• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-03-25 18:01来源:蓝天飞行翻译 作者:admin
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

 (2)
 Do a check of the wheel for damage, no damage is permitted.


 5. Close-up
________
 Subtask 32-41-00-942-055

 A. Aircraft Maintenance Configuration
 (1)
 Make sure that the work area is clean and clear of tool(s) and other items.

 (2)
 Make an entry in the log book.


R 1EFF : ALL 1 32-41-00Page 413 1 1 May 01/05 1 1 1CES 1


 TASK 32-41-00-040-003 Check of the Main Wheel when one tie bolt is missing
 1. Reason for the Job
__________________
 Refer to the MMEL TASK: 32-41-02
 Main Wheel Tie Bolts

 2. Job Set-up Information
______________________
 A. Referenced Information
 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
32-41-11-000-006  Removal of the MLG Wheel (2649GM,2650GM,2651GM,2652GM) 32-41-11-400-006 Installation of the MLG Wheel (2649GM,2650GM,2651GM,2652GM)
 3. Job Set-up
__________ Subtask 32-41-00-941-057
 A. Not applicable
 4. Procedure
_________ Subtask 32-41-00-210-074
 A. Check of the related Main Wheel
 (1)
 Remove the related main wheel (Ref. TASK 32-41-11-000-006).

 (2)
 Make sure that no broken pieces of the tie bolt are in the wheel. If there are pieces of the tie bolt in the wheel, remove them.

 (3)
 Do a check the wheel for damage, no damage is permitted.

 (4)
 Install the main wheel (Ref. TASK 32-41-11-400-006).


R 1EFF : ALL 1 32-41-00Page 414 1 1 May 01/05 1 1 1CES 1


 5. Close-up
________ Subtask 32-41-00-942-056
 A. Aircraft Maintenance Configuration
 (1)
 Make sure that the work area is clean and clear of tool(s) and other items.

 (2)
 Make an entry in the log book.


R 1EFF : ALL 1 32-41-00Page 415 1 1 May 01/05 1 1 1CES 1R **ON A/C 001-049, 101-149, 151-199, 201-299,


 TASK 32-41-00-040-004
 Deactivation of the Main Wheel Hupcap

 1. Reason for the Job
__________________
 Refer to the CDL TASK: 32-2
 Main Wheel Hubcap

 2. Job Set-up Information
______________________
 A. Fixtures, Tools, Test and Support Equipment
 -------------------------------------------------------------------------------REFERENCE QTY DESIGNATION -------------------------------------------------------------------------------
No specific circuit breaker(s) safety clip(s)
 No specific warning notice
 No specific wheel chocks

 B. Referenced Information
 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
07-12-00-582-002 Jacking for Main Gear Wheel Change
 29-24-00-863-001 Pressurize the Yellow Hydraulic System with the
 Electric Pump
 32-41-00-991-035 Fig. 402

 3. Job Set-up
__________
 Subtask 32-41-00-941-058

 A. Safety Precautions
 (1)
 On the panel 400VU:

 -put a warning notice in position to tell persons not to operate the landing gear control lever.

 (2)
 Make sure that the wheel chocks are in position.


R 1EFF : 001-049, 101-149, 151-199, 201-299, 1 32-41-00Page 416 1 1 May 01/05 1 1 1CES 1 Subtask 32-41-00-865-058


 B. Open, safety and tag this(these) circuit breaker(s):
 -------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------121VU HYDRAULIC/BRAKING AND STEERING/SYS2/SPLY 4GG M36 121VU HYDRAULIC/BRAKING AND STEERING/SYS2/CTL 3GG M35 121VU HYDRAULIC/BRAKING AND STEERING/SYS1/CTL 1GG M34 121VU HYDRAULIC/BRAKING AND STEERING/SYS1/IND AND/SPLY 2GG M33
 Subtask 32-41-00-860-057
 C. Aircraft Maintenance Configuration
 (1)
 On the panel 110VU :

 -make sure that the PARK BRK control switch is set to ON.

 (2)
 On the panel 400VU:

 -make sure that the brake pressure indication on the Yellow brake-pressure triple indicator is correct.
 -If necessary pressurize the brake accumulator with the Yellow pump (Ref. TASK 29-24-00-863-001).

 (3)
 Lift the related axle with a jack (Ref. TASK 07-12-00-582-002).

 (4)
 Fully deflate the tire.


 4. Procedure
_________ (Ref. Fig. 402/TASK 32-41-00-991-035) Subtask 32-41-00-040-052
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM LANDING GEAR 起落架6(50)