• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-04-16 09:58来源:蓝天飞行翻译 作者:航空
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

 ALL  ú ú N01 Page 111 ú Jun 10/95
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
////////////////////////
A / PW4000 SERIES /
747-400 / ENGINES /FAULT ISOLATION/MAINT MANUAL ////////////////////////
FLUID TRAP FOR THE DRAIN LINE OF THE SHUTOFF VALVE FOR THE TURBINE CASE COOLING AIR
SEE L
STATOR VANE 
ACTUATOR 
(REF) 
FLUID TRAP FOR THE 
DRAIN LINE OF THE  FLUID TRAP FOR THE 
TURBINE CASE COOLING  DRAIN LINE FOR THE 
AIR VALVE ACTUATOR,  IDG AIR/OIL HEAT 
VARIABLE STATOR VANE  EXCHANGER 
ACTUATOR, AND THE IDG 
AIR/OIL HEAT EXCHANGER 
VALVE  STATOR VANE ACTUATOR 

ENGINE VENTS AND DRAINS
Power Plant - Component Location 
Figure 102 (Sheet 7) 

EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
 71-00-00
 ALL  ú ú N01 Page 112 ú Jun 10/95
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
////////////////////////
A / PW4000 SERIES /
747-400 / ENGINES /FAULT ISOLATION/MAINT MANUAL ////////////////////////
ENGINE OIL TANK (REF)
SCUPPER DRAIN FOR THE ENGINE OIL TANK AFT DRAIN
M
ENGINE VENTS AND DRAINS
Power Plant - Component Location (Detail from Sht 4)Figure 102 (Sheet 8)
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
 71-00-00
 ALL  ú ú N01 Page 113 ú Feb 10/92
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
POWER PLANT (OPERATING PROCEDURE) - MAINTENANCE PRACTICES
_________________________________________________________
 1.  General
_______
 A.  This procedures includes the tasks that follow:
 (1)  
Engine Ground Safety Precautions

 (2)  
Power Plant Operation Limits

 (3)  
Prepare for the Power Plant Operation

 (4)  
Start the Engine (Normal Operation - Air from the APU or Ground Cart)

 (5)  
Start the Engine (Normal Operation - Engine Bleed Air)

 (6)  
Manually Start the Engine

 (7)  
Start Procedure After An Emergency Engine Shutdown

 (8)  
Engine Shutdown (Normal) Procedure

 (9)  
Put the Engine Back to Its Usual Condition

 (10)
 Power Plant Operation (Dry-Motor)

 (11)
 Power Plant Operation (Wet-Motor)

 (12)
 Start the Engine (Cold Weather)

 (13)
 Prime the Engine Oil System and Fuel System

 B.  
The Start the Engine (Normal Operation) and Engine Shutdown (Normal) procedures are the usual procedures to operate the engine.

 C.  
The procedure to motor the engine is when you turn the engine with the starter but you do not supply the ignition. The Dry-Motor procedure supplies fuel to the fuel pump as a lubricant, but not to the combustion chamber. The Wet-Motor procedure supplies fuel to the fuel pump and lets the fuel go into the combustion chamber. Thus, you must only use the Wet-Motor procedure when it is necessary.

 D.  
The Power Plant Operation (Cold Weather) is the engine operation procedure for the engines in the conditions of snow, ice and temperatures less than 32°F (0°C).

 E.  
The Prime the Engine Oil and Fuel System procedure adds engine oil to the engine oil system or fuel to the fuel system when the oil compartments and fuel system components are drained.


 TASK 71-00-00-802-001-N00
 2.  Engine Ground Safety Precautions
________________________________
 A.  General
 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
 71-00-00
 ALL  ú ú N01A Page 201 ú Feb 18/01
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
////////////////////////A / PW4000 SERIES /747-400 / ENGINES/MAINTENANCE MANUAL ////////////////////////
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:747-400 AMM 飞机维护手册 动力装置 POWER PLANT 1(10)