Referenced Information
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
52-41-00-010-002 Open the Avionics Compartment Doors for Access 52-41-00-410-002 Close the Avionics Compartment Doors after Access 05-28-20-991-002 Fig. 602
3. Job Set-up
__________
Subtask 05-28-20-010-056
A. Get Access
R (1) Put an access platform in position at zone 824.
R (2) Open the rear avionic compartment door 824 (Ref. TASK 52-41-00-010-002). (Ref. Fig. 602/TASK 05-28-20-991-002)
R Rear Avionic Compartment Door Figure 602/TASK 05-28-20-991-002
1EFF : 1 1 1CES ALL 1 111 05-28-20 Page 618 May 01/05
4. Procedure
_________
Subtask 05-28-20-210-056
A. Inspection R (1) Do a general visual inspection of the rear avionic compartment door.
(2) Make sure that there are no signs of corrosion, cracks or damage.
5. Close-up
________
Subtask 05-28-20-410-056
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM 时间限制/维护检查 3(93)