• 热门标签

当前位置: 主页 > 航空资料 > 机务资料 >

时间:2011-03-25 18:01来源:蓝天飞行翻译 作者:admin
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者

 13  packing  32-42-03 04A-160
 13  packing  32-42-03 04C-160 

R 1EFF : 001-049, 051-099, 101-149, 151-199, 1 32-42-13Page 408 1201-299, 301-399, 1Aug 01/05 1 1 1CES 1 D. Referenced Information


 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
12-12-29-611-001 Fill the Hydraulic Fluid Reservoir with a Hand Pump 12-14-32-614-002 Nitrogen Filling of the Yellow Hydraulic System,
 Brake Pressure Accumulator 29-00-00-910-002 Safety Procedures of the Hydraulic System 29-10-00-864-001 Depressurize the Green Hydraulic System 29-10-00-864-002 Depressurize the Yellow Hydraulic System 29-14-00-614-001 Depressurization of the Hydraulic Reservoirs 32-12-00-410-001 Close the Main Gear Doors after Access 32-42-00-710-001 Operational Check of the Normal Braking System 32-42-00-870-001 Bleeding of the Normal Braking at the Brake Units 32-43-00-710-001 Operational Check of Alternate Braking System 32-43-00-870-002 Bleeding of the High Pressure Alternate Braking
 System 51-75-13-916-002 Repair to a layer of Corrosion Preventive Compound
 **ON A/C 001-001, 051-052,
 32-42-13-991-001 Fig. 401
 **ON A/C 002-049, 053-099, 101-149, 151-199, 201-299, 301-399,
 32-42-13-991-001-A Fig. 401A
R **ON A/C 001-049, 051-099, 101-149, 151-199, 201-299, 301-399,
 3. Job Set-up
__________
 Subtask 32-42-13-860-051
 A. Aircraft Maintenance Configuration
 (1)
 Make sure that the Green and Yellow hydraulic systems are depressurized (Ref. TASK 29-10-00-864-001). and (Ref. TASK 29-10-00-864-002).

 (2)
 Make sure that the reservoirs of the Green and Yellow hydraulic systems are depressurized (Ref. TASK 29-14-00-614-001).


R 1EFF : 001-049, 051-099, 101-149, 151-199, 1 32-42-13Page 409 1201-299, 301-399, 1Aug 01/05 1 1 1CES 1 Subtask 32-42-13-865-053


 B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged
 -------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------121VU HYDRAULIC/BRAKING AND STEERING/SYS2/SPLY 4GG M36 121VU HYDRAULIC/BRAKING AND STEERING/SYS2/CTL 3GG M35 121VU HYDRAULIC/BRAKING AND STEERING/SYS1/CTL 1GG M34 121VU HYDRAULIC/BRAKING AND STEERING/SYS1/IND AND/SPLY 2GG M33 121VU HYDRAULIC/HYD POWER/Y 3803GX N30 121VU HYDRAULIC/Y HYD/PUMP ENG2/MONG 3700GD Q37 121VU HYDRAULIC/Y HYD/PUMP ENG2/CTL 3701GD Q36 121VU HYDRAULIC/G HYD/PUMP ENG1/CTL 1701GK R35 121VU HYDRAULIC/G HYD/PUMP ENG1/MONG 1702GK R34 123VU Y HYD/ELEC/PUMP 3802GX AB06 123VU Y HYD/ELEC/ELEC PUMP/NORM 3801GX AB03
 Subtask 32-42-13-941-051
 C. Safety Precautions
 (1) Make sure that the warning notices are in position to tell persons not to pressurize the Green or Yellow hydraulic systems: - on the panel 40VU in the cockpit, - on the ground service panel of the Green hydraulic system, - on the ground service panel of the Yellow hydraulic system.
 **ON A/C 001-001, 051-052,
 Subtask 32-42-13-560-050
 D. Preparation of the Replacement Component
 (1)
 Remove the unions (3). Remove and discard the packings (4) from the unions (3).

 (2)
 Remove the restrictor (8). Remove and discard the packing (9) from the restrictor (8).

 (3)
 Remove the unions (10). Remove and discard the packings (9) from the unions (10).


R 1EFF : 001-049, 051-099, 101-149, 151-199, 1 32-42-13Page 410 1201-299, 301-399, 1Aug 01/05 1 1 1CES 1


 (4)
 Remove the reducer (14). Remove and discard the packing (13) from the reducer (14).

 (5)
 Obey the hydraulic safety proceures (Ref. TASK 29-00-00-910-002).

 (6)
 Apply HYDRAULIC FLUIDS (Material No. 02-003), HYDRAULIC FLUIDS (Material No. 02-003A), HYDRAULIC FLUIDS (Material No. 02-003B), HYDRAULIC FLUIDS (Material No. 02-003C) or HYDRAULIC FLUIDS (Material No. 02-003D) to:

 -
the threads of the unions (3) and (10),

 -
the threads of the restrictor (8),

 -
the threads of the reducer (14),

 -
the new packings (4), (9) and (13).

 

 (7)
 Put the new packings (4) on the unions (3).

 (8)
 Put the new packings (9) on the restrictor (8) and the unions (10).

 (9)
 Put the new packing (13) on the reducer (14).


 (10)
 Remove the blanking plugs.

 (11)
 Install the unions (3) in the automatic selector (5).

 (12)
 TORQUE the unions (3) to between 1.08 and 1.19 m.daN (95.57 and
 
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM LANDING GEAR 起落架6(148)