_______ PINS ARE INSTALLED.
1.
Reason for the Job
__________________
Self Explanatory
2.
Job Set-up Information
______________________
A. Fixtures, Tools, Test and Support Equipment
-------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific blanking plug
No specific safety barriers
No specific warning notice(s)
No specific access platform 2.06 m (6 ft. 9 in.)
No specific container 5 l (1.3208 USgal)
B. Referenced Information
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
29-00-00-864-001 Put the Related Hydraulic System in the Depressurized
Configuration before Maintenance Action 29-14-00-614-001 Depressurization of the Hydraulic Reservoirs 32-22-00-010-001 Nose Gear Doors - Ground Doors Opening 32-31-58-991-001 Fig. 401
1EFF : ALL 1 32-31-58Page 401 1 1 Feb 01/98 1 1 1CES 1
3. Job Set-up
__________ Subtask 32-31-58-860-051
A. Aircraft Maintenance Configuration
(1)
Make sure that the Green hydraulic system is depressurized and put it in the maintenance configuration. (Ref. TASK 29-00-00-864-001)
(2)
Depressurize the reservoir of the Green hydraulic system. (Ref. TASK 29-14-00-614-001)
Subtask 32-31-58-941-050
B. Safety Precautions
(1)
In the cockpit, on the panel 400VU put warning notice(s) in position to tell persons not to operate the landing gear control lever.
(2)
Put warning notice(s) in position to tell persons not to pressurize the Green hydraulic system: - on the panel 40VU in the cockpit, - on the ground service panel of the Green hydraulic system, access
door (197CB).
(3)
Put the safety barriers in position.
(4)
Put the container in position below the NLG door closing restrictor (2536GM).
Subtask 32-31-58-010-050
C. Get Access
(1)
Open the doors of the nose landing gear. (Ref. TASK 32-22-00-010-001)
(2)
Put the access platform in position in zone 123.
1EFF : ALL 1 32-31-58Page 402 1 1 Feb 01/98 1 1 1CES 1
4. Procedure
_________
(Ref. Fig. 401/TASK 32-31-58-991-001) Subtask 32-31-58-020-051
A. Removal of the Restrictor
(1)
Disconnect the hydraulic line (4) and put a blanking plug on the disconnected line end.
(2)
Remove the restrictor (3), remove and discard the seal (2) and put a blanking plug on the selector valve (1).
1EFF : ALL 1 32-31-58Page 403 1 1 Feb 01/98 1 1 1CES 1
NLG Door Closing Restrictor
Figure 401/TASK 32-31-58-991-001
1EFF : ALL 1 32-31-58 Page 404
1 1 Feb 01/98
1 1
1CES 1
TASK 32-31-58-400-001
Installation of the NLG Door Closing Restrictor
1. Reason for the Job
__________________
Self Explanatory
2. Job Set-up Information
______________________
A. Fixtures, Tools, Test and Support Equipment
-------------------------------------------------------------------------------REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
No specific safety barriers
No specific warning notice(s)
No specific access platform 2.06 m (6 ft. 9 in.)
No specific container 5 l (1.3208 USgal)
No specific Torque Wrench : range 0.20 to 3.60 m.daN
(2.00 to 26.00 lbf.ft)
B. Expendable Parts
-------------------------------------------------------------------------------FIG.ITEM |DESIGNATION |IPC-CSN -------------------------------------------------------------------------------
2 seal 32-31-01 10 -110
C. Referenced Information
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
12-12-29-611-001 Fill the Hydraulic Fluid Reservoir with a Hand Pump 12-12-29-611-002 Fill the Hydraulic Fluid Reservoir with a Hydraulic
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM LANDING GEAR 起落架5(42)