R 57-27-11-000-001 Removal of the Access Panel (540AB, 540BB, 540CB,
R 540DB, 540EB, 540FB, 540GB, 640AB, 640BB, 640CB,
R 640DB, 640EB, 640FB, 640GB)
R 57-27-11-000-002 Removal of the Access Panel (540HB, 540JB, 540KB,
R 540LB, 540MB, 540NB, 540PB, 540QB, 540RB, 550AB,
R 550BB, 550CB, 550DB, 560AB, 640HB, 640JB, 640KB,
R ....)
R 57-27-11-400-001 Installation of the Access Panel (540AB, 540BB,
R 540CB, 540DB, 540EB, 540FB, 540GB, 640AB, 640BB,
R 640CB, 640DB, 640EB, 640FB, 640GB)
R 57-27-11-400-002 Installation of the Access Panel (540HB, 540JB,
R 540KB, 540LB, 540MB, 540NB, 540PB, 540QB, 540RB,
R 550AB, 550BB, 550CB, 550DB, 560AB, 640HB, 640JB,
R ....)
R 57-27-12-000-001 Removal of the Fuel-Surge Access Panel
R 57-27-12-400-001 Installation of the Fuel-Surge Access Panel
3. Job Set-up
__________ R **ON A/C 001-049, 051-099, 101-149, 151-199, 201-299, 401-499,
Subtask 05-25-40-010-054
A. Get Access
(1)
Put an access platform in position.
(2)
Remove the access panels
540AB,
640AB (Ref. TASK 57-27-11-000-001),
540AZ, 540BZ,
640AZ, 640BZ (Ref. TASK 57-27-12-000-001),
540JB, 540KB,
640JB, 640KB (Ref. TASK 57-27-11-000-002).
**ON A/C 301-399,
Subtask 05-25-40-010-054-A
A. Get Access
(1)
Put an access platform in position.
(2)
Remove the access panels
540AB,
640AB (Ref. TASK 57-27-11-000-001),
540AZ, 540BZ,
640AZ, 640BZ (Ref. TASK 57-27-12-000-001).
**ON A/C ALL
4. Procedure
_________
Subtask 05-25-40-210-054
A. Inspection
(1)
Do a general visual inspection of the wing fuel tank.
(2)
Make sure that there are no signs of corrosion, cracks or damage.
(3)
Make sure that all the installations (wiring, ducting, piping) are attached correctly.
5. Close-up
________
R **ON A/C 001-049, 051-099, 101-149, 151-199, 201-299, 401-499,
Subtask 05-25-40-410-054
A. Close Access
(1) Install the access panels
540AB,
640AB (Ref. TASK 57-27-11-400-001),
540AZ, 540BZ,
640AZ, 640BZ (Ref. TASK 57-27-12-400-001),
540JB, 540KB,
640JB, 640KB (Ref. TASK 57-27-11-400-002).
**ON A/C 301-399,
Subtask 05-25-40-410-054-A
A. Close Access
(1) Install the access panels
540AB,
640AB (Ref. TASK 57-27-11-400-001),
540AZ, 540BZ,
640AZ, 640BZ (Ref. TASK 57-27-12-400-001).
R **ON A/C ALL
TASK 05-25-40-200-004
Zonal Inspection of the Wing Fuel Tank
1. Reason for the Job
__________________
Refer to the MPD TASK: ZL-540-02
2. Job Set-up Information
______________________
A. Fixtures, Tools, Test and Support Equipment
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
No specific access platform 2 m (6 ft. 7 in.)
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
57-27-11-000-001 Removal of the Access Panel (540AB, 540BB, 540CB, 540DB, 540EB, 540FB, 540GB, 640AB, 640BB, 640CB, 640DB, 640EB, 640FB, 640GB)
57-27-11-000-002 Removal of the Access Panel (540HB, 540JB, 540KB, 540LB, 540MB, 540NB, 540PB, 540QB, 540RB, 550AB, 550BB, 550CB, 550DB, 560AB, 640HB, 640JB, 640KB, ....)
57-27-11-000-003 Removal of the Closing Panel 540CZ
57-27-11-000-005 Removal of the Access Panel 521AZ(621AZ),
521BZ(621BZ), 521CZ(621CZ)
R 57-27-11-000-007 Removal of the Closing Panel
R 540CZ(640CZ),540DZ(640DZ) 57-27-11-400-001 Installation of the Access Panel (540AB, 540BB, 540CB, 540DB, 540EB, 540FB, 540GB, 640AB, 640BB, 640CB, 640DB, 640EB, 640FB, 640GB) 57-27-11-400-002 Installation of the Access Panel (540HB, 540JB, 540KB, 540LB, 540MB, 540NB, 540PB, 540QB, 540RB, 550AB, 550BB, 550CB, 550DB, 560AB, 640HB, 640JB, ....) 57-27-11-400-003 Installation of the Closing Panel 540CZ
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM 时间限制/维护检查 3(81)