• 热门标签

当前位置: 主页 > 航空资料 >

时间:2011-02-11 09:56来源:蓝天飞行翻译 作者:admin
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

 TASK 05-24-10-200-002


 Zonal Inspection of Lower Pylon
 1. Reason for the Job__________________
 Refer to the MPD TASK: ZL-415-01
 2. Job Set-up Information______________________
 A. Fixtures, Tools, Test and Support Equipment
 -------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific  access platform 2 m (6 ft. 7 in.)
 B. Referenced Information
 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
R R R 54-51-21-000-001 54-51-21-400-001 05-24-10-991-001 05-24-10-991-002 05-24-10-991-003 05-24-10-991-004  Removal of the Pylon Lateral Access-Doors Installation of the Pylon Lateral Access-Doors Fig. 601Fig. 602Fig. 603Fig. 604
 3. Job Set-up__________
 Subtask 05-24-10-010-051
 A. Get Access
 (1) Put an access platform in position at zone 415 (425).
 (Ref. Fig. 601/TASK 05-24-10-991-001, 602/TASK 05-24-10-991-002) 
R  (2) Remove the pylon lateral access-doors (Ref. TASK 54-51-21-000-001): (Ref. Fig. 603/TASK 05-24-10-991-003, 604/TASK 05-24-10-991-004) 415AL, 415AR, 415BL, 415BR, 425AL, 425AR, 425BL, 425BR.

 

 4. Procedure
_________
 Subtask 05-24-10-210-051

 A. Inspection
 (1)
 Do a general visual inspection of the lower section of the pylon.

 (2)
 Make sure that there are no signs of corrosion, cracks or damage.

 (3)
 Make sure that all the installations (wiring, ducting, piping) are attached correctly.


 5. Close-up
________
 Subtask 05-24-10-410-051

 A. Close Access
R  (1) Install the pylon lateral access-doors (Ref. TASK 54-51-21-400-001): (Ref. Fig. 601/TASK 05-24-10-991-001, 602/TASK 05-24-10-991-002) 415AL, 415AR, 415BL, 415BR, (Ref. Fig. 603/TASK 05-24-10-991-003, 604/TASK 05-24-10-991-004) 425AL, 425AR, 425BL, 425BR.
 (2) Remove the access platform(s).


 ZONAL INSPECTION : ENGINE AIR INTAKE, FAN AND ACCESSORY GEARBOX_______________________________________________________________ INSPECTION/CHECK________________
 TASK 05-24-30-200-001
 Zonal Inspection of the Air Intake Lip and the Inlet Cowl
 1. Reason for the Job__________________
 Refer to the MPD TASK: ZL-433-01
 2. Job Set-up Information______________________
 A. Fixtures, Tools, Test and Support Equipment
 -------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific  access platform 2 m (6 ft. 7 in.)
 B. Referenced Information
 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
R R  05-24-30-991-001-A 05-24-30-991-002-A 05-24-30-991-003 05-24-30-991-004  Fig. 601 Fig. 602Fig. 603Fig. 604
 3. Job Set-up__________ 
R  Subtask 05-24-30-010-050-A 
R  A. Get Access 
R  (1) Put the access platform in position at the zones 433 and 443. 
R R R R R R R  (2) Remove the access panels. (Ref. Fig. 601/TASK 05-24-30-991-001-A, 602/TASK 05-24-30-991-002-A) 433AZ, 433BZ, 434AR 434BZ, 437AL, 438AR (Ref. Fig. 603/TASK 05-24-30-991-003, 604/TASK 05-24-30-991-004) 443AZ, 443BZ, 444AR 444BZ, 447AL, 448AR

 

R R  Access Doors of the Left Nacelle (Left Side) Figure 601/TASK 05-24-30-991-001-A
 1EFF : 1 1 1CES  ALL  1 111 05-24-30 Page 602 Feb 01/02

 

R R  Access Doors of the Left Nacelle (Right Side) Figure 602/TASK 05-24-30-991-002-A
 1EFF : 1 1 1CES  ALL  1 111 05-24-30 Page 603 Feb 01/02

 

 Access Doors of the Right Nacelle (Right Side)
 Figure 603/TASK 05-24-30-991-003
 1EFF :  ALL  1  05-24-30 Page 604 
1  1  Feb 01/98
 1  1
 1CES  1

 

 Access Doors of the Right Nacelle (Left Side)
 Figure 604/TASK 05-24-30-991-004
 1EFF :  ALL  1  05-24-30 Page 605 
1  1  Feb 01/98
 1  1
 1CES  1


 4. Procedure
_________

 Subtask 05-24-30-210-050
 A. Inspection
 (1) Do a general visual inspection of the air intake lip and the inlet cowl.
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM 时间限制/维护检查 3(67)