• 热门标签

当前位置: 主页 > 航空资料 > 飞行资料 >

时间:2010-05-22 22:41来源:蓝天飞行翻译 作者:admin
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

DEMO OF COCKPIT LIGHTS AND P/B PHILOSOPHY
SHORT EXPLANATION OF EIS, FCU AND ECAM INDICATIONS AND FUNCTIONS
4 - DEMONSTRATION OF MCDU PREPARATION
5 - AUTO ENGINE START
6 - AFTER START CHECK LIST BY INSTRUCTOR
INIT T/O
7 - BEFORE TAKE-OFF CHECK LIST BY INSTRUCTOR
8 - TAKE-OFF - INSTRUCTOR EXPLAINS FMA INDICATIONS
9 - CLIMB TO 5000 FT (AP ENGAGED DURING CLIMB AS REQUIRED)
10 - RADAR VECTORS TO DOWNWIND
11 - APPROACH CHECK-LIST AND MCDU PREPARATION DEMO BY INSTRUCTOR
12 - ILS APPROACH AND AUTOLAND TO FULL STOP DEMO (MED AUTO BRAKE)
INIT T/O
13 - TAKE-OFF (BEFORE TAKE-OFF CHECK LIST BY INSTRUCTOR)
14 - CLIMB TO 10 000 FT (AP AS REQUIRED)
15 - EXPLANATION OF FMA INDICATIONS DURING CLIMB
16 - DEMO ND MODES AND SYMBOLS, EXPLAIN FCU CONTROLS AND FUNCTIONS
SELECTED V MANAGED GUIDANCE PHILOSOPHY (HDG, DIRTO, ALT, ETC...)
17 - FLIGHT CONTROLS (NORMAL LAW) - HANDLING AND PROTECTIONS
(STABILITY, LIMITS, HI-SPEED, HI AOA, ALPHA-FLOOR, ETC...)
18 - RADAR VECTORS TO IAF FOR ILS APPROACH
19 - APPROACH CHECK LIST AND MCDU PREPARATION BY INSTRUCTOR
20 - MANUAL ILS APPROACH WITH FD AND ATHR
21 - LANDING (MANUAL BRAKES)
22 - TAXI TO END OF RUNWAY - 180 DEG TURN
23 - TAKE-OFF (BEFORE TAKE-OFF CHECKS BY INSTRUCTOR)
24 - TURN DOWNWIND AT 2000 FT FOR VISUAL PATTERN
25 - FD OFF - USE OF FPV (LEVEL FLIGHT AND FINAL APPROACH)
26 - VISUAL APPROACH AND LANDING
IF TIME PERMITS :
CM2
27 - TAKE-OFF (BEFORE TAKE-OFF CHECK LIST BY INSTRUCTOR)
28 - RADAR VECTORS TO IAF FOR ILS APPROACH
29 - APPROACH CHECK LIST AND MCDU PREPARATION BY INSTRUCTOR
30 - MANUAL ILS APPROACH WITH FD AND ATHR
31 - LANDING (MANUAL BRAKES)
32 - TAXI TO END OF RUNWAY - 180° DEG TURN
A319/A320/A321
FLIGHT CREW TRAINING MANUAL
2.20.03
E F20
Page 4
REV 21 MAY 98
EXECUTIVE FAMILIARIZATION COURSE
TRAINING SYLLABI
EFC20\FFS1
FFS 2 TAKE-OFF DATA
INIT PAGE ATIS
CO RTE FROM/TO TRIP DIST RWY ............... 33 L
N. A. LFBO/LFBO LOCAL WIND ............. 240°/10 kt
ALTN/CO RTE CRZ WIND VISI ................ CAVOK
N. A. VRB CEILING ........
FLT NBR ALTN TEMP.............. 14°C
[Airline ID] 202 LFBO DEW POINT ... 10°C
LAT LONG ALTN DIST QNH ............... 1010 hPa/29.83 inHg
