• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-03-27 12:52来源:蓝天飞行翻译 作者:航空
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

R  flap track 2, 3 or 4, zone 531 (631), 532 (632), 533 (633). 
R  Subtask 57-55-11-865-059 
R  C. Open, safety and tag this(these) circuit breaker(s): 
R  -------------------------------------------------------------------------------
R  PANEL DESIGNATION IDENT. LOCATION 
R  -------------------------------------------------------------------------------
R  49VU FLIGHT CONTROLS/FLP/CTL AND MONG/SYS1 6CV B07 
R  121VU FLIGHT CONTROLS/FLP/CTL AND/MONG/SYS2 8CV Q21

 

R  4. Procedure_________ 
R  (Ref. Fig. 408/TASK 57-55-11-991-009, 409/TASK 57-55-11-991-010, 410/TASK 
R  57-55-11-991-011, 411/TASK 57-55-11-991-013) 
R  Subtask 57-55-11-020-071 
R  A. Removal of the Flap Track Fairing 
R  (1) Remove the applicable fixed fairing (1) 531EB (631EB) or 532EB 
R  (632EB) or 533EB (633EB): 
R  (a) Remove the applicable covers (3): 
R  1_  For the track 2, remove the screws (4) and the covers (3)
R  531AR (631AR), 531AL (631AL). 
R  2_  For the track 3, remove the screws (4) and the covers (3)
R  532AR (632AR), 532AL (632AL). 
R  3_  For the track 4, remove the screws (4) and the covers (3)
R  533AR (633AR), 533AL (633AL). 
R  (b) Remove the applicable lower cover (13): 
R  1_  For the track 2, remove the screws (14) and the lower cover
R  (13) 531FB (631FB). 
R  2_  For the track 3, remove the screws (14) and the lower cover
R  (13) 532FB (632FB). 
R  3_  For the track 4, remove the screws (14) and the lower cover
R  (13) 533FB (633FB). 
R  (c) Hold the fixed fairing (1) and remove the bolts (2), (8) and 
R  (12). 
R  (d) Remove the nut (15), the bolt (16) and disconnect the bonding 
R  strap (17) from the bracket (18). 
R  (e) Remove the nut (5), the bolt (9), the bonding strap (6) and the 
R  bonding disc (7). 
R  (f) Remove the fixed fairing (1).

 

R Flap Track Fairings - Location and Details (SHEET 1) R Figure 408/TASK 57-55-11-991-009
 1EFF : 301-399, 1 57-55-11Page 451 1 1 May 01/04 1 1 1CES 1


R  Fixed Fairing (SHEET 2) 
R  Figure 409/TASK 57-55-11-991-010
 1EFF :  301-399,  1  57-55-11 Page 452 
1  1  May 01/04
 1  1
 1CES  1

 

R  Bonding Straps - Location and Detail 
R  Figure 410/TASK 57-55-11-991-011
 1EFF :  301-399,  1  57-55-11 Page 453 
1  1  May 01/04
 1  1
 1CES  1

 

R  Movable Fairings - FWD Attachments 
R  Figure 411/TASK 57-55-11-991-013
 1EFF :  301-399,  1  57-55-11 Page 454 
1  1  May 01/04
 1  1
 1CES  1

 

R  (2) Remove the applicable movable fairing 531CB (631CB) or 532CB (632CB) 
R  or 533CB (633CB): 
R  (a) Remove the applicable top cover (10): 
R  1_  For the track 2, remove the screws (11) and the top cover (10)
R  531AT (631AT). 
R  2_  For the track 3, remove the screws (11) and the top cover (10)
R  532AT (632AT). 
R  3_  For the track 4, remove the screws (11) and the top cover (10)
R  533AT (633AT). 
R  (b) Remove the nut (25) and the bolt (23) and disconnect the bonding 
R  strap (24) from the rod assembly. 
R  (c) Remove and discard the cotter pin (44). 
R  (3) Disconnect the movable fairing: 
R  WARNING : SUPPORT THE UNIT/ASSEMBLY OR IT WILL FALL AND BECOME_______ 
R  DAMAGED OR INJURE PERSONNEL. THE UNIT/ASSEMBLY IS HEAVY. 
R  NOTE : The weight of the flap fairings is approximately 18kg (40lb).____ 
R  (a) Hold the movable fairing and remove the nut (43), the bush (42) 
R  and the bolt (41). 
R  (4) Lower the movable fairing: 
R  CAUTION : MOVE THE MOVABLE FAIRING SLOWLY. DO NOT LET THE MOVABLE_______ 
R  FAIRING TURN TOO FAR VERTICALLY BECAUSE THIS WILL CAUSE 
R  DAMAGE. 
R  (a) Carefully lower the applicable movable fairing until you can get 
R  access to the flap track beam attachment. 
R  (b) Remove and discard the cotter pin (50). 
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM WINGS 机翼5(65)