R **ON A/C 062-099, 106-149, 151-199, 201-299, 301-399, 401-499,
TASK 31-38-00-810-807
Loss of the DLRB Signal to the TCAS
1. Possible Causes
_______________
- ROUTING BOX-DATA LOADING (102TD)
- CMPTR-TCAS (1SG)
- wiring
2. Job Set-up Information
______________________
A. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
AMM 31-38-34-000-001 Removal of the Data Loading Routing Box (102TD) AMM 31-38-34-400-001 Installation of the Data Loading Routing Box (102TD) AMM 34-43-00-610-001 Uploading Procedure with Portable Data Loader (SFIM)
to Load the Operational Software of the TCAS
ASM 31-38/01
3. Fault Confirmation
__________________
A. Do the loading of the correct data base of the TCAS (Ref. AMM TASK 34-43-00-610-001).
4. Fault Isolation
_______________
A. If the fault is identified by the crew observation:
TCAS uploading is not possible.
(1) Do a check for of the aircraft wiring between the ROUTING BOX-DATA LOADING (102TD) and CMPTR-TCAS (1SG) (Ref. ASM 31-38/01):
(a) pin B/48, 15 (102TD) to pin AE/9A, 9B (1SG).
(b) pin A/47, 14 (102TD) to pin AE/8A, 8B (1SG).
(c) pin A/30 (102TD) to pin AE/6A (1SG).
(2) if the fault continues:
- replace the ROUTING BOX-DATA LOADING (102TD) (Ref. AMM TASK 31-38-34-000-001) and (Ref. AMM TASK 31-38-34-400-001).
「一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一1R EFF : 062-099, 106-149, 151-199, 201-299, ∞∞31-38-00∞∞∞∞∞∞∞∞∞∞Page 209
301-399, 401-499, Aug 01/05 CES
B. Do the test given in Para. 3.A.
「一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一1R EFF : 062-099, 106-149, 151-199, 201-299, ∞∞31-38-00∞∞∞∞∞∞∞∞∞∞Page 210
301-399, 401-499, Aug 01/05 CES
DLRB Uploading not Possible
1. Possible Causes
_______________
- ROUTING BOX-DATA LOADING (102TD)
2. Job Set-up Information
______________________
A. Referenced Information
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
AMM 31-38-00-610-003 Uploading Procedure with Portable Data Loader (SFIM)
to Load the Data Base of the Data Loading Routing Box AMM 31-38-34-000-001 Removal of the Data Loading Routing Box (102TD) AMM 31-38-34-400-001 Installation of the Data Loading Routing Box (102TD)
3. Fault Confirmation
__________________
A. Do the loading of the correct data base of the DLRB (Ref. AMM TASK 31-38-00-610-003).
4. Fault Isolation
_______________
A. If the fault is identified by the crew observation:
- the uploading of the DLRB is not possible.
Replace ROUTING BOX-DATA LOADING (102TD) (Ref. AMM TASK 31-38-34-000-001) and (Ref. AMM TASK 31-38-34-400-001).
B. Do the test given in Para. 3.A.
「一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一1R EFF : 062-099, 106-149, 151-199, 201-299, ∞∞31-38-00∞∞∞∞∞∞∞∞∞∞Page 211
301-399, 401-499, Aug 01/05 CES
Failure of the MDDU
1. Possible Causes
_______________
- MDDU
2. Job Set-up Information
______________________
A. Referenced Information
-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
AMM 31-38-22-000-001 Removal of the MDDU (1TD) AMM 31-38-22-400-001 Installation of the MDDU (1TD)
3. Fault Confirmation
__________________
A. Not applicable, the fault is evident.
4. Fault Isolation
_______________
A. If the fault is identified by the crew observation:
UNIT FAIL is displayed on the MDDU display
- replace the MDDU (Ref. AMM TASK 31-38-22-000-001) and (Ref. AMM TASK 31-38-22-400-001).