• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-04-16 09:58来源:蓝天飞行翻译 作者:航空
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
 71-00-00
 ALL  ú ú N01 Page 504 ú Oct 18/01
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
~.............................................................................. | Power Plant Test Reference Table | ................................................................................ | Component Repaired or Replaced | Necessary Test | ................................................................................
 |AIR SYSTEM (75-00-00)  |  |
 |  |  |
 |  No. 3 Bearing Buffer Air Cooler  |  2 or 3  |
 |  High Pressure Turbine Case Cooling Air  |  |
 |  Shutoff Valve  |  3 and 6  |
 |  Low Pressure Turbine Case Cooling Air  |  |
 |  Shutoff Valve  |  3 and 6  |
 |  Turbine Case Cooling Air Valve Actuator  |  6  |
 |  Turbine Case Cooling Air Valve Control  |  |
 |  Cable  |  6  |
 |  Turbine Vane and Blade Cooling  |  |
 |  Air Valve Position Switch  |  6  |
 |  Variable Stator Vane Actuator (SVA)  |  3 and 6, or 15  |
 |  2.5 Bleed Valve Actuator  |  3 and 6, or 15  |
 |  2.9 Bleed Valve  |  6  |
 |  2.9 Bleed Valve Solenoid  |  6  |
 |  HPC Secondary Flow Control Valve  |  6  |
 |  PS3 Air Filter  |  6  |
 |  HPC Secondary Flow Control Valve and  |  |
 |  Turbine Vane and Blade Cooling  |  |
 |  Air Valve Solenoid  |  6  |
 |  HPC Secondary Flow Control Valve and  |  |
 |  IDGS Air/Oil Heat Exchanger Valve  |  |
 |  Override Solenoid  |  6  |
 |  External Air Tubes  |  2 or 3  |
 |  Turbine Vane and Blade Cooling Air Valve  |  3 and 6  |
 |  Turbine Vane and Blade Cooling Air Valve,  |  |
 |  IDG Air/Oil Heat-Exchanger Valve  |  |
 |  Override Solenoid  |  6  |
 |  Turbine Vane Cooling Air Valve,  |  |
 |  Turbine Vane and Blade Cooing Air  |  |
 |  Valve Solenoid  |  6  |

 ................................................................................ |INDICATING SYSTEM (77-00-00) | | | | | | EGT (TT4.95) T/C Box and Cable | 3 | | EGT (TT4.95) T/C Probes | 3 |
 EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
 71-00-00
 ALL  ú ú N02 Page 505 ú Oct 18/01
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
////////////////////////A / PW4000 SERIES /747-400 / ENGINES/MAINTENANCE MANUAL ////////////////////////
~.............................................................................. | Power Plant Test Reference Table | ................................................................................ | Component Repaired or Replaced | Necessary Test | ................................................................................
 |OIL SYSTEM (79-00-00)  |  |
 |  |  |
 |  Engine Oil Tank  |  3  |
 |  Fuel/Oil Cooler and Bypass Valve  |  3  |
 |  Engine Fuel/Oil Cooler Bypass Valve  |  |
 |  Solenoid  |  3  |
 |  Lubrication And Scavenge Oil Pumps  |  3, 13  |
 |  Main Oil Filter  |  3  |
 |  Main Oil Filter Pressure Relief  |  |
 |  Valve  |  3  |
 |  Oil System Pressure (Regulator)  |  |
 |  Relief Valve  |  3  |
 |  Fuel/Oil Cooler (Engine and IDGS)  |  3  |
 |  Air/Oil Heat Exchanger And Valve (Engine)  |  3  |
 |  Air/Oil Heat Exchanger and Valve (IDGS)  |  3  |
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:747-400 AMM 飞机维护手册 动力装置 POWER PLANT 1(49)