• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-03-25 17:58来源:蓝天飞行翻译 作者:admin
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

 (g)
 If necessary, adjust the new spacer (1) to get the correct dimension Z.


 NOTE : It is possible that two spacers are necessary.
____
 (h)
 Put the applicable proximity sensor 22GA(23GA) and the new spacer

 (1) if necessary, in position on the sensor mounting bracket.

 (i)
 Install the screws (2), the washers (9) and the nuts (8).

 (j)
 Torque tighten the nuts (8) to between 0.39 and 0.45 m.daN (34.51 and 39.82 lbf.in).

 (k)
 Apply SEALANTS (Material No. 09-016) to the areas that follow:

 -around the joints between the applicable proximity sensor 22GA(23GA), the spacer (1) if installed, and the sensor mounting bracket
 -
to the heads and the ends of the screws (2)

 -
to the washers (9)

 -
to the nuts (8).

 

 (l)
 Remove the blanking caps and connect the electrical connector to the applicable proximity sensor 22GA(23GA).


 (7) Do a check of the Proximity Sensor Detection Range Para. 4.B. **ON A/C ALL
 Subtask 32-31-73-865-072
 D. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s): 1GA, 2GA, 52GA.
 1EFF : ALL 1 32-31-73Page 541 1 1 Aug 01/05R 1 1 1CES 1


 Subtask 32-31-73-582-058
 E. Lower the Aircraft
 (1)
 Lower the aircraft off jacks (Ref. TASK 07-11-00-582-002). Subtask 32-31-73-740-058

 F. Test

 (1)
 Do a BITE test of the landing gear (Ref. TASK 32-69-00-740-001). Subtask 32-31-73-860-060


 G. Aircraft Maintenance Configuration
 (1) If you did the flight configuration precautions, put the aircraft back to the ground configuration (Ref. TASK 32-00-00-860-002).
 Subtask 32-31-73-410-057
 H. Close Access
 (1)
 Make sure that the work area is clean and clear of tool(s) and other items.

 (2)
 Remove the access platform(s).

 (3)
 Close the MLG doors (Ref. TASK 32-12-00-410-001).


 5. Close-up
________ Subtask 32-31-73-942-058
 A. Removal of Equipment
 (1)
 Remove the safety barriers.

 (2)
 Remove the warning notice(s).

 (3)
 Remove the ground support and maintenance equipment, the special and standard tools and all other items.


 1EFF : ALL 1 32-31-73Page 542 1 1 Aug 01/05R 1 1 1CES 1


 TASK 32-31-73-820-003
 Adjustment of the MLG Door Open Proximity Sensors 32GA, 33GA, 34GA, 35GA
 WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______ START A TASK ON OR NEAR:
 -
THE FLIGHT CONTROLS

 -
THE FLIGHT CONTROL SURFACES

 -
THE LANDING GEAR AND THE RELATED DOORS


 -COMPONENTS THAT MOVE.
 WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______ GEAR.
 1. Reason for the Job
__________________
 To set the clearances of the MLG door open proximity sensors to the correct dimensions.
 2. Job Set-up Information
______________________
 A. Fixtures, Tools, Test and Support Equipment
 -------------------------------------------------------------------------------REFERENCE QTY DESIGNATION
 -------------------------------------------------------------------------------
No specific circuit breaker(s) safety clip(s)
 No specific warning notice
 No specific access platform 2.0 m (6 ft. 7 in.)
 No specific Torque Wrench : range 0.00 to 1.20 m.daN

 (0.00 to 9.00 lbf.ft) 460005835 1 GROUND LOCK SLEEVE
 B. Consumable Materials
 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
Material No. 09-016  USA MIL-PRF-81733D TYPE II CLASS B CORROSION INHIBITING FILLET CONSISTENCY (Ref. 20-31-00)
 1EFF : ALL 1 32-31-73Page 543 1 1 Aug 01/05R 1 1 1CES 1


 C. Expendable Parts -------------------------------------------------------------------------------
FIG.ITEM --------- |DESIGNATION ---------------------------------------- |IPC-CSN------------------------------
7  spacer  32-31-03 26 -075
 8  spacer  32-31-03 26 -070
 14  spacer  32-31-03 26 -075
 15  spacer  32-31-03 26 -070
 D. Referenced Information
 ------------------REFERENCE  -------------------------------DESIGNATION ------------------------------
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM LANDING GEAR 起落架5(66)