Remove the access panel 321AL.
(Ref. TASK 53-45-11-000-001)
4. Procedure
_________
Subtask 05-23-20-210-050
A. Inspection
(1)
Do a general visual inspection of the dorsal fin.
(2)
Make sure that there are no signs of corrosion, cracks or damage.
(3)
Make sure that all the installations (wiring, ducting, piping) are attached correctly.
5. Close-up
________ Subtask 05-23-20-410-050
A. Close Access
(1)
Install the access panel 321AL.
(Ref. TASK 53-45-11-400-001)
(2)
Remove the access platform(s).
TASK 05-23-20-200-002
R Zonal Inspection of Vertical Stabilizer Leading Edge
1.
Reason for the Job
__________________
Refer to the MPD TASK: ZL-322-01
2.
Job Set-up Information
______________________
A. Fixtures, Tools, Test and Support Equipment
-------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific access platform 6 m (19 ft. 8 in.)
B. Referenced Information
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
55-32-11-000-001 Removal of the Vertical Stabilizer Leading-Edge 55-32-11-400-001 Installation of the Vertical Stabilizer Leading-Edge
3. Job Set-up
__________
Subtask 05-23-20-010-051
A. Get Access R (1) Put an access platform in position at the zone 320.
(2) Remove the access panels:
322AL, 322BL, 322CL.
(Ref. TASK 55-32-11-000-001)
4. Procedure
_________
Subtask 05-23-20-210-051
A. Inspection
(1)
Do a general visual inspection of the leading edge of the vertical stabilizer.
(2)
Make sure that there are no signs of corrosion, cracks or damage.
(3)
Make sure that all the installations (wiring, ducting, piping) are attached correctly.
5. Close-up
________ Subtask 05-23-20-410-051
A. Close Access
(1)
Install the access panels:
322AL, 322BL, 322CL.
(Ref. TASK 55-32-11-400-001)
(2)
Remove the access platform(s).
TASK 05-23-20-200-003
Zonal Inspection of the Spar Box of the Vertical Stabilizer
1. Reason for the Job
__________________
Refer to the MPD TASK: ZL-323-01
2. Job Set-up Information
______________________
A. Fixtures, Tools, Test and Support Equipment
-------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific access platform 6 m (19 ft. 8 in.)
B. Consumable Materials
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
Material No. 08-061 USA MIL-T-4053 TAPE SOUND DAMPENINGALUMINIUM FOIL (Ref. 20-31-00)
C. Referenced Information
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
53-45-11-000-001 Removal of the Dorsal Fin 321AL 53-45-11-400-001 Installation of the Dorsal Fin 321AL 53-55-11-000-001 Removal of the Fairings 323AL/323AR 53-55-11-400-001 Installation of the Fairings 323AL/323AR 53-55-12-000-001 Removal of the Rudder Fairings 325AL and 325AR 53-55-12-400-001 Installation of the Rudder Fairings 325AL and 325AR 55-32-11-000-001 Removal of the Vertical Stabilizer Leading-Edge 55-32-11-400-001 Installation of the Vertical Stabilizer Leading-Edge