S 842-118-N00
(2)
Install the inlet cover.
S 842-119-N00
(3)
Install the thrust reverser plugs.
S 842-120-N00
(4)
Install the turbine exhaust cover when engine is sufficiently cool to prevent damage to the cover.
TASK 71-00-00-612-133-N00
14. Prime the Engine Oil System and Fuel System
___________________________________________
A. References
(1)
AMM 12-13-03/301, Engine
B.
Access
(1)
Location Zone
221 and 222 Control Cabin
412 Engine 1
422 Engine 2
432 Engine 3
442 Engine 4
C.
Procedure
S 612-067-N00
(1)
Do the servicing procedure for the engine oil system (AMM 12-13-03/301).
S 862-150-N00
(2)
Do the procedure to wet motor the engine.
S 612-069-N00
CAUTION: DO NOT OPEN THE FILLER CAP ON THE OIL TANK IN LESS THAN FIVE
_______ MINUTES AFTER THE ENGINE SHUTDOWN. IF YOU OPEN THE FILLER CAP TOO FAST, A FAST FLOW OF HOT OIL CAN CAUSE INJURY TO YOU.
(3) Examine the engine oil tank for sufficient servicing (AMM 12-13-03/301).
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
71-00-00
ALL ú ú N01A Page 280C ú Oct 15/98
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
POWER PLANT - ADJUSTMENT/TEST
_____________________________
1. General_______
A. These tests apply to the PW4000 series engines. The tests give the necessary steps to make sure the engine operates correctly after a component is replaced or repaired.
B. The tests are given a number for positive identification. The table that follows shows the test numbers and titles.
~............................................................ | Power Plant Tests List | .............................................................. | Test | | | Number | Title of Test | .............................................................. | 1. |Pneumatic Leak Test | .............................................................. | 2. |Engine Motoring - Using Starter | .............................................................. | 3. |Ground Test - Idle Power | .............................................................. | 4. |Power and Acceleration/Deceleration Test | .............................................................. | 5. |Oil System Static Leak Test | .............................................................. | 6. |Electronic Engine Control (EEC) Idle Test | .............................................................. | 7. |EEC Static Test | .............................................................. | 8. |Vibration Survey | .............................................................. | 9. |Performance Test | .............................................................. | 10. |Replacement Engine Test (Pretested) | .............................................................. | 11. |Replacement Engine Test (Untested) |
EFFECTIVITYùùùùùùùùùùùùùùùùùùùùùùùùùùùùùù. ú
71-00-00
ALL ú ú N01 Page 501 ú Jun 18/00
BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details.
////////////////////////A / PW4000 SERIES /747-400 / ENGINES/MAINTENANCE MANUAL ////////////////////////
~............................................................ | Power Plant Tests List | .............................................................. | Test | | | Number | Title of Test | .............................................................. | 12. |Engine Vacuum Test | .............................................................. | 13. |Main Oil Pressure Test | .............................................................. | 14. |Pt2 System Leak Check | .............................................................. | 15. |EEC Ground Test of Engine Control System | | |Actuators {For ALL EECS WITHOUT THE EECS P/N | | |791100-4-035 (50D437), 791100-4-038 (50D821), | | |791100-4-044 (50D823), 791100-4-048 (51D011), | | |or 791100-4-049 (51D012)} | .............................................................. | 20. |High Power Engine Surge Test | 2............…...............................................1
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:747-400 AMM 飞机维护手册 动力装置 POWER PLANT 1(47)