• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-11-01 22:11来源:蓝天飞行翻译 作者:航空
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

NOTE: The speedbrakes/spoilers should be down prior to disconnecting power from the airplane. Ensure control surface areas are clear of personnel and equipment before movement.
1. Provide electrical power.
2. Open WARN ELEC A and WARN ELEC B circuit breakers on the P11 overhead panel.
3. Reset WARN ELEC A circuit breaker.
4. Pressurize the left hydraulic system (AMM 29-11-00/201).
5. Position the flap lever to the 1-unit detente. Verify that the flaps move to 1 (one) and the slats move to the intermediate (takeoff) position.
6. Hold both test STALL test switches in the STALL position.
7. Verify that one (or both) stick shaker(s) operates normally and the slats move to the fully extended (landing) position.
8. Release the test switches.
9. Verify that the stick shaker(s) ceases to operate and the slats retract to the intermediate (takeoff) position.
10. Repeat steps 6 through 9 with the WARN ELEC B circuit breaker closed and the WARN ELEC A circuit breaker open.


 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:757 最低设备清单 Minimum Equipment List (MEL) 1(88)