• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-03-28 22:45来源:蓝天飞行翻译 作者:航空
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

 - replace the EPSU (11WL) (Ref. AMM TASK 33-51-38-000-001) and (Ref. AMM TASK 33-51-38-400-001).
 (a) If the fault continues:
 - do a check and repair the wiring between: EPSU 11WL pin -I and DEU-B 300RH6 pin B29. EPSU 11WL pin -P and DEU-B 300RH6 pin B31. EPSU 11WL pin X and DEU-B 300RH6 pin B30 (Ref. ASM 33-51/02).
 C. Do the test given in para. 3.
 5. Close-up
________
 A. Put the aircraft back to its initial configuration.
 「一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一1R EFF : 106-149, 301-399, 401-499, ∞∞33-51-00∞∞∞∞∞∞∞∞∞∞Page A277
 Aug 01/05 CES

 TASK 33-51-00-810-859


 Failure of EPSU 12WL to communicate with the CIDS
 1. Possible Causes
_______________
 - EPSU (12WL)

 - wiring


 2. Job Set-up Information
______________________
 A. Referenced Information
 -------------------------------------------------------------------------------
REFERENCE DESIGNATION
 -------------------------------------------------------------------------------
AMM 33-51-00-710-010 Operational Test of the Emergency Lights via MCDU AMM 33-51-38-000-001 Removal of the Emergency Power-Supply Unit (EPSU) AMM 33-51-38-400-001 Installation of the Emergency Power-Supply Unit
 (EPSU)
 ASM 33-51/02

 3. Fault Confirmation
__________________
 A. Do the operational test of the Emergency Lights via MCDU (Ref. AMM TASK 33-51-00-710-010).
 4. Fault Isolation
_______________
 A. If the test gives a different maintenance message, do the trouble shooting procedure related to the maintenance message.
 B. If the operational test gives the maintenance message:
 (1) EPSU(12WL)EMER R/DEU B(300RH6):
 - replace the EPSU (12WL) (Ref. AMM TASK 33-51-38-000-001) and (Ref. AMM TASK 33-51-38-400-001).
 (a) If the fault continues:
 - do a check and repair the wiring between: EPSU 12WL pin -I and DEU-B 300RH6 pin B25. EPSU 12WL pin -P and DEU-B 300RH6 pin B27. EPSU 12WL pin X and DEU-B 300RH6 pin B26 (Ref. ASM 33-51/02).
 C. Do the test given in para. 3.
 5. Close-up
________
 A. Put the aircraft back to its initial configuration.
 「一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一1R EFF : 106-149, 301-399, 401-499, ∞∞33-51-00∞∞∞∞∞∞∞∞∞∞Page A278
 Aug 01/05 CES TASK 33-51-00-810-860


 Failure of EPSU 13WL to communicate with the CIDS
 1. Possible Causes
_______________
 - EPSU (13WL)

 - wiring


 2. Job Set-up Information
______________________
 A. Referenced Information
 -------------------------------------------------------------------------------
REFERENCE DESIGNATION
 -------------------------------------------------------------------------------
AMM 33-51-00-710-010 Operational Test of the Emergency Lights via MCDU AMM 33-51-38-000-001 Removal of the Emergency Power-Supply Unit (EPSU) AMM 33-51-38-400-001 Installation of the Emergency Power-Supply Unit
 (EPSU)
 ASM 33-51/02

 3. Fault Confirmation
__________________
 A. Do the operational test of the Emergency Lights via MCDU (Ref. AMM TASK 33-51-00-710-010).
 4. Fault Isolation
_______________
 A. If the test gives a different maintenance message, do the trouble shooting procedure related to the maintenance message.
 B. If the operational test gives the maintenance message:
 (1) EPSU(13WL)AFT L/DEU B(300RH7):
 - replace the EPSU (13WL) (Ref. AMM TASK 33-51-38-000-001) and (Ref. AMM TASK 33-51-38-400-001).
 (a) If the fault continues:
 - do a check and repair the wiring between: EPSU 13WL pin -I and DEU-B 300RH7 pin B29. EPSU 13WL pin -P and DEU-B 300RH7 pin B31. EPSU 13WL pin X and DEU-B 300RH6 pin B30 (Ref. ASM 33-51/02).
 C. Do the test given in para. 3.
 5. Close-up
________
 A. Put the aircraft back to its initial configuration.
 「一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一1R EFF : 106-149, 301-399, 401-499, ∞∞33-51-00∞∞∞∞∞∞∞∞∞∞Page A279
 Aug 01/05 CES

 

 


 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320 Trouble Shooting Manual 排故手册 LIGHTS 灯光(143)