• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-03-25 18:01来源:蓝天飞行翻译 作者:admin
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

 (2)
 Make sure that the work area is clean and clear of tool(s) and other items.

 (3)
 Close the right MLG door (Ref. TASK 32-12-00-410-001).

 (4)
 Remove the ground support and maintenance equipment, the special and standard tools and all other items.


 1EFF : ALL 1 32-33-12Page 415 1 1 Feb 01/98 1 1 1CES 1 VENT VALVE - MLG (2516GM) - REMOVAL/INSTALLATION


________________________________________________
 TASK 32-33-13-000-001
 Removal of the MLG Vent Valve 2516GM
 WARNING : MAKE SURE THAT ALL THE CIRCUITS IN MAINTENANCE ARE ISOLATED BEFORE
_______ YOU SUPPLY ELECTRICAL POWER TO THE AIRCRAFT.
 WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______ START A TASK ON OR NEAR:
 -
THE FLIGHT CONTROLS

 -
THE FLIGHT CONTROL SURFACES

 -
THE LANDING GEAR AND THE RELATED DOORS


 -COMPONENTS THAT MOVE. WARNING : OBEY THE HYDRAULIC SAFETY PROCEDURES.
_______
 1. Reason for the Job__________________ Self Explanatory
 2. Job Set-up Information______________________
 A. Fixtures, Tools, Test and Support Equipment
 -------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
 -------------------------------------------------------------------------------
No specific blanking plugs
 No specific circuit breaker(s) safety clip(s)
 No specific warning notices
 No specific access platform 1.5 m (4 ft. 11 in.)
 No specific container 5 l (1.3208 USgal)

 1EFF : ALL 1 32-33-13Page 401 1 1 Feb 01/98 1 1 1CES 1 B. Referenced Information


 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
24-41-00-861-002 Energize the Aircraft Electrical Circuits from the
 External Power 29-00-00-910-002 Safety Procedures of the Hydraulic System 29-10-00-864-001 Depressurize the Green Hydraulic System 29-14-00-614-001 Depressurization of the Hydraulic Reservoirs 29-23-00-860-001 Disconnection of the Isolation Coupling of the Power
 Transfer Unit (PTU) R 32-00-00-860-001 Flight Configuration Precautions with Electrical R Power
 32-12-00-010-001 Open the Main Gear Doors for Access
 32-33-13-991-001 Fig. 401

 3. Job Set-up
__________
 Subtask 32-33-13-860-050

 A. Aircraft Maintenance Configuration
 (1) Energize the aircraft electrical circuits (Ref. TASK 24-41-00-861-002)
 (2)
 Depressurize the Green hydraulic system (Ref. TASK 29-10-00-864-001). Subtask 32-33-13-010-050

 B. Get Access

 (1)
 Open the left MLG door (Ref. TASK 32-12-00-010-001).
 Subtask 32-33-13-869-050

 

 C. Disconnection of the PTU Isolation Coupling
 (1)
 Depressurize the reservoir of the Green hydraulic system (Ref. TASK 29-14-00-614-001).

 (2)
 Disconnect the PTU isolation coupling (Ref. TASK 29-23-00-860-001).

 (3)
 Obey the flight configuration precautions (Ref. TASK 32-00-00-860-001).


 1EFF : ALL 1 32-33-13Page 402 1 1 Feb 01/05 1 1 1CES 1


 (4) Put the container below the MLG vent valve 2516GM to collect the hydraulic fluid leakage.
 Subtask 32-33-13-865-050
 D. Open, safety and tag this(these) circuit breaker(s):
 -------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
 -------------------------------------------------------------------------------
R 49VU L/G/LGCIU/SYS1/NORM 1GA C09 121VU HYDRAULIC/LGCIU/SYS2 2GA Q35 121VU HYDRAULIC/LGCIU/SYS1/GRND SPLY 52GA Q34 121VU HYDRAULIC/G HYD/PUMP ENG1/CTL 1701GK R35 121VU HYDRAULIC/G HYD/PUMP ENG1/MONG 1702GK R34
 Subtask 32-33-13-941-050
 E. Safety Precautions
 (1)
 Put the access platform in position.

 (2)
 Put the warning notices in position to tell persons not to pressurize the Green hydraulic system: - on the panel 40VU in the cockpit, - on the ground service panel of the Green hydraulic system.


 4. Procedure
_________
 (Ref. Fig. 401/TASK 32-33-13-991-001)

 Subtask 32-33-13-020-050
 A. Removal of the MLG Vent Valve 2516GM
 (1)
 Obey the hydraulic safety procedures (Ref. TASK 29-00-00-910-002).

 (2)
 Remove and discard the cotter pin (18).

 (3)
 Remove the nut (19), the washer (20), the bolt (22), the bush (21) and move the rod (1) away from the lever (17).
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM LANDING GEAR 起落架6(6)