• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-04-16 09:58来源:蓝天飞行翻译 作者:航空
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
////////////////////////A / PW4000 SERIES /747-400 / ENGINES/MAINTENANCE MANUAL ////////////////////////
TEST NO. 11 - REPLACEMENT ENGINE TEST (UNTESTED)
________________________________________________
 S 015-176-N00
 (5)  Open the core cowl panels (AMM 71-11-06/201).
 S 015-178-N00 WARNING: OBEY THE INSTRUCTIONS IN AMM 78-31-00/201 WHEN YOU OPEN THE
_______ THRUST REVERSERS. IF YOU DO NOT OBEY THE INSTRUCTIONS, INJURIES TO PERSONS OR DAMAGE TO EQUIPMENT CAN OCCUR.
 (6)  
Open the thrust reversers (AMM 78-31-00/201). S 715-181-N00

 (7)  
Do the operational test for the engine fire and overheat detection system (AMM 26-11-00/501).

 S 795-182-N00

 (8)  
Do this task: Test No. 1 - Pneumatic Leak Test. S 715-183-N00

 (9)  
Do the operational test for the engine inlet anti-ice system (AMM 30-21-00/501).


 S 415-179-N00 WARNING: OBEY THE INSTRUCTIONS IN AMM 78-31-00/201 WHEN YOU CLOSE THE
_______ THRUST REVERSERS. IF YOU DO NOT OBEY THE INSTRUCTIONS, INJURIES TO PERSONS OR DAMAGE TO EQUIPMENT CAN OCCUR.
 (10)
 Close the thrust reversers (AMM 78-31-00/201). S 415-180-N00

 (11)
 Close the core cowl panels (AMM 71-11-06/201). S 415-181-N00

 (12)
 Close the fan cowl panels (AMM 71-11-04/201). S 445-182-N00

 (13)
 Do the activation procedure for the thrust reversers (AMM 78-31-00/201).


 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
 71-00-00
 ALL  ú ú N03 Page 580B ú Jun 18/01
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
TEST NO. 11 - REPLACEMENT ENGINE TEST (UNTESTED)
________________________________________________
 S 865-122-N00
 (14)
 Use the Power Plant Operation (Normal) procedure to prepare to start the engine (AMM 71-00-00/201).

 S 735-124-N00

 (15)
 Do the necessary test in Power Plant Test Reference Table as a result of the maintenance which was done.

 S 715-109-N00

 (16)
 If Test No. 9 - Performance Test is not done, do this task:  Test No. 4 - Power Acceleration/Deceleration Test.

 S 725-110-N00

 (17)
 Make sure the thrust reversers deploy and the interlock of the reverse thrust lever releases:

 (a)  
Make sure the applicable NACELLE ANTI-ICE and ENGINE BLEED
 switches are in the OFF position.


 (b)  
Make sure the EEC MAINT ENG (1,2,3, or 4) POWER switch on the P461 panel is in the NORM position.

 WARNING:_______USE AMM 71-00-00/201 TO OPERATE THE POWER PLANT. IF YOU DO NOT USE THIS PROCEDURE, YOU CAN CAUSE DAMAGE TO EQUIPMENT OR INJURY TO PERSONS.

 (c)  
Use the Power Plant Operation (Normal) procedure to start the engine (AMM 71-00-00/201).

 (d)  
Operate the engine at minimum idle for 5 minutes.

 


 NOTE: Do not do this step if the engine has operated at the
____ minimum idle condition for 5 minutes during the engine start procedure.
 WARNING: MAKE SURE THAT PERSONS AND EQUIPMENT ARE CLEAR OF THE LE
_______ AND TE FLAPS AND THE FLAP DRIVE MECHANISMS BEFORE YOU MOVE THE FLAP CONTROL LEVER. WITH HYDRAULIC POWER REMOVED, THE FLAPS WILL MOVE AUTOMATICALLY BY ELECTRICAL POWER WHEN YOU MOVE THE FLAP CONTROL LEVER. IF PERSONS ARE NOT CLEAR OF THE FLAPS, INJURY TO PERSONS CAN OCCUR.
 WARNING:_______MAKE SURE THE LE FLAPS ARE RETRACTED. THEY WILL AUTOMATICALLY RETRACT WHEN THE REVERSE THRUST LEVERS ARE MOVED DURING THE REVERSE THRUST. IF YOU DO NOT FOLLOW THESE INSTRUCTIONS, INJURY TO PERSONS OR DAMAGE TO EQUIPMENT CAN OCCUR.
 (e)  Make sure the leading edge flaps are fully retracted
 (AMM 27-81-00/201).

 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
 71-00-00
 ALL  ú ú N03 Page 580C ú Jun 18/01
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
////////////////////////A / PW4000 SERIES /747-400 / ENGINES/MAINTENANCE MANUAL ////////////////////////
TEST NO. 11 - REPLACEMENT ENGINE TEST (UNTESTED)
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:747-400 AMM 飞机维护手册 动力装置 POWER PLANT 1(80)