• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-04-25 08:35来源:蓝天飞行翻译 作者:航空
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

29-EFFECTIVITY  1  Jan 10/90 
29-CONTENTS  1  Jan 10/90 
29-00-00  1  Jan 10/90 
29-00-00  2  Jan 10/90 
29-00-00  3  Jan 10/90 
29-00-00  4  Jan 10/90 
29-00-00  5  Jan 10/90 
29-10-00  1  Jan 10/90 
29-10-00  2  Jan 10/90 
29-10-00  3  Jan 10/90 
29-10-00  4  Jan 10/90 
29-10-00  5  Jan 10/90 
29-10-00  6  Jan 10/90 
29-10-00  7  Jan 10/90 
29-10-00  8  Jan 10/90 
29-10-00  9  Jan 10/90 
29-10-00  10  Jan 10/90 
29-10-00  11  Jan 10/90 
29-10-00  12  Jan 10/90 
29-10-00  13  Jan 10/90 
29-10-00  14  Jan 10/90 
29-10-00  15  Jan 10/90 
29-10-00  16  Jan 10/90 
29-10-00  17  Jan10/90 
29-10-00  18  Jan 10/90 
29-10-00  19  Jan 10/90 
29-10-00  20  Jan 10/90 
29-10-00  21  Jan 10/90 
29-10-00  22  Jan 10/90 
29-10-00  23  Jan 10/90 
29-10-00  24  Jan 10/90 
29-10-00  25  Jan 10/90 
29-10-00  26  Jan 10/90 
29-10-00  27  Jan 10/90 
29-10-00  28  Jan 10/90 
29-10-00  29  Jan 10/90 
29-10-00  30  Jan 10/90 
29-10-00  31  Jan 10/90 
29-10-00  32  Jan 10/90 
29-10-00  33  Jan 10/90 
29-10-00  34  Jan 10/90 
29-10-00  35  Jan 10/90 
29-10-00  36  Jan 10/90 
29-10-00  37  Jan 10/90 

LIST OF EFFECTIVE PAGES
Jan 10/90

PIPER AIRCRAFT
PA-42-720 (Advanced Trainer)
MAINTENANCEMANUAL


CHAPTER 29 -HYDRAULIC POWER

TABLEOF CONTENTS

SUBJECT
General
Hydraulic System Failure Fault Isolation
Main Flushing Hydraulic System
CHAPTER PAGE
29-00-00
1 1 2
29-10-00
1 1

Hydraulic System Operational Checks Using Piper Test Unit 1
Hydraulic Test Unit (Optional) 1
Connecting Test Unit 1
CyclingLanding Gear 4
CheckingLanding Gear Cycle Time 5
CheckingTime Delay Valve 5
Checking Handle Release to Neutral 6
Checking Priority Valve 6
Checking Main Relief Valve 7
Checking Hand Pump Relief Valve 7
Checking For Suction Air Leakage 7
DisconnectingTest Unit 8
Removal of Hydraulic Power Pack 8
Installation of Hydraulic Power Pack 8
Disassembly of Power Pack 11
Assemblyof Power Pack 11
Cleaning, Inspection and Repair of Power Pack 14
Assembly of Reservoir 14
Testing Reservoir for Leakage 14
Disassembly of Manifold 14
Assembly of Manifold 16
Installation of Manifold 17
Disassemblyof Power Pack Handle Release Mechanism 17
Assembly of Power Pack Handle Release Mechanism 17
Adjustmentof Power Pack Handle-Release Mechanism 19
Operation of Gear Selector Handle Mechanism 20
Inspectionof Gear Selector Handle 21
Adjustment of Gear Selector Handle Mechanism 21
Disassembly of Spring Cartridge Assembly 22
Disassembly of Main Relief Valve 22
Assembly of Main Relief Valve 22
Adjustment of Main Relief Valve 22
Disassembly of Priority Valve 22
Assembly of Priority Valve 22
Adjustmentof Priority Valve 23
Disassembly of Time Delay Check Valve 23
Assemblyof Time Delay Check Valve 23

EFFECTIVITY:
040-999
CONTENTSJan

10/90

PIPER AIRCRAFT
PA-42-720(AdvancedTrainer)
MAINTENANCEMANUAL

CHAPTER29 -HYDRAULICPOWER

TABLEOF CONTENTS(continued)

SUBJECT CHAPTER
PAGE

29-10-00 (continued)Main (continued) Disassemblyof DoorVentValve
23

Assemblyof DoorVent Valve
23

Adjustmentof DoorVentValve
23

Disassemblyof VentFilter 24
Assemblyof VentFilter
24

DisassemblyofStandpipe-Filter 24
Assemblyof Standpipe-Filter 24
Disassemblyof Hand PumpCheckValve
24

Assemblyof HandPumpCheckValve
24

Disassembly 24
of Hand PumpReliefValve

Assemblyof HandPumpReliefValve


24

Adjustmentof HandPumpReliefValve
25

Disassemblyof Hand PumpSuctionScreen 25
Assemblyof Hand PumpSuctionScreen 25
Adjustmentof Door Solenoid Valve 25
Disassemblyof TimeDelayCheckValve
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:夏延飞机维护手册 Cheyenne IIIA PA-42-720 AMM 1(144)