R 1EFF : 151-199, 301-399, 401-499, 1 05-22-50Page 613 1 1 Aug 01/05 1 1 1CES 1
R 251CW, 251GX, 251QX,
R 251FW, 251JW, 251MW,
R 251QW, 251TW, 251WW,
R 251ZW, 251FX,
R 252CW, 252GX, 252QX,
R 252FW, 252JW, 252MW,
R 252QW, 252TW, 252WW,
R 252ZW, 252FX.
R (Ref. TASK 25-23-48-400-001)
R 251BW, 251PX, 251EW,
R 251HW, 251LW, 251PW,
R 251SW, 251VW, 251YW,
R 251EX,
R 252BW, 252PX, 252EW,
R 252HW, 252LW, 252PW,
R 252SW, 252VW, 252YW,
R 252EX.
R (Ref. TASK 25-23-43-400-001)
R 251AW, 251NX, 251DW,
R 251GW, 251KW, 251NW,
R 251RW, 251UW, 251XW,
R 251DX,
R 252AW, 252NX, 252DW,
R 252GW, 252KW, 252NW,
R 252RW, 252UW, 252XW,
R 252DX.
R (Ref. TASK 25-23-44-400-001)
R (2) Close the Passenger/Crew door 832 (842) (Ref. TASK 52-10-00-410-001).
R (3) Remove the access platform(s).
R 1EFF : 301-399, 1 05-22-50Page 614 1 1 May 01/04 1 1 1CES 1
**ON A/C ALL
TASK 05-22-50-200-003
Zonal Inspection of Aft Passenger Overhead Compartment
1.
Reason for the Job
__________________
Refer to the MPD TASK: ZL-253-01
2.
Job Set-up Information
______________________
A. Fixtures, Tools, Test and Support Equipment
-------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific access platform 3.50 m (11 ft. 6 in.)
B. Referenced Information
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
25-23-41-000-001 Removal of the Ceiling Panels 25-23-41-400-001 Installation of the Ceiling Panels 25-24-41-000-001 Removal of the Overhead Stowage Compartments 25-24-41-400-001 Installation of the Overhead Stowage Compartments 52-10-00-010-001 Opening of the Passenger/Crew Door 52-10-00-410-001 Closing of the Passenger/Crew Door
**ON A/C 001-049, 051-099, 101-149, 201-299,
05-22-50-991-001 Fig. 601 R **ON A/C 151-199, 401-499,
05-22-50-991-001-A Fig. 601A -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
**ON A/C 301-399,
05-22-50-991-001-B Fig. 601B
**ON A/C ALL
3. Job Set-up
__________
Subtask 05-22-50-010-052
A. Get Access
(1)
Put an access platform in position at zone 832 (842).
(2)
Open the Passenger/Crew door 832 (842) (Ref. TASK 52-10-00-010-001).
(3)
Remove the lavatories, if installed.
(4)
Remove the galleys, if installed.
(5)
Remove the overhead stowage compartments (Ref. TASK 25-24-41-000-001).
(6) Remove the ceiling panels:
**ON A/C 001-049, 051-099, 101-149, 201-299,
(Ref. Fig. 601/TASK 05-22-50-991-001) R **ON A/C 151-199, 401-499,
(Ref. Fig. 601A/TASK 05-22-50-991-001-A)
**ON A/C 301-399,
(Ref. Fig. 601B/TASK 05-22-50-991-001-B)
**ON A/C ALL
251AC, 251BC, 251CC,
251DC, 251EC, 251FC,
251GC, 251HC, 251JC
(Ref. TASK 25-23-41-000-001).
4. Procedure
_________ Subtask 05-22-50-210-052
A. Inspection
(1)
Do a general visual inspection of the aft passenger overhead compartment.
(2)
Make sure that there are no signs of corrosion, cracks or damage.
(3)
Make sure that all the installations (wiring, ducting, piping) are attached correctly.
NOTE : Lift the insulation blankets sufficiently to complete a
____ correct general visual inspection as necessary.
5. Close-up
________ Subtask 05-22-50-410-052
A. Close Access
中国航空网 www.aero.cn