4338.1N 00122.1E N. A. QFE ............... 992 hPa/29.29 inHg
COST INDEX FL to ALTN RWY COND ... DRY
30 N. A. Observations : AIR COND ON
CRZ FL/TEMP TROPO ________________
FL 150 / -15°C DEFAULT ________________
________________
INIT NEXT PAGE PERF PAGE T/O FLAPS NOTE :
ZFCG/ZFW IAE CFM 1 + F
28%-48 t
28%-105.600 lb
V1 124 124
T/O C.G.
VR 133 134 26.6%
V2 133 134 TOGA
BLOCK
10 t
22.000 lb
FLEX 56 52 FLEX
DRT DRT
A319/A320/A321
FLIGHT CREW TRAINING MANUAL
2.20.03
E F20
Page 5
REV 21 MAY 98
EXECUTIVE FAMILIARIZATION COURSE
TRAINING SYLLABI
EFC20\FFS2
MALFUNC
REF. - FFS 2 - - +
INIT T/O
1 - TRANSIT COCKPIT PREPARATION DEMO BY INSTRUCTOR
2 - MCDU PREPARATION BY CM1 (TALK THROUGH BY INSTRUCTOR)
3 - INSTANT ENGINE START
4 - AFTER START CHECK LIST EXCEPT FLAPS
DEMO TAKE-OFF CONFIG TEST ON ECAM CONTROL PANEL
COMPLETE AFTER START CHECK LIST
5 - BEFORE TAKE-OFF CHECK LIST BY INSTRUCTOR
6 - TAKE-OFF - DEMO FLT CTL REACTION TO ENGINE FAILURE AFTER ROTATION
CM1 MAKES ROTATION TO 15° PITCH THEN HANDS AND FEET OFF
ENGINE 1 FLAME OUT - EXPLAIN FLT CTL REACTION AND BETA TGT
INDICATE BANK ANGLE, RUDDER POSITION AND AIRSPEED INDICATIONS
(ALPHA PROT, ALPHA FLOOR)
INIT T/O
7 - TAKE-OFF - ENG 1 FLAME OUT AFTER GEAR UP
MANUAL CONTROL BY CM1 OF FLIGHT PATH AND BETA TGT TO 1000 FT
INIT T/O
8 - TAKE-OFF - ENG 1 FLAME OUT AFTER GEAR UP
MANUAL CONTROL BY CM1 OF FLIGHT PATH AND BETA TGT TO 1000 FT
INIT T/O
9 - TAKE-OFF - ENG 1 FLAME OUT AFTER ROTATION - ENGAGE AP 1
INDICATE AP CONTROL OF FLIGHT PATH AND RUDDER
ABOVE 400 FT AGL EXPLAIN AND CARRY OUT ECAM PROCEDURE FOR ENG FLAME OUT
10 - MAINTAIN 3000 FT - RADAR VECTORS DOWNWIND FOR ILS APPROACH
11 - APPROAHC CHECK LIST AND MCDU PREPARATION
12 - ONE ENGINE OUT ILS APPROACH WITH AP ENGAGED TO MDA
AT MDA DISCONNECT AP FOR MANUAL LANDING
INIT T/O
13 - TAKE-OFF - SID (MANAGED NAV AND VERTICAL - CLB/CLB/NAV)
14 - CLIMB TO 15 000 FT - INSERT ALTITUDE AND SPEED CONSTRAINTS DURING CLIMB
(EXPLAIN INDICATIONS ON FMA, MCDU AND ND)
15 - HYD : GREEN RSVR LO LVL - EXPLAIN TASK SHARING AND ECAM PROCEDURE
16 - HYD : BLUE RSVR L LVL - HYD : G + B SYS LO PRE - ECAM PROCEDURE
CM1 AND CM2 FLT CTLS A/C HANDLING - EXPLAIN SYS PAGE AND STATUS PAGE - Restore
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:Airbus.Flight.Crew.Training.Manual空客机组训练手册2(81)