**ON A/C ALL
TASK 05-21-30-200-006
Zonal Inspection of the FWD Cargo Compartment
1.
Reason for the Job
__________________
Refer to the MPD TASK: ZL-131-03
2.
Job Set-up Information
______________________
A. Fixtures, Tools, Test and Support Equipment
-------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific access platform 2 m (6 ft. 7 in.)
B. Referenced Information
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
52-30-00-860-001 Open the FWD or AFT Cargo-Compartment Door with the Yellow Electric Pump 52-30-00-860-002 Close the FWD or AFT Cargo-Compartment Door with the
Yellow Electric Pump 53-22-14-000-001 Removal of the FWD Cargo-Compartment Floor-Panels 53-22-14-400-001 Installation of the FWD Cargo-Compartment
Floor-Panels
**ON A/C 001-049, 051-099, 101-149, 201-299,
05-21-30-991-002 Fig. 602 R **ON A/C 151-199, 401-499,
05-21-30-991-002-A Fig. 602A -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
**ON A/C 301-399,
05-21-30-991-002-B Fig. 602B
**ON A/C 001-049, 051-099, 101-149, 201-299,
05-21-30-991-001 Fig. 603 R **ON A/C 151-199, 401-499,
05-21-30-991-001-A Fig. 603A
**ON A/C 301-399,
05-21-30-991-001-B Fig. 603B
**ON A/C ALL
3. Job Set-up
__________
**ON A/C 001-049, 051-099, 101-149, 201-299,
Subtask 05-21-30-010-055
A. Get Access
(1)
Put an access platform in position at the zones 131 and 132.
(2)
Open the FWD cargo compartment door 825. (Ref. TASK 52-30-00-860-001)
(3)
Remove the ceiling panels: 131AC, 131BC, 131CC.
(Ref. Fig. 602/TASK 05-21-30-991-002)
(4)
Remove the sidewall panels: 131GW, 131HW, 131MW, 132KW, 132MW. (Ref. Fig. 603/TASK 05-21-30-991-001)
(5)
Remove the floor panels:
131BF, 131CF, 131FF,
131GF, 131JF, 131KF,
132FF, 132GF, 132JF, 132KF.
(Ref. TASK 53-22-14-000-001)
R **ON A/C 151-199, 401-499,
Subtask 05-21-30-010-055-A
A. Get Access
(1)
Put an access platform in position at the zones 131 and 132.
(2)
Open the forward cargo door 825 (Ref. TASK 52-30-00-860-001).
(3)
Remove the ceiling panels:
131MC, 131NC, 131PC,
(Ref. Fig. 602A/TASK 05-21-30-991-002-A)
(4)
Remove the sidewall panels:
131GW, 131HW,
131SW, 132SW, 132KW.
(Ref. Fig. 603A/TASK 05-21-30-991-001-A)
(5)
Remove the floor panels:
131DG, 131EG,
132DG, 132EG,
(Ref. TASK 53-22-14-000-001)
**ON A/C 301-399,
Subtask 05-21-30-010-055-B
A. Get Access
(1)
Put an access platform in position at the zones 131 and 132.
(2)
Open the forward cargo door 825 (Ref. TASK 52-30-00-860-001).
(3)
Remove the ceiling panels:
131AC, 131BC, 131CC,
131DC, 131EC.
(Ref. Fig. 602B/TASK 05-21-30-991-002-B)
R R R R R R (4) Remove the sidewall panels: 131GW, 131HW, 131MW, 131QW, 131RW, 132MW, 132KW, 132QW, 132RW. (Ref. Fig. 603B/TASK 05-21-30-991-001-B)
R R R R R R R R (5) Remove the floor panels: 131BF, 131CF, 131FF, 131GF, 131JF, 131KF, 131VF, 131YF, 131WF, 131ZF, 132FF, 132GF, 132JF, 132KF, 132VF, 132YF. (Ref. TASK 53-22-14-000-001)
**ON A/C ALL
4. Procedure_________
Subtask 05-21-30-210-055
A. Inspection
(1) Do a general visual inspection of the forward cargo compartment.
(2) Make sure that there are no signs of corrosion, cracks or damage.
(3) Make sure that all the installations (wiring, ducting, piping) are attached correctly.
NOTE : Lift the insulation blankets sufficiently to complete a____ correct general visual inspection as necessary.
5. Close-up
________
**ON A/C 001-049, 051-099, 101-149, 201-299,