Integral Lighting Controller Pedestal and Main Panel 16LF
Figure 202/TASK 33-13-00-991-001
「一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一1 EFF : ALL ∞∞33-13-00∞∞∞∞∞∞∞∞∞∞Page 204
Feb 01/98 CES (b) If the circuit breaker is open:
b_ If there is a ground signal:
- replace the C/B-LIGHTING/INST LT/MAIN INST/PNL AND/PED
(4LF)
. if the fault continues:
* do a check and repair the wiring between the lighting
controller (16LF) pin A/A and the C/B (4LF) (Ref. ASM 33-
13/01).
- close the circuit breaker.
1 If the circuit breaker trips:
_
- replace the CONTROLLER-LIGHTING (16LF) (Ref. AMM TASK 33-13-51-000-001) and (Ref. AMM TASK 33-13-51-400-001).
a If the fault continues:
_
- do a check for a short to ground at the wiring between the lighting controller (16LF) pin A/A and the circuit breaker (4LF) (Ref. ASM 33-13/01) . if there is a short to ground:
* repair the related wiring. . if there is no short to ground:
* replace the C/B-LIGHTING/INST LT/MAIN INST/PNL AND/PED (4LF).
B. Do the test given in Para. 3.
TASK 33-13-00-810-802
Failure at the Overhead-Panel Integral Lighting
1. Possible Causes
_______________
- CONTROLLER-LIGHTING (6LF)
- PLATE-INT LIGHTED IDENT
- wiring
- POT-INT LT/OVHD INTEG LT (7LF)
- C/B-LIGHTING/INST LT/OVHD/PNL (3LF)
2. Job Set-up Information
______________________
A. Referenced Information
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
IPC 331308 AMM 33-13-00-710-001 Operational Test of the Instrument and Panel Integral
Lighting AMM 33-13-51-000-001 Removal of the Lighting Controller (6LF, 16LF, 30LF) AMM 33-13-51-400-001 Installation of the Lighting Controller (6LF, 16LF,
30LF)
ASM 33-13/01
ASM 33-13/02
33-13-00-991-005 Fig. 203
33-13-00-991-002 Fig. 204
3. Fault Confirmation
__________________
A. Test Do the operational test of the instrument and panel integral-lighting (Ref. AMM TASK 33-13-00-710-001). (Ref. Fig. 203/TASK 33-13-00-991-005)
NOTE : Do this test for the overhead-panel integral lighting only.
____
4. Fault Isolation
_______________
A. If during the operational test when you turn the INT LT/OVHD INTEG LT potentiometer (7LF) from OFF to BRT.
(1) One light of the related integrally lighted panel is inoperative:
- remove the defective lamp or LED of the PLATE-INT LIGHTED IDENT (Ref. IPC 331308).
- make sure that there is a voltage at the lamp socket.
(a) If there is a voltage: