-------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
12-11-28-650-003 Pressure Refuel with Automatic Control
27-50-00-866-008 27-50-00-866-009 27-60-00-866-002 28-10-00-910-001 28-10-00-910-002 Extension of the Flaps on the GroundRetraction of the Flaps on the GroundExtension-Retraction of the Spoilers for MaintenanceSafety Procedures When You Do Work in a Fuel TankAccess to the Fuel Tanks and the Work Areas
28-25-00-650-001 Pressure Defuel
28-25-00-650-003 To Drain Remaining Fuel from the Wing Tanks and the Center Tank
57-27-11-000-002 Removal of the Access Panel (540HB, 540JB, 540KB, 540LB, 540MB, 540NB, 540PB, 540QB, 540RB, 550AB,
550BB, 550CB, 550DB, 560AB, 640HB, 640JB, 640KB,
57-27-11-400-002 ....)Installation of the Access Panel (540HB, 540JB, 540KB, 540LB, 540MB, 540NB, 540PB, 540QB, 540RB,
550AB, 550BB, 550CB, 550DB, 560AB, 640HB, 640JB,
57-51-37-000-004 ....)Removal of the Access Panels
28-21-53-991-001 FOR FIN 66QM, 67QM 575AB/575BB/575CB/575DB/575EB/575FB/575GB/575HB (675AB/675BB/675CB/675DB/675EB/675FB/675GB/675HB)Fig. 401
R 1EFF : 001-049, 051-099, 101-149, 151-199, 1 28-21-53Page 408 1201-299, 401-499, 1Aug 01/05 1 1 1CES 1 -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------
57-51-37-400-004 Installation of the Access Panels 575AB/575BB/575CB/575DB/575EB/575FB/575GB/ 575HB (675AB/675BB/675CB/675DB/675EB/675FB/675GB/675HB)
FOR FIN 68QM, 69QM
57-51-37-400-004 Installation of the Access Panels 575AB/575BB/575CB/575DB/575EB/575FB/575GB/ 575HB (675AB/675BB/675CB/675DB/675EB/675FB/675GB/675HB)
3. Job Set-up
__________
Subtask 28-21-53-941-058
A. Safety Precautions
WARNING : OBEY THE SAFETY PROCEDURES WHEN YOU DO WORK IN A FUEL TANK.
_______
(1)
You must obey the fuel safety procedures (Ref. TASK 28-10-00-910-001) when you do work in a fuel tank.
(2)
Put the safety barriers in position.
(3)
Make sure that the warning notice is in the cockpit to tell persons not to operate the flight controls.
Subtask 28-21-53-865-052
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged
-------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------121VU FUEL/L WING TK/PUMP2 SPLY 7QA N26 121VU FUEL/L WING TK/PUMP1 SPLY 1QA N23 121VU FUEL/R WING TK/PUMP2 SPLY 8QA Q26 121VU FUEL/R WING TK/PUMP1 SPLY 2QA Q23 123VU L WING TK/PUMP 1/STBY SPLY 11QA AD12 123VU R WING TK/PUMP 1/STBY SPLY 12QA AE12
R 1EFF : 001-049, 051-099, 101-149, 151-199, 1 28-21-53Page 409 1201-299, 401-499, 1Aug 01/05 1 1 1CES 1 Subtask 28-21-53-860-051
C. Aircraft Maintenance Configuration
(1)
Make sure that the applicable fuel tank is defueled (Ref. TASK 28-25-00-650-001).
(2)
Make sure that the remaining fuel has been drained from the applicable fuel tank (Ref. TASK 28-25-00-650-003).
(3)
Make sure that the flaps are fully extended (Ref. TASK 27-50-00-866-008).
(4)
Make sure the the LOCKING TOOL - FLAP/SLAT CONTROL LEVER
(98D27803000000) is on the slat/flap control lever.
(5)
Make sure that the applicable spoiler No. 3 is extended (Ref. TASK 27-60-00-866-002).
(6)
Make sure that the COLLAR-SAFETY, SPOILER (98D27604000000) is on the applicable spoiler No. 3 servo-control.
(7)
Make sure that the access platform is below the applicable zone 540(640) and 575(675).
(8)
Make sure that the applicable access is removed (Ref. TASK 28-10-00-910-002), (Ref. TASK 57-27-11-000-002):
-
FOR 66QM, 67QM
access panel 540KB
-
FOR 68QM, 69QM
access panel 640KB.
(9)
Make sure that the applicable access panel 575DB(675DB) is removed (Ref. TASK 57-51-37-000-004).
R 1EFF : 001-049, 051-099, 101-149, 151-199, 1 28-21-53Page 410 1201-299, 401-499, 1Aug 01/05 1 1 1CES 1
4. Procedure
中国航空网 www.aero.cn
航空翻译 www.aviation.cn
本文链接地址:A320飞机维护手册 AMM FUEL 燃油3(95)