R (6) Remove the left and right emergency equipment stowages R (Ref. TASK 25-27-15-000-001).
R (7) Remove the stowage, if installed R (Ref. TASK 25-27-44-000-005).
R (8) Remove the dog house, if installed R (Ref. TASK 25-27-46-000-001).
R (9) Remove the toilets, if installed
R (Ref. TASK 25-43-41-000-001) or (Ref. TASK 25-43-42-000-001)
R (Ref. TASK 25-43-43-000-001) or (Ref. TASK 25-43-44-000-001)
R (10) Remove the galley, if installed
R (Ref. TASK 25-33-41-000-001) or (Ref. TASK 25-33-41-000-002).
R (11) Remove the floor panels
R (Ref. TASK 53-42-12-000-002).
R (12) Remove the access panels
R 261DW, 261EW,
R 261FW, 261GW, 261HW,
R 261JW, 261KW, 261LW,
R 261MW, 261NW, 261PW,
R 261QW, 261RW, 261SW,
R (Ref. TASK 25-23-45-000-003).
R 262AW, 262BW
R 262CW, 262DW, 262EW
R 262FW, 262GW, 262HW,
R 262JW, 262KW, 262LW,
R 262MW, 262NW, 262PW,
R 262QW, 262RW, 262SW,
R (Ref. TASK 25-23-45-000-004).
R 4. Procedure_________
R Subtask 05-22-60-210-053
R A. Inspection
R (1) Do a general visual inspection of the aft-cabin utility areas (Zones
R 261 and 262).
R (2) Make sure that there are no signs of corrosion, cracks or damage.
R (3) Make sure that all the installations (wiring) are attached correctly.
R NOTE : Lift the insulation blankets sufficiently to complete a____
R correct general visual inspection as necessary.
R 5. Close-up
________
R Subtask 05-22-60-410-053
R A. Close Access
R (1) Close the access panels:
R 261DW, 261EW,
R 261FW, 261GW, 261HW,
R 261JW, 261KW, 261LW,
R 261MW, 261NW, 261PW,
R 261QW, 261RW, 261SW.
R (Ref. TASK 25-23-45-400-006)
R 262AW, 262BW, 262CW,
R 262DW, 262EW, 262FW,
R 262GW, 262HW, 262JW,
R 262KW, 262LW, 262MW,
R 262NW, 262PW, 262QW,
R 262RW, 262SW.
R (Ref. TASK 25-23-45-400-005)
R (2) Install the floor panels
R (Ref. TASK 53-42-12-400-002).
R (3) Install the galley, if removed
R (Ref. TASK 25-33-41-400-001) or (Ref. TASK 25-33-41-400-002).
R (4) Install the toilets, if removed
R (Ref. TASK 25-43-41-400-001) or (Ref. TASK 25-43-42-400-001)
R (Ref. TASK 25-43-43-400-001) or (Ref. TASK 25-43-44-400-001)
R (5) Install the dog house, if removed
R (Ref. TASK 25-27-46-400-001).
R (6) Install the stowage, if removed
R (Ref. TASK 25-27-44-400-005).
R (7) Install the left and right emergency equipment stowages
R (Ref. TASK 25-27-15-400-001).
R (8) Install the curtain
R (Ref. TASK 25-26-41-400-003).
R (9) Install the cabin-attendant swivel seat, if removed
R (Ref. TASK 25-22-43-400-001).
R (10) Install the cabin-attendant free-standing seat, if removed
R (Ref. TASK 25-22-42-400-001).
R (11) Install the wall-mounted cabin-attendant seat, if removed
R (Ref. TASK 25-22-41-400-001).
R (12) Close the aft passenger/crew doors 832 and 842
R (Ref. TASK 52-10-00-410-001).
ZONAL INSPECTION : STABILIZERS AND CONE/REAR FUSELAGE - INSPECTION/CHECK
________________________________________________________________________
TASK 05-23-00-200-001
Zonal Inspection as far as visible from the ground of the Stabilizers and the Cone/Rear Fuselage
1. Reason for the Job__________________ Self Explanatory
2. Job Set-up Information______________________ Not Applicable __________
3. Job Set-up
Subtask 05-23-00-869-050
A. Not Applicable
4. Procedure