• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-04-25 08:35来源:蓝天飞行翻译 作者:航空
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

PIPERAIRCRAFT
PA-42-720(AdvancedTrainer)
MAINTENANCEMANUAL


A. Storage (continued)
Fuel Valve-DrainPlate Installation Figure 405
(m)Wipeinsideof cell clean with clean,soft,lint-freetackcloth; inspect cleanliness.
(n) To attach fittings in nacelle wing skins, proceedasfollows:
(1.) If fitting canbe reached throughnearbyaccesshole,hold cell andgasketup against attachmentbracketandinsert several bolts.
(2.) If fitting cannotbeinstalledas above, reach downthroughremovedaccessplateon nacelle,insertthreadedrod or bolt through holein wing bracket,downintocorresponding holein cell nutflangefitting,andpullcellupagainst bracket. Installseveralcap bolts to hold fuel celluntilrod is removed,installremainingbolts,and torque to 35 ± 5 inch-pounds.
(o)Connectfuellinesattachedto outboardendsof fuel cells anddrainlinerunningfrominboard endof main outboardfuelcellto inboard end of main inboardcell.
(p)
Connecttwocrossovertubesbetweenmaininboardandoutboardfuel cells byinsertingtubes intonipplesin each celland installing clampsfrom inside cell. Torqueclampsto 60 -65 inch-pounds.Ensuregroundstraponcrossovertubesis attached to spar.

(q)
Installsenders,gaskets(oneoneachsideof bracket), andscrews.Tightennylonscrewsto 5 +2/-0inch-pounds.

(r)
Connectsenderwires. Ensureinsulatorsleeveinsulatessowires attach to sender. Install senderaccessplates.

(s)
Drawnylontie cords tightandhold.(Referto 28-10-00Figure403 for positioningoftie cords onoutboardfuel sender on main fuelcell.) Ensure cellis positioned correctlyin cell compartment,


drawcord tight, holdwithclamp or pliers, andtie. (referto 28-10-00 Figure 406)
(t) Install remaining cellcoveraccessplatesontopof wing. Torquecellcovercapboltsto 25 ± 5 inch-pounds.
(u)Checkforfittingleaks in cellby inserting fuel.
(v) Installremainingaccessplates,lowerwingrootfairing,and nacelle top panel.
EFFECTIVITY:
11

040999 28-10-00PAGE

Jan 10/90

PIPER AIRCRAFT
PA-42-720(AdvancedTrainer)
MAINTENANCEMANUAL

A. Storage(continued)
Step 1 Step 2 Step 3 Step 4
Step 5  Step 6  Step 7 
FuelCell Threading Detail 
Figure406 
EFFECTIVITY: 
PAGE 12 
Jan 10/90 28-10-00 

PIPERAIRCRAFT
PA-42-720(AdvancedTrainer)
MAINTENANCEMANUAL


A. Storage(continued)
10. Testingof FuelCells
NOTE: Eitherof thefollowingleaktests maybe usedto detectleaksin the bladdercells. The chemicalleaktest isthe moresensitiveandpreferredtest.
(a) Performthe soapsuds leaktestasfollows:
(1.) Attachtestplatesto allfittings.
WARNING: DO NOTEXCEED0.25PSIWHENINFLATINGFUELCELLS.
(2.) Inflatethe cellwith air to a pressureof 0.25psi maximum. (3.) Applya soapandwatersolutionto all repairedareassuspectedof leakage. Checkfor bubblesto appearat anypointwhereleakageoccurs. (4.) Aftertesting,removeall platesandwipesoapresiduefromthe exteriorof thecell.
(b) Performchemicaltest as follows: (1.) Attachtestplatesto all butonefittingopening. (2.) Mix 40gramsof Phenolphthaleincrystalsin 1/2gallonof ethylalcohol. Add 1/2gallonof
waterafterthe crystalshavedissolved.
WARNING: AMMONIAGASIS GIVENOFFBYAMMONIUMHYDROXIDE.USE CAUTIONWHENOPENINGTHECONTAINERANDWHENUSING AMMONIUMHYDROXIDE.PROVIDEADEQUATEVENTILATIONTO MAINTAINTHECONCENTRATIONOF AMMONIABELOWACCEPTABLE LEVELS.(REFERTO28-10-00,CHART801.)
(3.) Pourammoniaas suppliedon an absorbentcloth inthe ratioof 3cc (1teaspoon)percubic foot of cell capacity.Placea saturatedclothinsidethe cell and installthe remainingtest plate.
WARNING: DO NOTEXCEED0.25 PSIWHENINFLATINGCELL.
(4.) Inflatethe cell withair to a pressureof 0.25psi maximum.Maintainpressurefor a minimumof 15 minutes.
(5.) Soaka largecleanwhiteclothin the phenolphthaleinsolution,wringit out thoroughly,and spreadit smoothlyonthe outersurfaceof the cell. Pressthe clothdownto ensure detectionof minuteleaks.
NOTE: Redspotson the clothwill indicateleakage.
(6.) Checkthe clothfor redspotswhichwill indicateleak. Markanyleaksfound.
(7.) Repeatstepse. and f. for remainingoutersurfaceof fuelcell.
NOTE: Phenolphthaleinsolutionandtestcloth canbe reusedonlyif they remainclean. Storesolutionnotin immediateusein a closedrustproofcontainerto prevent evaporationanddeterioration.
(8.) Repairfuelcellasnecessary.
(9.) Removeallplatesandtestequipment.Purgecellwithfreshair.

EFFECTIVITY:
Jan 10/9010/90
28-10-00
Jan

PIPERAIRCRAFT
PA-42-720(Advanced Trainer)
MAINTENANCEMANUAL

A. Storage(continued)
11. Inspectionof Fuel Cells
WARNING: A VAPOR-PROOFLIGHTMUSTBEUSEDDURINGINSPECTION.
(a)
NewCells:Inspect cell surfaceinsideandout for cuts, abraded (scuffed)areas,andaccessorydamage.Alsoinspectfittingseals for nicks,scratches,andforeign material.
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:夏延飞机维护手册 Cheyenne IIIA PA-42-720 AMM 1(129)