A. Inspection
(1)
Do a general visual inspection of the underfloor bay of the bulk cargo compartment (Zones 163 and 164).
(2)
Make sure that there are no signs of corrosion, cracks or damage.
(3)
Make sure that all the installations (wiring, ducting, piping) are attached correctly.
5. Close-up
________
**ON A/C 001-049, 051-099, 101-149, 221-221, 224-224, 228-228,
Subtask 05-21-60-410-051
A. Close Access
(1)
Install the floor panels: 161AF, 161DF, 162JF (Ref. TASK 53-42-17-400-001).
(2)
Close the AFT cargo-compartment door 826 (Ref. TASK 52-30-00-860-002).
(3) Remove the access platform(s). R **ON A/C 151-199, 201-220, 222-223, 225-227, 229-299, 301-399, 401-499,
Subtask 05-21-60-410-051-A
A. Close Access
(1)
Install the floor panels: 161NF, 161PF and 161DF (Ref. TASK 53-42-17-400-001).
(2)
Close the aft cargo-compartment door
826 (Ref. TASK 52-30-00-860-002).
(3)
Remove the access platform(s).
**ON A/C ALL
TASK 05-21-60-200-003
Zonal Inspection of Bulk Cargo-Compartment
1. Reason for the Job__________________
Refer to the MPD TASK: ZL-161-02
2. Job Set-up Information______________________
A. Fixtures, Tools, Test and Support Equipment
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
No specific access platform 2 m (6 ft. 7 in.)
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
25-55-12-000-002 Removal of the Ceiling Panels in the AFT Cargo Compartment - FR59/FR65
25-55-12-000-003 Removal of the Sidewall Panels in the AFT Cargo Compartment - FR59/FR65
25-55-12-400-002 Installation of the Ceiling Panels in the AFT Cargo Compartment - FR59/FR65
25-55-12-400-003 Installation of the Sidewall Panels in the AFT Cargo Compartment - FR59/FR65
52-30-00-860-001 Open the FWD or AFT Cargo-Compartment Door with the Yellow Electric Pump
52-30-00-860-002 Close the FWD or AFT Cargo-Compartment Door with the Yellow Electric Pump
1EFF : ALL 1 05-21-60Page 606 1 1 Feb 01/04R 1 1 1CES 1
3. Job Set-up
__________
Subtask 05-21-60-010-052
A. Get Access
(1) Put an access platform in position at the zones 161 and 162.
(2) Open the AFT cargo compartment door 826. (Ref. TASK 52-30-00-860-001)
R R (3) Remove the sidewall panels: 161AW, 161BW, 161CW. (Ref. TASK 25-55-12-000-003)
R R R (4) Remove the ceiling panel 161AC: (Ref. TASK 25-55-12-000-002)
4. Procedure_________
Subtask 05-21-60-210-052
A. Inspection
(1) Do a general visual inspection of the bulk cargo compartment (Zones 161 and 162).
R (2) Make sure that there are no signs of corrosion, cracks or damage.
(3) Make sure that all the installations (wiring, ducting, piping) are attached correctly.
5. Close-up________
Subtask 05-21-60-410-052
A. Close Access
R (1) Install the ceiling panel 161AC. (Ref. TASK 25-55-12-400-002)
R (2) Install the sidewall panels: 161AW, 161BW, 161CW. (Ref. TASK 25-55-12-400-003)
(3)
Close the AFT cargo-compartment door 826. (Ref. TASK 52-30-00-860-002)
(4)
Remove the access platform(s).
R 1EFF : ALL 1 05-21-60Page 608 1 1 Nov 01/03 1 1 1CES 1 TASK 05-21-60-200-004
Zonal Inspection of the Bulk Cargo-Compartment (Zones 161 and 162)
1. Reason for the Job
__________________
Refer to the MPD TASK: ZL-161-03
2. Job Set-up Information
______________________
A. Fixtures, Tools, Test and Support Equipment
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
No specific access platform 2 m (6 ft. 7 in.)
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION