 54-51-17-000-002  Removal of the Pylon-to-Wing Aft Attach Fitting at
 RIB10
 54-51-17-200-001  Inspection of the Pylon-to-Wing Forward
 Attach-Fitting
 54-51-17-200-002  Inspection of the Pylon-to-Wing Aft Attach-Fitting
 54-51-17-400-001  Installation of Pylon-to-Wing Forward Attach Fitting
 at RIB4
 54-51-17-400-002  Installation of the Pylon-to-Wing Aft Attach Fitting
 at RIB10
 55-10-00-210-001  Detailed Inspection of Horizontal Stabilizer Internal
 Structure of Torque Box Inboard of Fuselage Fairings
 55-16-00-200-001  Detailed Inspection of Horizontal Stabilizer Rear
 Support Fittings, Upper and Lower Attach Fittings and
 Surrounding External Structure, LH/RH
 55-30-00-200-001  Detailed Visual Inspection of Vertical Stabilizer
 Center Box Internal Structure as far as Visible,
 Front Spar FWD Face Upper Closing Rib Upper Surface
 55-36-00-210-001  Detailed Visual Inspection of the Vertical Stabilizer
 Attach Fittings Including the Load Introduction Area
 at the Skin Panels
 57-51-33-000-001  Removal of the No.1 Flap Track Beam
 57-51-33-000-002  Removal of the No.2 Flap Track Beam
 57-51-33-000-003  Removal of the No.3 Flap Track Beam
 57-51-33-000-004  Removal of the No.4 Flap Track Beam
 57-51-33-400-001  Installation of the No.1 Flap Track Beam
 57-51-33-400-002  Installation of the No.2 Flap Track Beam
 57-51-33-400-003  Installation of the No.3 Flap Track Beam
 57-51-33-400-004  Installation of the No.4 Flap Track Beam
 57-55-11-000-001  Removal of the Flap Track Fairings Nos. 2, 3 and 4
 57-55-11-400-001  Installation of the Flap Track Fairings Nos. 2, 3 and
 4
 71-00-00-000-042  Removal of the Power Plant
 71-00-00-400-042  Installation of the Power Plant
 71-00-00-710-008  Power Assurance Check
 71-13-00-010-040  Opening of the Fan Cowl Doors
 71-13-00-410-040  Closing of the Fan Cowl Doors
 72-00-00-200-008  Inspection/Check After the Engine has Exceeded the
 Operational Limits
 78-31-00-710-042  Operational Test of the Thrust Reverser System
 78-36-00-010-040  Opening of the Thrust Reverser Doors
 78-36-00-410-040  Closing of the Thrust Reverser Doors 

R 1EFF : 001-003, 051-054, 1 05-51-11Page 603 1 1 May 01/05 1 1 1CES 1 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------


79-00-00-281-002 Check of the Electrical Master Chip Detector for
 Particles 05-51-11-991-004 Fig. 601 05-51-11-991-005 Fig. 602 05-51-11-991-007 Fig. 603 05-51-11-991-008 Fig. 604 05-51-11-991-009 Fig. 605 05-51-11-991-010 Fig. 606 05-51-11-991-011 Fig. 607 05-51-11-991-012 Fig. 608 05-51-11-991-013 Fig. 609 05-51-11-991-014 Fig. 610
 3. Job Set-up
__________
 Subtask 05-51-11-941-050
 A. Inspection Preparation
 (1)
 We can not give you accurate details of the inspection procedure to be applied after each incident. This is because there can be important variations in the weight, the speed and the direction of the loads. Thus, before you start, we recommend that you get information:

 (a)
 From the crew about the landing conditions. For example, find out:

 -
if the landing was straight, drifting, wing-low, tail or nose heavy.

 -
if the crew heard a noise possibly related to a structural failure.

 

 (b)
 From the flight recorder (DFDR):


 -vertical acceleration, vertical speed (V/S), weight of the aircraft.

 (2)
 With these pieces of information refer to the inspection definition diagram. (Ref. Fig. 601/TASK 05-51-11-991-004)


R 1EFF : 001-003, 051-054, 1 05-51-11Page 604 1 1 May 01/05 1 1 1CES 1


 Inspection - Definition Diagram
 Figure 601/TASK 05-51-11-991-004
 1EFF :  ALL  1  05-51-11 Page 605 
1  1  Feb 01/98
 1  1
 1CES  1

 

 Subtask 05-51-11-481-050

 B. Safety precautions
 (1)
 Make sure that the safety devices are installed on the landing gears (Ref. TASK 32-00-00-481-001).

 (2)
 Put a warning notice in the cockpit to tell persons not to operate the aircraft systems.


 Subtask 05-51-11-866-050
 