 - replace the defective lamp.
 「一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一1 EFF : ALL ∞∞33-13-00∞∞∞∞∞∞∞∞∞∞Page 206
 Feb 01/98 CES


 Instrument and Panel Integral Lighting
 Figure 203/TASK 33-13-00-991-005

 「一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一1 EFF : ALL ∞∞33-13-00∞∞∞∞∞∞∞∞∞∞Page 207
 Feb 01/98 CES (b) If there is no voltage:


 - do a check and repair the wiring (Ref. ASM 33-13/02).
 (2) If the integral lighting of several instruments and/or panels is inoperative:
 - do a check of the lighting controller fuse related to the defective lighting circuit (Ref. ASM 33-13/02).
 (a) If the fuse is correct:
 - replace the CONTROLLER-LIGHTING (6LF) (Ref. AMM TASK 33-13-51-000-001) and (Ref. AMM TASK 33-13-51-400-001). (Ref. Fig. 204/TASK 33-13-00-991-002)
 1 If the fault continues:
_
 - do a check and repair the wiring related to the defective lighting circuit (Ref. ASM 33-13/02).
 (b) If the fuse is not correct:
 - replace the defective fuse.
 (3) If all the integral lighting panels do not operate correctly:
 - do a check of the circuit breaker (3LF) status.
 (a) If the circuit breaker is closed:
 - do a check for 115VAC at pin A/A of the lighting controller (6LF) (Ref. ASM 33-13/02).
 1 If there is 115VAC:
_
 - replace the CONTROLLER-LIGHTING (6LF) (Ref. AMM TASK 33-13-51-000-001) and (Ref. AMM TASK 33-13-51-400-001).
 a If the fault continues:
_
 - replace the POT-INT LT/OVHD INTEG LT (7LF) (Ref. IPC 331308).
 b If the fault continues:
_
 - do a check and repair the wiring between the lighting controller (6LF) and the INT LT/OVHD INTEG LT potentiometer (7LF).
 2 If there is no 115VAC:
_
 - do a check for a ground signal at pins A/C, B of the lighting controller (6LF) (Ref. ASM 33-13/02).
 a If there is no ground signal:
_
 - repair the defective wiring between the lighting controller (6LF) pin A/C or A/B and the ground terminal (Ref. ASM 33-13/02).
 b If there is a ground signal:
_
 - replace the C/B-LIGHTING/INST LT/OVHD/PNL (3LF): . if the fault continues:
 「一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一1 EFF : ALL ∞∞33-13-00∞∞∞∞∞∞∞∞∞∞Page 208
 Feb 01/98 CES


 Integral Lighting Controller Overhead 6 LF
 Figure 204/TASK 33-13-00-991-002

 「一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一1 EFF : ALL ∞∞33-13-00∞∞∞∞∞∞∞∞∞∞Page 209
 Feb 01/98 CES - do a check and repair the wiring between the lighting controller (6LF) pin A/A and the C/B (3LF) (Ref. ASM 33-13/02).


 (b) If the circuit breaker is open:
 - close the circuit breaker
 1_ If the circuit breaker trips:
 - replace the CONTROLLER-LIGHTING (6LF) (Ref. AMM TASK 33-13-
51-000-001) and (Ref. AMM TASK 33-13-51-400-001).

 a If the fault continues:
_
 - do a check for a short to ground at the wiring between the lighting controller (6LF) pin A/A and the C/B (3LF) (Ref. ASM 33-13/01) . if there is a short to ground:
 - repair the related wiring. . if there is no short to ground:

 - replace the C/B-LIGHTING/INST LT/OVHD/PNL (3LF).


 B. Do the test given in Para. 3.


 TASK 33-13-00-810-803
 Failure at the Glareshield Integral Lighting
 1. Possible Causes
_______________
 - CONTROLLER-LIGHTING (30LF)

 - LT-MAIN INSTRUMENT PNL, CENTER (38LE)

 - PLATE-INT LIGHTED IDENT

 - wiring

 - C/B-LIGHTING/INST LT/GLARE/SHLD (5LF)


 2. Job Set-up Information
______________________
 A. Referenced Information
 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
IPC 331201 IPC 331308 AMM 33-13-00-710-001 Operational Test of the Instrument and Panel Integral
 Lighting AMM 33-13-51-000-001 Removal of the Lighting Controller (6LF, 16LF, 30LF) AMM 33-13-51-400-001 Installation of the Lighting Controller (6LF, 16LF,
 30LF)
 ASM 33-13/03
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320 Trouble Shooting Manual 排故手册 LIGHTS 灯光(28)