R  4. Procedure_________  
R  (Ref. Fig. 409/TASK 57-55-11-991-010, 410/TASK 57-55-11-991-011, 411/TASK  
R  57-55-11-991-013, 412/TASK 57-55-11-991-012)  
R  Subtask 57-55-11-420-077  
R  A. Preparation for Installation  
R  WARNING : USE SOLVENTS/CLEANING AGENTS, SEALANTS AND OTHER SPECIAL_______  
R  MATERIALS ONLY WITH A GOOD SUPPLY OF AIR.  
R  OBEY THE MANUFACTURERS INSTRUCTIONS.  
R  PUT ON PROTECTIVE CLOTHING.  
R  DO NOT GET THEM IN YOUR MOUTH.  
R  DO NOT SMOKE.  
R  DO NOT BREATHE THE GAS.  
R  THESE MATERIALS ARE POISONOUS, FLAMMABLE AND SKIN IRRITANT.  
R  GET MEDICAL HELP IF YOUR SKIN OR EYES BECOME IRRITATED.  
R  (1) Use a MISCELLANEOUS (Material No. 19-003), made moist with CLEANING  
R  AGENTS (Material No. 11-004) to clean the component interface and/or  
R  the adjacent area.  
R  (2) Do an inspection of the component interface and/or the adjacent area.  
R  (3) Make sure that the parts retained from the removed component are  
R  clean and in the correct condition.  
R  Subtask 57-55-11-420-069  
R  B. Installation of the Flap Track Fairing  
R  WARNING : USE SOLVENTS/CLEANING AGENTS, SEALANTS AND OTHER SPECIAL_______  
R  MATERIALS ONLY WITH A GOOD SUPPLY OF AIR.  
R  OBEY THE MANUFACTURERS INSTRUCTIONS.  
R  PUT ON PROTECTIVE CLOTHING.  
R  DO NOT GET THEM IN YOUR MOUTH.  
R  DO NOT SMOKE.  
R  DO NOT BREATHE THE GAS.  
R  THESE MATERIALS ARE POISONOUS, FLAMMABLE AND SKIN IRRITANT.  
R  GET MEDICAL HELP IF YOUR SKIN OR EYES BECOME IRRITATED.  
R  (1) Install the adjusters (52) and make sure that they are adjusted fully  
R  into their mountings.  
R  (2) Align the movable fairing at the forward pivot, then install the  
R  splined fittings (53).
R  Fairing Installation - Dimensions  
R  Figure 412/TASK 57-55-11-991-012 
 1EFF :  301-399,  1  57-55-11 Page 461  
1  1  May 01/04 
 1  1 
 1CES  1
R  (3) Lift the movable fairing:  
R  WARNING : SUPPORT THE UNIT/ASSEMBLY OR IT WILL FALL AND BECOME_______  
R  DAMAGED OR INJURE PERSONNEL. THE UNIT/ASSEMBLY IS HEAVY.  
R  NOTE : The weight of the fairing is approximately 18Kg (40lb).____  
R  (a) Align the control rod (45), with the flap lever and temporarily  
R  install the bolt (41), the bush (42) and the nut (43).  
R  (4) Install the bonding disc (7) and the bonding strap (6) with the bolt  
R  (9) and the nut (5) onto the fixed fairing (1).  
R  (5) Torque the nut (5) to between 3.5 and 4.5 m.daN (25.81 and 33.18  
R  lbf.ft).  
R  (6) Temporarily install the fixed fairing (1) with the bolts (2), (8) and  
R  (12).  
R  (7) Measure the dimension A, this must be between 7.5 mm (0.30 in.) and  
R  9.5 mm (0.37 in.).  
R  (8) If the dimension A is not correct, remove the bolts (2), (8) and (12)  
R  and the fixed fairing (1), and continue as follows:  
R  (a) Calculate the quantity of packer(s) (19) to get the dimension A  
R  in limits.  
R  (b) Install the packer(s) (19) on the nut plate assembly.  
R  (c) Install the fixed fairing (1) with the bolts (2), (8) and (12).  
R  (d) Measure the dimension A again.  
R  (9) Align the movable fairing with the fixed fairing (1).  
R  (10) Measure the dimension 'E', at both sides of the pivot. The dimension  
R  must be between zero, +/- 1 mm (0.04 in.).  
 