(6)
Remove the access platform(s).
R 1EFF : 001-049, 051-099, 101-149, 151-199, 1 05-21-50Page 623 1201-299, 401-499, 1Aug 01/05 1 1 1CES 1 **ON A/C 301-399,
Subtask 05-21-50-410-053-B
B. Close Access
(1) Install the ceiling panels: R 151AY, 151AC, 151BC, 151DC, 151GC, 151HC, 151JC.
(2)
Install the partition panels: 152BW, 151AW, 151BW. (Ref. TASK 25-55-11-400-001)
(3)
Install the sidewall panels:
R 151CW, 151DW, 151EW, 151HW, 151JW, 151RW, 152CW, 152DW, 152FW, 152GW, 152HW, 152JW, 152RW.
(4) Install the floor panels:
151DG, 151EG, 151HF,
151HG, 151JF, 151JG,
151MF, 151NF, 151NG,
151PG, 151QG, 151RF, 151QF,
151RG, 152DG, 152EG,
152HG, 152JG, 152MF,
152NF, 152NG, 152PG,
152QF, 152QG, 152RF, 152RG.
(Ref. TASK 53-42-14-400-001)
R (5) Close the AFT cargo compartment door 826 (Ref. TASK 52-30-00-860-002).
(6) Remove the access platform(s).
R 1EFF : 301-399, 1 05-21-50Page 624 1 1 Aug 01/05 1 1 1CES 1
ZONAL INSPECTION : BULK CARGO COMPARTMENT - INSPECTION/CHECK
____________________________________________________________
TASK 05-21-60-200-001
Zonal Inspection of the Bulk Cargo-Compartment (Zones 161 and 162)
1.
Reason for the Job
__________________
Refer to the MPD TASK: ZL-161-01
2.
Job Set-up Information
______________________
A. Referenced Information
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
52-30-00-860-001 Open the FWD or AFT Cargo-Compartment Door with the Yellow Electric Pump 52-30-00-860-002 Close the FWD or AFT Cargo-Compartment Door with the Yellow Electric Pump
3. Job Set-up
__________ Subtask 05-21-60-010-050
A. Get Access
(1) Open the aft cargo-compartment door 826. (Ref. TASK 52-30-00-860-001)
4. Procedure
_________ Subtask 05-21-60-210-050
A. Inspection
(1)
Do a general visual inspection of the bulk cargo compartment (Zones 161 and 162).
(2)
Make sure that there are no signs of corrosion, cracks or damage.
5. Close-up
________ Subtask 05-21-60-410-050
A. Close Access
(1) Close the aft cargo-compartment door 826. (Ref. TASK 52-30-00-860-002)
TASK 05-21-60-200-002
Zonal Inspection of the Underfloor Bay of the Bulk Cargo-Compartment (Zones 163 and 164)
1.
Reason for the Job
__________________
Refer to the MPD TASK: ZL-163-01
2.
Job Set-up Information
______________________
A. Fixtures, Tools, Test and Support Equipment
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
No specific access platform 2 m (6 ft. 7 in.)
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
52-30-00-860-001 Open the FWD or AFT Cargo-Compartment Door with the Yellow Electric Pump 52-30-00-860-002 Close the FWD or AFT Cargo-Compartment Door with the
Yellow Electric Pump 53-42-17-000-001 Removal of the BULK Cargo-Compartment Floor-Panels 53-42-17-400-001 Installation of the BULK Cargo-Compartment
Floor-Panels
3. Job Set-up
__________ R **ON A/C 001-049, 051-099, 101-149, 221-221, 224-224, 228-228,
Subtask 05-21-60-010-051
A. Get Access
(1) Put an access platform in position at zones 163 and 164. R (2) Open the aft cargo-compartment door 826 (Ref. TASK 52-30-00-860-001).
(3) Remove the floor panels:
161AF, 161DF, 162JF (Ref. TASK 53-42-17-000-001).
R **ON A/C 151-199, 201-220, 222-223, 225-227, 229-299, 301-399, 401-499,
Subtask 05-21-60-010-051-A
A. Get Access
(1)
Put an access platform in position at zones 163 and 164.
(2)
Open the AFT cargo-compartment door 826 (Ref. TASK 52-30-00-860-001).
(3)
Remove the floor panels: 161NF, 161PF and 161DF (Ref. TASK 53-42-17-000-001).
**ON A/C ALL
4. Procedure
_________
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM 时间限制/维护检查 3(33)