(2)
Install the wheel chocks at the main landing gear.
1EFF : ALL 1 32-41-00Page 409 1 1 Aug 01/05 1 1 1CES 1 **ON A/C 051-099,
Subtask 32-41-00-941-053-A
A. Safety Precautions
(1)
On the panel 400VU:
-put a warning notice in position to tell persons not to operate the landing gear control lever.
(2)
Install the wheel chocks at the main landing gear.
(3)
Fully deflate the tire on the related NLG wheel (Ref. TASK 12-14-32-614-001).
Subtask 32-41-00-865-056
B. Open, safety and tag this(these) circuit breaker(s):
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
121VU HYDRAULIC/TIRE/PRESS 1GV M31
**ON A/C ALL
4. Procedure
_________ R **ON A/C 001-049, 101-149, 151-199, 201-299, 301-399, 401-499,
(Ref. Fig. 401/TASK 32-41-00-991-010)
**ON A/C 051-099,
(Ref. Fig. 401A/TASK 32-41-00-991-010-A)
1EFF : ALL 1 32-41-00Page 410 1 1 Aug 01/05 1 1 1CES 1R **ON A/C 001-049, 101-149, 151-199, 201-299, 301-399, 401-499,
Subtask 32-41-00-440-051
A. Reactivation of the Nose Wheel Hubcap
(1)
Install the hubcap (1).
(2)
Install the washers (3) and the screw (2).
(3)
Safety them with lockwire-corrosion resistant steel dia. 0.8 mm
(0.032 in.).
**ON A/C 051-099,
Subtask 32-41-00-440-051-A
A. Reactivation of the Nose Wheel Hubcap
(1)
Install the rotating mechanism (Ref. TASK 32-49-17-400-001).
(2)
Remove and discard the cotter pin (8).
(3)
Remove the nut (7).
(4)
Remove the seal plug (6).
(5)
Remove and discard the seals (2) on the shaft (1).
(6)
Clean the shaft (1) with CLEANING AGENTS (Material No. 11-002). Dry it with dry filtered compressed-air.
(7)
Apply a thin layer of COMMON GREASE (Material No. 04-004) to the shaft (1).
(8)
Install the new seals (2) to the shaft (1).
(9)
Install the pressure transducer (3).
(10)
Install the nut (5) and tighten it.
(11)
Safety the nut (5) with the new cotter pin (4).
(12)
Remove the blanking cap from the connector (15).
1EFF : ALL 1 32-41-00Page 411 1 1 Aug 01/05 1 1 1CES 1
R (13) Connect the electrical connector (14) to the connector (15).
R (14) Install the grommet (13). Put the cover (9) in position. Install the
R drive (10) in its housing.
R (15) Install the washers (12) and the screws (11).
R (16) Tighten the screws (11) and safety them with lockwire-corrosion
R resistant steel dia. 0.8 mm (0.032 in.).
R Subtask 32-41-00-614-050
R B. Inflate the tire on the related NLG wheel (Ref. TASK 12-14-32-614-001).
R Subtask 32-41-00-720-051
R C. Do the functional test of the tire pressure indicating system (Ref. TASK
R 32-49-00-720-001).
R **ON A/C ALL
5. Close-up________
Subtask 32-41-00-942-053
A. Removal of Equipment
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Remove the warning notice(s).
(3) Remove the wheel chocks at the main landing gear.
R **ON A/C 051-099,
R Subtask 32-41-00-865-057
R B. Remove the safety clip(s) and the tag(s) and close this(these) circuit
R breaker(s):
R 1GV
R 1EFF : ALL 1 32-41-00Page 412 1 1 May 01/05 1 1 1CES 1R **ON A/C ALL
TASK 32-41-00-040-002
Check of the Nose Wheel when one tie bolt is missing
1. Reason for the Job
__________________
Refer to the MMEL TASK: 32-41-01
Nose Wheel Tie Bolts
2.
Job Set-up Information
______________________
Not Applicable
3.
Job Set-up
__________
Subtask 32-41-00-941-056
A. Not applicable
4. Procedure
_________
Subtask 32-41-00-210-073
A. Check of the related Nose Wheel
(1)
Make sure that no broken pieces of the tie bolt are in the wheel. If there are pieces of the tie bolt in the wheel, remove them.
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM LANDING GEAR 起落架6(49)