REFERENCE DESIGNATION
-------------------------------------------------------------------------------
**ON A/C 001-049, 051-099, 101-149, 221-221, 224-224, 228-228,
05-21-60-991-002 Fig. 602 R **ON A/C 151-199, 201-220, 222-223, 225-227, 229-299, 301-399, 401-499,
05-21-60-991-002-A Fig. 602A
**ON A/C ALL
3. Job Set-up
__________
**ON A/C 001-049, 051-099, 101-149, 221-221, 224-224, 228-228,
Subtask 05-21-60-010-053
A. Get Access
(1)
Put an access platform in position at the zones 161 and 162.
(2)
Open the AFT cargo-compartment door 826. (Ref. TASK 52-30-00-860-001)
(3)
Remove the ceiling panels: 161AC, 161BC, 162CC.
(Ref. Fig. 601/TASK 05-21-60-991-001)
(4)
Remove the sidewall panels: 161AW, 161BW, 161CW, 162BW, 162CW, 162EW, 162FW, 162GW. (Ref. Fig. 602/TASK 05-21-60-991-002)
(5)
Remove the partition panels: 161DW, 162DW. (Ref. TASK 25-55-12-000-001)
(6)
Remove the floor panels: 161BF, 161CF, 161EF, 161FF, 162EF, 162FF, 162GF, 162HF, 162JF, 162KF, 162LF. (Ref. TASK 53-42-17-000-001)
Floor and Ceiling Panels of the Bulk Cargo Compartment
Figure 601/TASK 05-21-60-991-001
R 1EFF : 001-049, 051-099, 101-149, 221-221, 1 05-21-60Page 611 1224-224, 228-228, 1May 01/05 1 1 1CES 1
Floor and Ceiling Panels of the Bulk Cargo Compartment
Figure 601A/TASK 05-21-60-991-001-A
R 1EFF : 151-199, 201-220, 222-223, 225-227, 1 05-21-60Page 612 1229-299, 301-399, 401-499, 1Aug 01/05 1 1 1CES 1
Sidewall Panels and Partition of the Bulk Cargo Compartment
Figure 602/TASK 05-21-60-991-002
R 1EFF : 001-049, 051-099, 101-149, 221-221, 1 05-21-60Page 613 1224-224, 228-228, 1May 01/05 1 1 1CES 1R **ON A/C 151-199, 201-220, 222-223, 225-227, 229-299, 301-399, 401-499,
Subtask 05-21-60-010-053-A
A. Get Access
(1)
Put an access platform in position at the zones 161 and 162.
(2)
Open the AFT cargo-compartment door 826. (Ref. TASK 52-30-00-860-001)
(3)
Remove the ceiling panels:
161AC, 161BC.
(Ref. Fig. 601A/TASK 05-21-60-991-001-A)
(4)
Remove the sidewall panels: 161AW, 161BW, 161CW, 162AW, 162BW, 162CW. (Ref. Fig. 602A/TASK 05-21-60-991-002-A)
(5)
Remove the partition panels: 161DW, 162DW. (Ref. TASK 25-55-12-000-001)
(6)
Remove the floor panels: 161BF, 161CF, 161EF, 161FF, 162BF, 162CF, 162EF, 162FF. (Ref. TASK 53-42-17-000-001)
**ON A/C ALL
4. Procedure
_________
Subtask 05-21-60-210-053
A. Inspection
(1)
Do a general visual inspection of the bulk cargo compartment.
(2)
Make sure that there are no signs of corrosion, craks or damage.
(3)
Make sure that all the installations (wiring, ducting, piping) are attached correctly.
NOTE : Lift the insulation blankets sufficiently to complete a
____ correct general visual inspection as necessary.
Sidewall Panels and Partition of the Bulk Cargo Compartment Figure 602A/TASK 05-21-60-991-002-A
R 1EFF : 151-199, 201-220, 222-223, 225-227, 1 05-21-60Page 615 1229-299, 301-399, 401-499, 1Aug 01/05 1 1 1CES 1
5. Close-up
________
**ON A/C 001-049, 051-099, 101-149, 221-221, 224-224, 228-228,
Subtask 05-21-60-410-053
A. Close Access
(1)
Install the floor panels:
161BF, 161CF, 161EF,
161FF, 162EF, 162FF,
162GF, 162HF, 162JF,
162KF, 162LF. (Ref. TASK 53-42-17-400-001)
(2)
Install the ceiling panels: 161AC, 161BC, 162CC.