• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-03-25 18:01来源:蓝天飞行翻译 作者:admin
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

 -
the swivel-cable-guides (59) (between the flanges)

 -
the sleeve (63) and the retaining ring (64)

 -
the washers (61) and the bolts (62).

 


 1EFF : ALL 1 32-33-16Page 439 1 1 Feb 01/03R 1 1 1CES 1


 (a)
 Tighten the bolts (62).

 (b)
 Safety the bolts (62) with the MISCELLANEOUS (Material No. 19-010).

 (c)
 Install these items at the cable pulley brackets:

 -
the tubes (52) and the washers (53)

 -
the tubes (57) and the washers (56)

 -
the guide bolt (68), the washer (67) and the nut (66).

 

 (d)
 Safety the tubes with the new cotter-pin (54) and cotter-pin (55).


 Subtask 32-33-16-420-055
 E. Installation of the MLG Free-Fall Extension Cables (25) and/or (27) (Ref. Fig. 406/TASK 32-33-16-991-003)
 (1)
 Apply the SEALANTS (Material No. 09-019) to the bolt heads (62) and to the outer edges of the pressure-seal-flanges (58) and (60).

 (2)
 When the sealant is dry apply the STRUCTURE PAINTS (Material No. 16-003) to the pressure-seal-flanges (58) and (60).

 (3)
 Put the cable(s) (25) and/or (27) in the structure.

 (4)
 Attach the cable(s) (25) and/or (27) to the pulley (26).

 (5)
 Release the cable(s) (13) and/or (15) from the structure.

 (6)
 Connect each cable as necessary to its related cable with the turnbuckle(s) (23).

 (7)
 Temporarily attach the locking clips (24).

 (8)
 Install the cable-guide-fairleads (21) and the locking-devices (22) for the applicable cable(s).

 (9)
 For the cable (27), install these items at the bracket (2) on the FR


 12:
 -
the spacer (3)

 -
the bolt (1)

 -
the washer (6)

 -
the nut (5).


 (10) Tighten the nut (5).
 1EFF : ALL 1 32-33-16Page 440 1 1 Feb 01/03R 1 1 1CES 1


 (11)
 Safety the nut (5) with a new cotter-pin (4).

 (12)
 Install these items together:

 -
the cable-guard(s) (17)

 -
the spacers (19)

 -
the bolts (18)

 -
the nuts (20).

 


 (13)
 Tighten the nuts (20). Subtask 32-33-16-420-056

 F. Installation of the MLG Free-Fall Extension Cables (13) and/or (15)
 (Ref. Fig. 406/TASK 32-33-16-991-003)

 (1)
 Put the cable(s) (13) and/or (15) in the structure.

 (2)
 Connect the cable (13) to the top of the pulley (16).

 (3)
 Connect the cable (15) to the bottom of the pulley (16).

 (4)
 Safety the cable(s) (13) and /or (15) with a new cotter pin (14).

 (5)
 Release the cable(s) (25) and/or (27) from the structure.

 (6)
 Connect each cable as necessary to its related cable with the turnbuckle(s) (23).

 (7)
 Temporarily attach the locking clips (24).

 (8)
 Install the cable-guide-fairleads (21) and the locking-devices (22) for the applicable cable(s).

 (9)
 Install these items together:

 -
the tubes (7) and the washers (9)

 -
the tube (10) and the washer (12).

 


 (10) Safety the tubes (7) with new cotter-pins (8).

 (11)
 Safety the tube (10) with a new cotter pin (11). Subtask 32-33-16-820-051


 G. Adjust the Tension of the Cables
 (1) Adjust the tension of the free-fall extension system cables that have been loosened or replaced (Ref. TASK 32-33-00-820-003).
 1EFF : ALL 1 32-33-16Page 441 1 1 Feb 01/03 1 1 1CES 1 Subtask 32-33-16-220-051


 H. Cable Tension Check
 (1) Do a cable tension check on the free-fall extension system cables that were not loosened or replaced (Ref. TASK 32-33-00-200-001).
 Subtask 32-33-16-080-051
 J. Remove the Rigging Pins
 (1)
 For the cables (37), (38), (39) and (40): (Ref. Fig. 402/TASK 32-33-16-991-001, 407/TASK 32-33-16-991-004, 408/TASK 32-33-16-991-005)

 -the RIGGING PIN in the position Pin 2
 -RIGGING PIN in the applicable position Pin 3.

 (2)
 For the cables (13), (15), (25) and (27): (Ref. Fig. 402/TASK 32-33-16-991-001, 406/TASK 32-33-16-991-003)


 -the RIGGING PIN at position Pin 1
 -the RIGGING PIN at position Pin 2. Subtask 32-33-16-410-052
 K. Close Access
 (1)
 Make sure that the work area is clean and clear of tool(s) and other items.
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM LANDING GEAR 起落架6(29)