• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-03-25 17:58来源:蓝天飞行翻译 作者:admin
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

THE LANDING GEAR AND THE RELATED DOORS


 -COMPONENTS THAT MOVE.
 WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______ GEAR.
 1. Reason for the Job__________________
 To set the clearances of the NLG downlock proximity sensors to the correct
 dimensions.
 2. Job Set-up Information______________________
 A. Fixtures, Tools, Test and Support Equipment
 -------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
 -------------------------------------------------------------------------------
No specific circuit breaker(s) safety clip(s) No specific non metallic scraper No specific non metallic wedge No specific safety barriers No specific access platform 2 m (6 ft. 7 in.) No specific Torque Wrench : range 0.20 to 3.60 m.daN
 (2.00 to 26.00 lbf.ft) 98D32203502000 2 SAFETY PIN - NLG DOOR
 1EFF : ALL 1 32-31-73Page 556 1 1 Aug 01/05R 1 1 1CES 1


 B. Consumable Materials
 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
Material No. 05-111
 NITRIC ACID (Ref. 20-31-00) Material No. 05-112 C Z-23.546
 SODIUM DICHROMATE (Ref. 20-31-00) Material No. 08-001 USA DOD-A-82720
 GENERAL PURPOSE ADHESIVE HONEYCOMB FILLER
 (Ref. 20-31-00) Material No. 09-001 USA MIL-S-8802 TYPE I CLASS A
 FUEL TANK SEALANTPOLYSULFIDE (Ref. 20-31-00) Material No. 11-026 GB DEF-STAN 68-148/1
 SOLVENT GENERAL PURPOSE (Ref. 20-31-00) Material No. 19-003 USA AMS 3819
 LINT-FREE COTTON CLOTH (Ref. 20-31-00)
 C. Expendable Parts
 -------------------------------------------------------------------------------
FIG.ITEM --------- |DESIGNATION ---------------------------------------- |IPC-CSN------------------------------
5  shim  32-21-17 03 -040
 11  shim  32-21-17 03 -110
 13  shim  32-21-17 03 -110
 22  shim  32-21-17 03 -040
 D. Referenced Information
 ------------------REFERENCE  -------------------------------DESIGNATION ------------------------------

-------------------------------------------------------------------------------
07-11-00-581-003  Lifting of the Aircraft at Forward Jacking Point, MLG Wheels on the Ground
 07-11-00-586-001  Lowering of the Aircraft at Forward Jacking Point, MLG Wheels on the Ground
 24-41-00-862-002  De-energize the Aircraft Electrical Circuits Supplied
 from the External Power
 29-10-00-864-001  Depressurize the Green Hydraulic System
 29-14-00-614-002  Pressurization of the Hydraulic Reservoirs through
 the Ground Connector
 1EFF : ALL 1 32-31-73Page 557 1 1 Aug 01/05R 1 1 1CES 1


 -------------------------------------------------------------------------------
REFERENCE DESIGNATION -------------------------------------------------------------------------------
29-23-00-860-001  Disconnection of the Isolation Coupling of the Power Transfer Unit (PTU)
 29-23-00-860-002  Connection of the Isolation Coupling of the Power Transfer Unit (PTU)
 32-00-00-481-001  Installation of the Safety Devices on the Landing Gears
 32-00-00-481-002  Installation of the Safety Devices on the Landing Gear Doors
 32-00-00-860-001  Flight Configuration Precautions with Electrical Power
 32-00-00-860-002  Ground Configuration after Flight Configuration with Electrical Power
 32-22-00-010-001  Nose Gear Doors - Ground Doors Opening
 32-22-00-410-001  Nose Gear Doors - Ground Doors Closing
 32-69-00-740-001  BITE Check Landing Gear Control Interface Unit (LGCIU) using MCDU to Ensure that Continuous BITE is Operative
 32-31-73-991-024  Fig. 510
 3. Job Set-up__________
 Subtask 32-31-73-941-062
 A. Safety Precautions
 (1)
 Put the safety barriers in position.

 (2)
 Make sure that the ground safety locks are installed on the landing-gear (Ref. TASK 32-00-00-481-001).

 (3)
 On the panel 400VU:


 -make sure that the landing-gear control-lever 6GA is in the DOWN position
 -put a warning notice in position to tell persons not to operate the landing-gear and the NLG doors.
 1EFF : ALL 1 32-31-73Page 558 1 1 Aug 01/05R 1 1 1CES 1


 Subtask 32-31-73-860-063
 B. Aircraft Maintenance Configuration
 (1)
 Make sure that the Green hydraulic system is depressurized (Ref. TASK 29-10-00-864-001).
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM LANDING GEAR 起落架5(70)