- replace the RHEOSTAT-FLOOD LT/MAIN PNL (35LE) (Ref. IPC 331208).
(b) If there is continuity:
- do a check for 28VDC at pin A/5 of the FLOOD LT/MAIN PNL rheostat (35LE) (Ref. ASM 33-12/02).
「一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一1 EFF : ALL ∞∞33-12-00∞∞∞∞∞∞∞∞∞∞Page 220
Feb 01/98 CES 1 If there is no 28VDC:
_
- do a check and repair the wiring between the FLOOD LT/MAIN PNL rheostat (35LE) pin A/5 and the circuit breaker (1LE) (Ref. ASM 33-12/02).
2 If there is 28VDC:
_
- do a check and repair the wiring from the FLOOD LT/MAIN PNL rheostat (35LE) pin A/4 to the first terminal block (Ref. ASM 33-12/02).
(6) The rheostat of the main instrument panel, on the First Officer side (36LE) is not operative:
- replace the LT-MAIN INSTRUMENT PNL, F/O (36LE) (Ref. AMM TASK 33-12-13-000-001) and (Ref. AMM TASK 33-12-13-400-001).
(a) If the fault continues:
- repair the wiring from the First Officer main instrument panel light (36LE) pin A/B to the first terminal block (Ref. ASM 33-12/02)
(7) The rheostat of the main instrument-panel on the Captain side (37LE) is not operative:
- replace the LT-MAIN INSTRUMENT PNL, CAPT (37LE) (Ref. AMM TASK 33-12-13-000-001) and (Ref. AMM TASK 33-12-13-400-001).
(a) If the fault continues:
- repair the wiring from the Captain main instrument panel light (37LE) pin A/B to the first terminal block (Ref. ASM 33-12/02)
B. Do the test given in Para. 3.
TASK 33-12-00-810-817
Failure of the First Officer Dome Lights and the Captain Main Instrument Panel Light
1. Possible Causes
_______________
- C/B-LIGHTING EMER LT CKPT/DOME (1LE)
2. Job Set-up Information
______________________
A. Referenced Information
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
AMM 33-12-00-710-001 Operational Test of the General Illumination ASM 33-12/02
3. Fault Confirmation
__________________
A. Test Do the operational test of the general illumination (Ref. AMM TASK 33-12-00-710-001).
NOTE : Do this test for the dome lights and the instrument lighting, the
____ supplementary reading lights, the map table lights and the center pedestal light only.
4. Fault Isolation
_______________
A. If, during the operational test, the integral First Officer dome lights, the Captain main instrument panel light (37LE) and one of the center main instrument-panel lights (38LE) do not come on:
- replace the C/B-LIGHTING EMER LT CKPT/DOME (1LE) (Ref. ASM 33-12/02).
B. Do the test given in Para. 3.
TASK 33-12-00-810-818
Failure of the Instrument Panel Flood-Lighting
1. Possible Causes
_______________
- C/B LIGHTING/FLOOD CRT INST/PNL (2LE)
2. Job Set-up Information
______________________
A. Referenced Information
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
AMM 33-12-00-710-001 Operational Test of the General Illumination ASM 33-12/02
3. Fault Confirmation
__________________
A. Test Do the operational test of the general illumination (Ref. AMM TASK 33-12-00-710-001).
NOTE : Do this test for the instrument lighting, the supplementary
____ reading lights, the map table lights and the center pedestal light only.
4. Fault Isolation
_______________
A. If during the operational test, the supplementary reading lights (29LE), the First Officer main instrument-panel light (36LE) and one of the center main instrument-panel lights (38LE) do not come on:
- replace the C/B LIGHTING/FLOOD CRT INST/PNL (2LE) (Ref. ASM 33-12/02).
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320 Trouble Shooting Manual 排故手册 LIGHTS 灯光(24)