Subtask 05-21-90-010-058
A. Get Access
(1)
Put an access platform in position at the zones 191 and 192.
(2)
Remove the wing-to-fuselage fairings: 191BT, 191CT, 191DT, 191ET, 191LB, 192BT, 192CT, 192DT, 192ET, 192LB, 192MB . (Ref. TASK 53-35-11-000-001)
(3)
Remove the access panels:
-191AB, 191AT, 191GB, 191JB, 192AB, 192AT.
(Ref. TASK 53-35-13-000-001)
-191EB, 191HB, 191KB, 192EB, 192FB, 192KB.
(Ref. TASK 53-35-13-000-002)
4. Procedure
_________ Subtask 05-21-90-210-058
A. Inspection
(1)
Do a general visual inspection of the air conditioning compartment and fairings.
(2)
Make sure that there are no signs of corrosion, cracks or damage.
(3)
Make sure that all the installations (wiring, ducting, piping) are attached correctly.
5. Close-up
________ Subtask 05-21-90-410-058
A. Close Access
(1) Install the access panels:
-191EB, 191HB, 191KB, 192EB, 192FB, 192KB.
(Ref. TASK 53-35-13-400-002)
-191AB, 191AT, 191GB, 191JB, 192AB, 192AT.
(Ref. TASK 53-35-13-400-001)
1EFF : ALL 1 05-21-90Page 613 1 1 May 01/04R 1 1 1CES 1
(2)
Install the wing-to-fuselage fairings:
191BT, 191CT, 191DT, 191ET, 191LB, 192BT, 192CT, 192DT, 192ET, 192LB,
192MB .
(Ref. TASK 53-35-11-400-001)
(3)
Remove the access platform(s).
ZONAL INSPECTION : UPPER HALF OF FUSELAGE - INSPECTION/CHECK
____________________________________________________________ TASK 05-22-00-200-001 Zonal Inspection as far as Visible from the Ground of the Upper Half of the
Fuselage
1. Reason for the Job
__________________
R R Self Explanatory
2.
Job Set-up Information
______________________
Not Applicable
3.
Job Set-up
__________
Subtask 05-22-00-869-050
A. Not Applicable
4. Procedure
_________
Subtask 05-22-00-210-050
A. Inspection
(1)
Do a general visual inspection of the upper half of the fuselage from the ground.
(2)
Make sure that there are no signs of corrosion, cracks or damage.
TASK 05-22-00-200-002
Zonal Inspection of the Upper Half of the Fuselage up to the Stringer 8LH and the Stringer 8RH including the Doors Surrounds
1.
Reason for the Job
__________________
Refer to the MPD TASK: ZL-200-02
2.
Job Set-up Information
______________________
A. Fixtures, Tools, Test and Support Equipment
-------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific access platform 2 m (6 ft. 7 in.)
3. Job Set-up
__________ Subtask 05-22-00-010-053
A. Get Access
(1) Put an access platform in position at the zone 200.
4. Procedure
_________ Subtask 05-22-00-210-051
A. Inspection
(1)
Do a general visual inspection of the upper half of the fuselage up to the stringers 8 LH and 8 RH and the door surrounds.
(2)
Make sure that there are no signs of corrosion, cracks or damage.
5. Close-up
________ Subtask 05-22-00-410-053
A. Close Access
(1) Remove the access platform(s).
TASK 05-22-00-200-003
Zonal Inspection of the Upper Half of the Fuselage from the Stringer 8LH to the Stringer 8RH (Fuselage Crown Area)