4. Procedure
_________
Subtask 05-28-20-210-050
A. Inspection
R R R (1) Do a general visual inspection of the forward cargo-compartment door. This inspection includes the fuselage door sill, door seal and lock fittings.
(2) Make sure that there are no signs of corrosion, cracks or damage.
(3) Make sure that all the installations (wiring,piping) are attached correctly.
5. Close-up________
Subtask 05-28-20-410-050
A. Close Access
R (1) Close the forward cargo-compartment door 825. (Ref. TASK 52-30-00-860-002)
R (2) Remove the access platform(s).
TASK 05-28-20-200-002
R R Zonal Inspection of AFT Cargo-Compartment Door Including Fuselage Door Sill, Door Seal and Lock Fittings
1. Reason for the Job__________________
Refer to the MPD TASK: ZL-826-01
2. Job Set-up Information______________________
R A. Fixtures, Tools, Test and Support Equipment
R R R -------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
R No specific access platform 2.00 m (6 ft. 7 in.)
R B. Referenced Information
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
52-30-00-860-001 52-30-00-860-002
3. Job Set-up
__________ Subtask 05-28-20-010-051
A. Get Access
Open the FWD or AFT Cargo-Compartment Door with the Yellow Electric PumpClose the FWD or AFT Cargo-Compartment Door with the Yellow Electric Pump
R (1) Put an access platform in position at the zone 826.
R (2) Open the AFT cargo-compartment door 826. (Ref. TASK 52-30-00-860-001)
4. Procedure
_________
Subtask 05-28-20-210-051
A. Inspection
R R R (1) Do a general visual inspection of the AFT cargo-compartment door. This inspection includes the fuselage door sill, door seal and lock fittings.
(2) Make sure that there are no signs of corrosion, cracks or damage.
(3) Make sure that all the installations (wiring, piping) are attached correctly.
5. Close-up________
Subtask 05-28-20-410-051
A. Close Access
R (1) Close the AFT cargo-compartment door 826 (Ref. TASK 52-30-00-860-002).
R (2) Remove the access platform(s).
R **ON A/C 001-049, 051-099, 101-149, 221-221, 224-224, 228-228,
TASK 05-28-20-200-003
Zonal Inspection of the Bulk Cargo-Compartment Door and the Stop Fittings on the Door Frame
1.
Reason for the Job
__________________
Refer to the MPD TASK: ZL-827-01
2.
Job Set-up Information
______________________
A. Referenced Information
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
52-30-00-860-006 Open the Bulk Cargo-Compartment Door 52-30-00-860-008 Close the Bulk Cargo-Compartment Door
3. Job Set-up
__________ Subtask 05-28-20-010-052
A. Get Access
(1) Open the bulk cargo-compartment door 827. (Ref. TASK 52-30-00-860-006)
4. Procedure
_________ Subtask 05-28-20-210-052
A. Inspection
(1)
Do a general visual inspection of the bulk cargo-compartment door and the stop fittings on the door frame.
(2)
Make sure that there are no signs of corrosion, cracks or damage.
R 1EFF : 001-049, 051-099, 101-149, 221-221, 1 05-28-20Page 605 1224-224, 228-228, 1May 01/05 1 1 1CES 1
5. Close-up
________ Subtask 05-28-20-410-052
A. Close Access
(1) Close the bulk cargo-compartment door 827. (Ref. TASK 52-30-00-860-008)
R 1EFF : 001-049, 051-099, 101-149, 221-221, 1 05-28-20Page 606 1224-224, 228-228, 1May 01/05 1 1 1CES 1 **ON A/C ALL
TASK 05-28-20-200-004
Zonal Inspection of FWD Cargo-Compartment Door
1.
Reason for the Job