 Do an inspection of the component interface and/or the adjacent area.


 1EFF : ALL 1 32-31-46Page 454 1 1 Feb 01/05R 1 1 1CES 1


 Subtask 32-31-46-420-061
R B. Installation of the MLG Actuating Cylinder Wing-End Pin
 (1)
 Use the GUIDE CONE (98D32104015000) to install the pin (1) in the actuating cylinder.

 (2)
 Apply a thin layer of SEALANTS (Material No. 09-016) to the interfaces of:

 -
the bottom end of the pin (1)

 -
the collar (7)

 -
the bolt (6)

 -
the nylon-washer (5)

 -
the washer (4)

 -
the nut (3).

 

 (3)
 Put the collar (7) on the pin (1) and install it with:

 -
the bolt (6)

 -
the nylon-washer (5)

 -
the washer (4)

 -
the nut (3).

 


 NOTE : Make sure that the parts are correctly installed.
____
R (4) Tighten the nut (3) with your fingers only on the thread of the bolt R (6). If necessary, tighten the nut (3) again to align with the hole R for the cotter pin (2).
 (5) Safety the nut (3) with the new cotter pin (2).
 Subtask 32-31-46-220-053
 C. Dimensional Check
 (1) Make sure that the dimension X is between 1.8 mm (0.0708 in.) and 6.1 mm (0.2401 in.) at one of the anti-roll pins (8). Dimension X is the correct clearance when the opposite anti-roll pin is held against the washer (10).
 Subtask 32-31-46-420-062
 D. Continue with the Installation Procedure
 (1) Lubricate the actuating cylinder and fittings (Ref. TASK 12-22-32-640-001).
 1EFF : ALL 1 32-31-46Page 455 1 1 Feb 01/05 1 1 1CES 1 Subtask 32-31-46-410-053


 E. Close Access
 (1)
 Make sure that the work area is clean and clear of tool(s) and other items.

 (2)
 Remove the access platform(s).

 (3)
 Connect the isolation coupling of the PTU (Ref. TASK 29-23-00-860-002).


 (4) Close the MLG doors (Ref. TASK 32-12-00-410-001). Subtask 32-31-46-865-057
 F. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
 -------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------
49VU L/G/LGCIU/SYS1/NORM 1GA C09 121VU HYDRAULIC/LGCIU/SYS2 2GA Q35 121VU HYDRAULIC/LGCIU/SYS1/GRND SPLY 52GA Q34
 5. Close-up
________ Subtask 32-31-46-942-053
 A. Removal of Equipment
 (1)
 Make sure that the work area is clean and clear of tool(s) and other items.

 (2)
 Remove the safety barriers.

 (3)
 Remove the warning notice(s).

 (4)
 Remove the ground support and maintenance equipment, the special and standard tools and all other items.


 1EFF : ALL 1 32-31-46Page 456 1 1 Feb 01/05R 1 1 1CES 1


 CHECK VALVE - L/G RETURN ISOLATION (2537GM) - REMOVAL/INSTALLATION
__________________________________________________________________ TASK 32-31-47-000-001 Removal of the Check Valve 2537GM WARNING : MAKE SURE THAT ALL THE CIRCUITS IN MAINTENANCE ARE ISOLATED BEFORE
_______ YOU SUPPLY ELECTRICAL POWER TO THE AIRCRAFT.
 WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______ START A TASK ON OR NEAR:
 -
THE FLIGHT CONTROLS

 -
THE FLIGHT CONTROL SURFACES

 -
THE LANDING GEAR AND THE RELATED DOORS


 -COMPONENTS THAT MOVE. WARNING : OBEY THE HYDRAULIC SAFETY PROCEDURES.
_______
 1.
 Reason for the Job

__________________
 Self Explanatory


 2.
 Job Set-up Information


______________________
 A. Fixtures, Tools, Test and Support Equipment
 -------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific blanking plugs
 No specific circuit breaker(s) safety clip(s)
 No specific warning notices
 No specific access platform 1.5 m (4 ft. 11 in.)
 No specific container 5 l (1.3208 USgal)

 1EFF : ALL 1 32-31-47Page 401 1 1 Feb 01/98 1 1 1CES 1


 B. Referenced Information
 -------------------------------------------------------------------------------
REFERENCE DESIGNATION
 -------------------------------------------------------------------------------
 