4. Procedure
_________
Subtask 05-25-70-210-052
A. Inspection
(1)
Do a general visual inspection of the fixed structure.
(2)
Make sure that there are no signs of corrosion, cracks or damage.
(3)
Make sure that all the installations (wiring, ducting, piping) are attached correctly.
5. Close-up
________ Subtask 05-25-70-942-051
A. Close Access
(1) Remove the access platform(s). Subtask 05-25-70-866-053
B. Aircraft Maintenance Configuration
(1)
Fully retract the flaps (Ref. TASK 27-50-00-866-009).
(2)
Retract the spoilers (Ref. TASK 27-60-00-866-002).
1EFF : ALL 1 05-25-70Page 612 1 1 Nov 01/01R 1 1 1CES 1
TASK 05-25-70-200-004
Zonal Inspection of the False Spar Box
1.
Reason for the Job
__________________
Refer to the MPD TASK: ZL-574-01
2.
Job Set-up Information
______________________
A. Fixtures, Tools, Test and Support Equipment
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
No specific access platform 2 m (6 ft. 7 in.)
B. Referenced Information
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
**ON A/C 001-049, 051-057, 101-101,
05-25-70-991-001 Fig. 601 R **ON A/C 058-099, 102-149, 151-199, 201-299, 301-399, 401-499,
05-25-70-991-001-A Fig. 601A
**ON A/C 001-049, 051-057, 101-101,
05-25-70-991-003 Fig. 602 R **ON A/C 058-099, 102-149, 151-199, 201-299, 301-399, 401-499,
05-25-70-991-003-A Fig. 602A
**ON A/C ALL
3. Job Set-up
__________
Subtask 05-25-70-010-053
A. Get Access
(1)
Put an access platform in position.
(2)
Remove the access panels
573DB, 573EB, 574AB,
574BB.
**ON A/C 001-049, 051-057, 101-101,
(Ref. Fig. 601/TASK 05-25-70-991-001) R **ON A/C 058-099, 102-149, 151-199, 201-299, 301-399, 401-499,
(Ref. Fig. 601A/TASK 05-25-70-991-001-A)
**ON A/C ALL
673DB, 673EB, 674AB,
674BB.
**ON A/C 001-049, 051-057, 101-101,
(Ref. Fig. 602/TASK 05-25-70-991-003) R **ON A/C 058-099, 102-149, 151-199, 201-299, 301-399, 401-499,
(Ref. Fig. 602A/TASK 05-25-70-991-003-A)R **ON A/C ALL
4. Procedure
_________
Subtask 05-25-70-210-053
A. Inspection
(1)
Do a general visual inspection of the false spar box.
(2)
Make sure that there are no signs of corrosion, cracks or damage.
(3)
Make sure that all the installations (wiring, ducting, piping) are attached correctly.
5. Close-up
________
Subtask 05-25-70-410-053
A. Close Access
(1)
Install the access panels
573DB, 573EB, 574AB,
574BB.
673DB, 673EB, 674AB,
674BB.
(2)
Remove the access platform(s).
TASK 05-25-70-200-005
Zonal Inspection of the Outboard Fixed Trailing Edge Structure from the Rib 9 to the Rib 27
WARNING : DO NOT EXTEND THE SLATS AND FLAPS WHEN THE THRUST REVERSER COWLS ARE
_______
DEPLOYED IN THE 45 DEG. POSITION.
1.
Reason for the Job
__________________
Refer to the MPD TASK: ZL-575-01
2.
Job Set-up Information
______________________
A. Fixtures, Tools, Test and Support Equipment
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
No specific access platform 2 m (6 ft. 7 in.)
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM 时间限制/维护检查 3(85)