「一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一1 EFF : ALL ∞∞34-53-00∞∞∞∞∞∞∞∞∞∞Page 225
May 01/05 CES
R (2) If the test gives again the maintenance message ADF1 : NO DATA FROM
R CONTROL SOURCE:
R - do the BITE test of the VOR/MKR (Ref. AMM TASK 34-55-00-740-002).
R (a) If the BITE test gives a maintenance message related to a RMP
R failure:
R - replace the RMP-COM/NAV FREQ SEL, 1 (1RG1) (Ref. AMM TASK 23-
R 13-13-000-001) and (Ref. AMM TASK 23-13-13-400-001).
R 1 If the fault continues:_
R - do a check and repair the wiring of the NAV FREQ DATA OUTPUT
R bus from the COM/NAV FREQ SEL RMP 1 (1RG1) the first
R terminal block (Ref. ASM 34-53/01).
R (b) If the BITE test does not give a maintenance message related to a
R RMP failure:
R - replace the RECEIVER-ADF, 1 (2RP1) (Ref. AMM TASK 34-53-31-000-
R 002) and (Ref. AMM TASK 34-53-31-400-002).
R 1 If the fault continues:_
R - do a check and repair the wiring of the FREQUENCY CONTROL
R PORT A bus from the ADF receiver 1 (2RP1) to the first
R terminal block (Ref. ASM 34-53/01).
R **ON A/C ALL
B. Do the test given in Para. 3.
Loss of the ADF 2 Tuning Data
1. Possible Causes
_______________
- FMGC-2 (1CA2)
- RMP-COM/NAV FREQ SEL, 2 (1RG2)
- RECEIVER-ADF, 2 (2RP2)
- wiring of the FMGC OWN CB 1 bus from the FMGC 2 (1CA2) to the first
terminal block
- wiring of the DATA FROM FMGC bus from the COM/NAV FREQ SEL RMP 2 (1RG2) to the first terminal block
- wiring of the NAV FREQ DATA OUTPUT bus from the COM/NAV FREQ SEL RMP 2 (1RG2) the first terminal block
- wiring of the FREQUENCY CONTROL PORT A bus from the ADF receiver 2 (2RP2) to the first terminal block
2. Job Set-up Information
______________________
A. Referenced Information
-------------------------------------------------------------------------------REFERENCE DESIGNATION
-------------------------------------------------------------------------------
AMM 22-83-34-000-001 Removal of the FMGC (1CA1,1CA2)
AMM 22-83-34-400-001 Installation of the FMGC (1CA1,1CA2)
AMM 23-13-13-000-001 Removal of the Radio Management Panel (CRMP) (1RG1,
1RG2, 1RG3) AMM 23-13-13-400-001 Installation of the Radio Management Panel (CRMP)
(1RG1, 1RG2, 1RG3) AMM 34-14-00-740-001 Interface Test of the IR AMM 34-53-00-740-003 BITE Test of the ADF AMM 34-53-31-000-002 Removal of the ADF Receiver (2RP1, 2RP2) AMM 34-53-31-400-002 Installation of the ADF Receiver (2RP1, 2RP2) AMM 34-55-00-740-002 BITE Test of the VOR/MKR ASM 22-86/02 ASM 23-13/01 ASM 34-53/01
3. Fault Confirmation
__________________
A. Test
(1) Do the BITE test of the ADF (Ref. AMM TASK 34-53-00-740-003).
「一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一1 EFF : ALL ∞∞34-53-00∞∞∞∞∞∞∞∞∞∞Page 227
May 01/05R
CES 4. Fault Isolation
_______________
R **ON A/C 001-049, 101-105, 151-199,
A. If the test gives the maintenance message FMGC2(1CA2)/RMP2(1RG2)/ADF2(2RP2): - on the center pedestal, on the RMP 2, push the NAV and the ADF
pushbutton switches (the green LED on these pushbutton switches comes on).
- do the BITE test of the ADF (Ref. AMM TASK 34-53-00-740-003).
(1) If the test does not give the maintenance message
FMGC2(1CA2)/RMP2(1RG2)/ADF2 (2RP2):
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320 Trouble Shooting Manual 排故手册 导航 NAVIGATION 3(130)