R 1EFF : 001-049, 051-099, 101-149, 151-199, 1 32-31-44Page 437 1201-299, 401-499, 1Aug 01/05 1 1 1CES 1 TASK 32-31-44-400-003


 Installation of the Uplock Assembly 2509GM (2510GM) with A/C on Jacks
 1. Reason for the Job
__________________
 This task is applicaple if in the installation procedure the setting tool-uplock is used. This is necessary, if the uplock needs new adjustment.
 2. Job Set-up Information
______________________
 A. Fixtures, Tools, Test and Support Equipment
 -------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific container No specific hydraulic cart No specific warning notices No specific Torque Wrench : range 0.20 to 3.60 m.daN
 (2.00 to 26.00 lbf.ft) No specific Torque Wrench : range 1.00 to 10.00 m.daN
 (8.00 to 75.00 lbf.ft) No specific Torque Wrench : range 2.00 to 20.00 m.daN
 (15.00 to 150.00 lbf.ft) 98DNSA20208060 2 RIGGING PIN 98D32104018000 1 SETTING TOOL-UPLOCK
 B. Consumable Materials
 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
Material No. 05-002 USA MIL-P-8116 PUTTY, ZINC CHROMATE GENERAL PURPOSE (Ref. 20-31-00) Material No. 07-010 D DA-4-653-91 LACQUER OBSOLETE USE 16-047 (Ref. 20-31-00)
 Material No. 19-010  USA AMS 5687 LOCKWIRE STAINLESS STEEL ANNEALED 0.8MM DIA (Ref. 20-31-00)
R 1EFF : 001-049, 051-099, 101-149, 151-199, 1 32-31-44Page 438 1201-299, 401-499, 1Aug 01/05 1 1 1CES 1 C. Expendable Parts

 

 -------------------------------------------------------------------------------FIG.ITEM |DESIGNATION |IPC-CSN -------------------------------------------------------------------------------
3  cotter pin 
15  cotter pin 
28  cotter pin 
32  cotter pin 
38  cotter pin 

D. Referenced Information

32-31-03 22 -12032-31-03 22 -260A32-31-03 22 -260A32-31-03 22 -06032-33-03 01 -170
 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
12-12-29-611-001  Fill the Hydraulic Fluid Reservoir with a Hand Pump
 20-28-00-912-004  Electrical Bonding of Components With Conductive
 Bolts and Screws and Bonding Straps in the Fuselage
 and in the Wings (this does not include the tanks)-
24-41-00-861-002  Energize the Aircraft Electrical Circuits from the
 External Power
 29-00-00-910-002  Safety Procedures of the Hydraulic System
 29-10-00-864-001  Depressurize the Green Hydraulic System
 29-14-00-614-001  Depressurization of the Hydraulic Reservoirs
 29-23-00-860-001  Disconnection of the Isolation Coupling of the Power
 Transfer Unit (PTU)
 29-23-00-860-002  Connection of the Isolation Coupling of the Power
 Transfer Unit (PTU)
 32-00-00-860-001  Flight Configuration Precautions with Electrical
 Power
 32-00-00-860-002  Ground Configuration after Flight Configuration with
 Electrical Power
 32-12-00-010-001  Open the Main Gear Doors for Access
 32-12-00-410-001  Close the Main Gear Doors after Access
 32-31-00-720-002  Functional Test of the Normal Extension and
 Retraction of the Landing Gear
 32-33-00-720-001  Functional Check of Free-Fall Extension
 51-75-13-916-002  Repair to a layer of Corrosion Preventive Compound
 32-31-44-991-001  Fig. 401
 32-31-44-991-005  Fig. 405 

R 1EFF : 001-049, 051-099, 101-149, 151-199, 1 32-31-44Page 439 1201-299, 401-499, 1Aug 01/05 1 1 1CES 1


 3. Job Set-up
__________
 Subtask 32-31-44-860-057
 A. Aircraft Maintenance Configuration
 (1)
 Make sure that the aircraft is on jacks

 (2)
 Make sure that the PTU isolation coupling is disconnected (Ref. TASK 29-23-00-860-001).

 (3)
 Make sure that the aircraft electrical circuits are energized (Ref. TASK 24-41-00-861-002)

 (4)
 Make sure that the flight configuration precautions are obeyed (Ref. TASK 32-00-00-860-001).

 (5)
 Make sure that the Green hydraulic system is depressurized (Ref. TASK 29-10-00-864-001).

 (6)
 Make sure that the reservoir of the Green hydraulic system is depressurized (Ref. TASK 29-14-00-614-001).
 