(c)
If necessary, put the shim (11) in position on the target
mounting bracket (12).
(d)
Align the target (10) with the shim (11) if installed, and install with the washers (9) and the bolts (8).
(e)
TORQUE the bolts (8) to 1.5 m.daN (11.06 lbf.ft).
(f)
Apply a layer of SEALANTS (Material No. 09-001) to the bolts (8) and the washers (9).
(2) For System 1 (18GA), if the dimension Z was adjusted:
(a) Use a clean MISCELLANEOUS (Material No. 19-003) made moist with CLEANING AGENTS (Material No. 11-026) to clean the mating faces of:
-
the sensor (6)
-
the shim (5) if installed
-
the sensor mounting bracket (2).
NOTE : Make sure that the shim, if necessary, is installed in the
____
correct position.
(b)
Apply BONDING AND ADHESIVE COMPOUNDS (Material No. 08-001) to both sides of the shim (5).
(c)
If necessary, put the shim (5) in position on the sensor mounting bracket (2).
(d)
Align the sensor (6) with the shim (5) if installed, and install with the bolts (7), the washers (4) and the nuts (3).
(e)
TORQUE the bolts (7) to 1.5 m.daN (11.06 lbf.ft).
(f)
Remove the blanking caps from the applicable electrical
connectors.
(g)
Connect the electrical connector (1) to the proximity sensor (6).
1EFF : ALL 1 32-31-73Page 570 1 1 Aug 01/05R 1 1 1CES 1
(h) Apply a layer of SEALANTS (Material No. 09-001) to the bolts (7), the washers (4) and the nuts (3).
(3) For System 2 (19GA), if the dimension Z was adjusted:
(a) Use a clean MISCELLANEOUS (Material No. 19-003) made moist with CLEANING AGENTS (Material No. 11-026) to clean the mating faces of:
-
the sensor (23)
-
the shim (22) if installed
-
the sensor mounting bracket (21).
NOTE : Make sure that the shim, if necessary, is installed in the
____
correct position.
(b)
Apply BONDING AND ADHESIVE COMPOUNDS (Material No. 08-001) to both sides of the shim (22).
(c)
If necessary, put the shim (22) in position on the sensor
mounting bracket (21).
(d)
Align the sensor (23) with the shim (22) and install with the bolts (18), the washers (20) and the nuts (19).
(e)
TORQUE the bolts (18) to 1.5 m.daN (11.06 lbf.ft).
(f)
Remove the blanking caps from the applicable electrical
connectors.
(g)
Connect the electrical connector (17) to the proximity sensor (23).
(h)
Apply a layer of SEALANTS (Material No. 09-001) to the bolts (18), the washers (20) and the nuts (19).
(4) For System 2 (19GA), if the dimension X was adjusted:
(a) Use a clean MISCELLANEOUS (Material No. 19-003) made moist with CLEANING AGENTS (Material No. 11-026) to clean the mating faces of:
-
the target (14)
-
the shim (13) if installed
-
the target mounting bracket (12).
NOTE : Make sure that the shim, if necessary, is installed in the
____
correct position.
1EFF : ALL 1 32-31-73Page 571 1 1 Aug 01/05R 1 1 1CES 1
(b)
Apply BONDING AND ADHESIVE COMPOUNDS (Material No. 08-001) to both sides of the shim (13).
(c)
If necessary, put the shim (13) in position on the target mounting bracket (12).
(d)
Align the target (14) with the shim (13) and install with the washers (15) and the bolts (16).
(e)
TORQUE the bolts (16) to 1.5 m.daN (11.06 lbf.ft).
(f)
Apply a layer of SEALANTS (Material No. 09-001) to the bolts (16) and the washers (15).
Subtask 32-31-73-865-078
K. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s): 1GA, 2GA, 52GA.
Subtask 32-31-73-740-059
L. Test
(1) Do a BITE test of the landing gear (Ref. TASK 32-69-00-740-001). Subtask 32-31-73-582-060
M. Lower the Aircraft
(1) Lower the aircraft off jacks (Ref. TASK 07-11-00-586-001).
1EFF : ALL 1 32-31-73Page 572 1 1 Aug 01/05R 1 1 1CES 1
Subtask 32-31-73-865-087
N. Make sure that this(these) circuit breaker(s) is(are) closed:
-------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM LANDING GEAR 起落架5(74)