• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-03-25 17:58来源:蓝天飞行翻译 作者:admin
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

 (3)
 Put a warning notice on the ground service connection to tell persons not to pressurize the Green and Yellow hydraulic systems.

 (4)
 On the panel 400VU:


 -Make sure that the landing-gear control-lever 6GA is in the DOWN position.
 -Put a warning notice in position to tell persons not to operate the landing gear.
 Subtask 32-31-44-860-059
 B. Aircraft Maintenance Configuration
 (1)
 To do this task it is necessary to put the aircraft on jacks (Ref. TASK 07-11-00-581-001)

 (2)
 Energize the aircraft electrical circuits are energized (Ref. TASK 24-41-00-861-002)


 (3)
 Put the safety barriers in position. Subtask 32-31-44-010-054

 C. Get Access

 (1)
 Open the applicable MLG door (Ref. TASK 32-12-00-010-001). Subtask 32-31-44-869-055


 D. Disconnection of the PTU Isolation Coupling
 (1)
 Depressurize the Green hydraulic system (Ref. TASK 29-10-00-864-001).

 (2)
 Depressurize the reservoir of the Green hydraulic system (Ref. TASK 29-14-00-614-001).


R 1EFF : 001-049, 051-099, 101-149, 151-199, 1 32-31-44Page 449 1201-299, 401-499, 1Aug 01/05 1 1 1CES 1


 (3)
 Disconnect the PTU isolation coupling (Ref. TASK 29-23-00-860-001).

 (4)
 Obey the flight configuration precautions (Ref. TASK 32-00-00-860-001).


 4. Procedure
_________ Subtask 32-31-44-020-054
 A. Removal of MLG Uplock-Support Struts
 (Ref. Fig. 406/TASK 32-31-44-991-006)

 (1) Remove the support strut A.
 (a) Make a note of the dimension "Y".
 (Ref. Fig. 406/TASK 32-31-44-991-006)

 NOTE : This dimension is necessary for the installation of the
____
 new component.

 (b)
 Remove and discard the cotter pins (5) and (11).

 (c)
 Remove the nut (4) and the washer (3).

 (d)
 Remove the bolt (1) and the bush (2).

 (e)
 Remove the nut (12) and the washers (9) and (10).

 (f)
 Pull the bolt (6) out and removed the washers assembly (7).

 (g)
 Remove the support strut A (8).


 (2) Remove the support strut B
 (a) Make a note of the dimension "Z"
 (Ref. Fig. 406/TASK 32-31-44-991-006)

 NOTE : This dimension is necessary for the installation of the
____
 new component.

 (b)
 Remove and discard the cotter pins (19) and (21).

 (c)
 Remove the nut (20) and the washer (22).

 (d)
 Remove the bolt (24) and the bush (23).

 (e)
 Remove the nut (18) and the washers (16) and (17).


R 1EFF : 001-049, 051-099, 101-149, 151-199, 1 32-31-44Page 450 1201-299, 401-499, 1Aug 01/05 1 1 1CES 1


 (f)
 Pull the bolt (13) out and removed the washers assembly (14).

 (g)
 Remove the support strut B (15).


R 1EFF : 001-049, 051-099, 101-149, 151-199, 1 32-31-44Page 451 1201-299, 401-499, 1Aug 01/05 1 1 1CES 1


 Rigging of the MLG Uplock Assembly 2509GM (2510GM) Figure 406/TASK 32-31-44-991-006- 13 (SHEET 1)
R 1EFF : 001-049, 051-099, 101-149, 151-199, 1 32-31-44Page 452 1201-299, 401-499, 1Aug 01/05 1 1 1CES 1


 Rigging of the MLG Uplock Assembly 2509GM (2510GM) Figure 406/TASK 32-31-44-991-006- 23 (SHEET 2)
R 1EFF : 001-049, 051-099, 101-149, 151-199, 1 32-31-44Page 453 1201-299, 401-499, 1Aug 01/05 1 1 1CES 1


 Rigging of the MLG Uplock Assembly 2509GM (2510GM) Figure 406/TASK 32-31-44-991-006- 33 (SHEET 3)
R 1EFF : 001-049, 051-099, 101-149, 151-199, 1 32-31-44Page 454 1201-299, 401-499, 1Aug 01/05 1 1 1CES 1 TASK 32-31-44-400-004


 Installation of the MLG Uplock - Support Struts with A/C on Jacks
 1. Reason for the Job
__________________
 This task is applicaple if in the installation procedure the setting tool-uplock is used. This is necessary, if the uplock needs new adjustment.
 2. Job Set-up Information
______________________
 A. Fixtures, Tools, Test and Support Equipment
 -------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific container No specific hydraulic cart No specific safety barriers No specific warning notice No specific Torque Wrench : range 0.20 to 3.60 m.daN
 (2.00 to 26.00 lbf.ft) 98D32104018000 1 SETTING TOOL-UPLOCK
 B. Consumable Materials
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM LANDING GEAR 起落架5(11)