3. Job Set-up
__________
Subtask 05-25-30-866-064
A. Aircraft Maintenance Configuration
(1) Fully extend the flaps (Ref. TASK 27-50-00-866-008).
Subtask 05-25-30-010-058
B. Get Access
(1) Put an access platform in position.
R R R (2) Remove the access panels: 536AB, 536BB, 636AB, 636BB. (Ref. Fig. 603/TASK 05-25-30-991-005)
4. Procedure_________
Subtask 05-25-30-210-058
A. Inspection
R R (1) Do a general visual inspection of the flap tab hinge and the fairing No. 1B.
(2) Make sure that there are no signs of corrosion, cracks or damage.
(3) Make sure that all the installations are attached correctly.
5. Close-up________
Subtask 05-25-30-410-058
A. Close Access
R R R (1) Install the access panels: 536AB, 536BB, 636AB, 636BB.
(2) Remove the access platform(s).
Subtask 05-25-30-866-065
B. Aircraft Maintenance Configuration
(1) Fully retract the flaps (Ref. TASK 27-50-00-866-009).
TASK 05-25-30-200-010
R Zonal Inspection of the Flap Tab Hinge and Fairing No. 3A WARNING : DO NOT EXTEND THE SLATS AND FLAPS WHEN THE THRUST REVERSER COWLS ARE
_______
DEPLOYED IN THE 45 DEG. POSITION.
1.
Reason for the Job
__________________
Refer to the MPD TASK: ZL-537-01
2.
Job Set-up Information
______________________
A. Fixtures, Tools, Test and Support Equipment
-------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific access platform 3 m (9 ft. 10 in.)
B. Referenced Information
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
27-50-00-866-008 Extension of the Flaps on the Ground
27-50-00-866-009 Retraction of the Flaps on the Ground
05-25-30-991-006 Fig. 604
3. Job Set-up
__________
Subtask 05-25-30-866-066
A. Aircraft Maintenance Configuration
(1) Fully extend the flaps (Ref. TASK 27-50-00-866-008).
Subtask 05-25-30-010-059
B. Get Access
(1) Put an access platform in position.
R R (2) Remove the access panels: 537AB, 537BB, 537CB, 637AB, 637BB, 637CB. (Ref. Fig. 604/TASK 05-25-30-991-006)
4. Procedure_________
Subtask 05-25-30-210-059
A. Inspection
R R (1) Do a general visual inspection of the flap tab hinge and the fairing No. 3A.
(2) Make sure that there are no signs of corrosion, cracks or damage.
(3) Make sure that all the installations are attached correctly.
5. Close-up________
Subtask 05-25-30-410-059
A. Close Access
R R (1) Install the access panels: 537AB, 537BB, 537CB, 637AB, 637BB, 637CB.
(2) Remove the access platform(s).
Subtask 05-25-30-866-067
B. Aircraft Maintenance Configuration
(1) Fully retract the flaps (Ref. TASK 27-50-00-866-009).
R Access Panels of the Flap Tap Hinge Fairings N. 3 R Figure 604/TASK 05-25-30-991-006
1EFF : 301-399, 1 05-25-30Page 634 1 1 May 01/04 1 1 1CES 1
TASK 05-25-30-200-011
R Zonal Inspection of the Flap Tab Hinge and Fairing No. 3B WARNING : DO NOT EXTEND THE SLATS AND FLAPS WHEN THE THRUST REVERSER COWLS ARE
_______
DEPLOYED IN THE 45 DEG. POSITION.
1.
Reason for the Job
__________________
Refer to the MPD TASK: ZL-538-01
2.
Job Set-up Information
______________________
A. Fixtures, Tools, Test and Support Equipment
-------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific access platform 3 m (9 ft. 10 in.)
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM 时间限制/维护检查 3(79)