28-11-27-000-001 Removal of the Additional Center Tank (ACT) 28-11-27-400-001 Installation of the Additional Center Tank (ACT) 52-30-00-860-001 Open the FWD or AFT Cargo-Compartment Door with the
 Yellow Electric Pump 52-30-00-860-002 Close the FWD or AFT Cargo-Compartment Door with the Yellow Electric Pump 53-42-14-000-001 Removal of the AFT Cargo-Compartment Floor-Panels Zone 150 53-42-14-400-001 Installation of the AFT Cargo-Compartment Floor-Panels Zone 150
 3. Job Set-up
__________ R **ON A/C 001-049, 051-099, 101-149, 201-299,
 Subtask 05-21-50-010-051
 A. Get Access
 (1)
 Put an access platform in position at zones 153 and 154.

 (2)
 Open the AFT cargo compartment door 826 (Ref. TASK 52-30-00-860-001).

 (3)
 Remove the floor panels between FR46 and FR59
 (Ref. TASK 53-42-14-000-001).

 

 

R **ON A/C 151-199, 401-499,
 Subtask 05-21-50-010-051-F
 A. Get Access
 (1)
 Put an access platform in position at zones 153 and 154.

 (2)
 Open the AFT cargo compartment door 826 (Ref. TASK 52-30-00-860-001).

 (3)
 Remove the floor panels between FR46 and FR60
 (Ref. TASK 53-42-14-000-001).

 

 **ON A/C 301-399,
 Subtask 05-21-50-010-051-E
 A. Get Access
 (1)
 Put an access platform in position at zones 153 and 154.

 (2)
 Open the AFT cargo compartment door 826 (Ref. TASK 52-30-00-860-001).

 (3)
 Remove the floor panels between FR47.2 and FR59
 (Ref. TASK 53-42-14-000-001).

 

 **ON A/C ALL
 Subtask 05-21-50-020-052
 B. Removal of Components
 (1) Remove the Additional Center Tank (ACT), if installed (Ref. TASK 28-11-27-000-001).

 4. Procedure
_________

 Subtask 05-21-50-210-051
 A. Inspection
 (1)
 Do a general visual inspection of the underfloor bay of the aft cargo compartment.

 (2)
 Make sure that there are no signs of corrosion, cracks or damage.

 (3)
 Make sure that all the installations (wiring, ducting, piping) are attached correctly.


 5. Close-up
________
 Subtask 05-21-50-420-052

 A. Installation of Components R (1) Install the ACT, if removed (Ref. TASK 28-11-27-400-001). R **ON A/C 001-049, 051-099, 101-149, 201-299,
 Subtask 05-21-50-410-051
 B. Close Access
 (1)
 Install the floor panels between FR46 and FR59
 (Ref. TASK 53-42-14-400-001).


 (2)
 Close the AFT cargo compartment door 826 (Ref. TASK 52-30-00-860-002).

 (3)
 Remove the access platform(s).

 

 

R **ON A/C 151-199, 401-499,
 Subtask 05-21-50-410-051-F
 B. Close Access
 (1)
 Install the floor panels between FR46 and FR60
 (Ref. TASK 53-42-14-400-001).


 (2)
 Close the AFT cargo compartment door 826 (Ref. TASK 52-30-00-860-002).


 (3) Remove the access platform(s).
 **ON A/C 301-399,

 Subtask 05-21-50-410-051-E
 B. Close Access
 (1)
 Install the floor panels between FR47.2 and FR59 (Ref. TASK 53-42-14-400-001).

 (2)
 Close the AFT cargo compartment door 826 (Ref. TASK 52-30-00-860-002).

 (3)
 Remove the access platform(s).


R 1EFF : 151-199, 301-399, 401-499, 1 05-21-50Page 606 1 1 Aug 01/05 1 1 1CES 1

 **ON A/C ALL


 TASK 05-21-50-200-003
 Zonal Inspection of Aft Cargo Compartment

 1.
 Reason for the Job

__________________
 Refer to the MPD TASK: ZL-151-02


 2.
 Job Set-up Information


______________________
 A. Fixtures, Tools, Test and Support Equipment
 -------------------------------------------------------------------------------
REFERENCE  QTY DESIGNATION
 -------------------------------------------------------------------------------
No specific  access platform 2 m (6 ft. 7 in.)
 B. Referenced Information
 -------------------------------------------------------------------------------
REFERENCE  DESIGNATION
 -------------------------------------------------------------------------------
25-55-11-000-001  Removal of the AFT Cargo-Compartment Partition FR47
 25-55-11-400-001  Installation of the AFT Cargo-Compartment Partition FR47
 52-30-00-860-001  Open the FWD or AFT Cargo-Compartment Door with the Yellow Electric Pump
 